Home / Browse projects / Vadodara, Gujarat / AMBE RESIDENCY

Valid until 31 Mar 2022 Mixed Development project

AMBE RESIDENCY

By AMBE ENTERPRISE

RG-GJ-22138 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX2/011021 · Last updated on GujRERA portal: 7 Mar 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • Separate project account declared
Mar 2022Possession promisedmoved 27 months from the original
48 of 48Construction stages doneacross 8 buildings; every applicable stage filed complete
1 of 178Units unsoldnot recorded sold or booked
Jump to the 45 documents Report an error

AMBE RESIDENCY is a Mixed Development project by AMBE ENTERPRISE in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX2/011021 on 23 May 2018. Possession is promised by 31 Mar 2022. The completion date has moved by 27 months from the original filing. 177 of the 178 units on this registration are recorded sold or booked, and 48 of 48 construction stages are filed complete.

At a glance

Project

  • NameAMBE RESIDENCY
  • TypeMixed Development
  • Location
    • BEHIND AMBE VIDHYALAYA
    • SAMA SAVLI ROAD
    • Vemali
    • Vadodara
    • 390022
  • Pincode390022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX2/011021
  • ReraGenie IDRG-GJ-22138

Builder

  • NameAMBE ENTERPRISE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredMay 2018First promiseDec 2019Revised toMar 2022

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2022
  • Registered on23 May 2018
  • Promised completion31 Mar 2022
  • Revised completionRevised to 31 Mar 2022 (originally 31 Dec 2019)
  • Buildings8 building records
  • Documents filed45 files

Current status

99%177 of 178 units booked
100.0%Of the estimated cost spent so far

Figures as on 7 Mar 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E---20020
F---20020
G---20020
H---20020
A---161430
B---161228
C---20020
D---20020

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 7 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 48 construction stages are filed complete across 8 buildings.

E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,722 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 14.64 cr
Cost incurredRs 14.64 cr
Spent of the estimate99.99%
BuildingWingEstimatedIncurred
ANARs 1.83 crRs 1.83 cr
BNARs 1.83 crRs 1.83 cr
CNARs 1.83 crRs 1.83 cr
DNARs 1.83 crRs 1.83 cr
ENARs 1.83 crRs 1.83 cr
FNARs 1.83 crRs 1.83 cr
GNARs 1.83 crRs 1.83 cr
HNARs 1.83 crRs 1.83 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN STUDIO
EngineerAASHUTOSH A DESAI

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX1/030320Applied Feb 2020; approved Mar 2020
PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX2/011021Applied Jun 2021; approved Oct 2021

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA02726/EX2/011021 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Mar 2022
Engineer's certificate (Form 2)7 Mar 2022
Engineer's certificate annexure7 Mar 2022
Accountant's certificate (Form 3)7 Mar 2022
Site photograph, E7 Mar 2022
Site photograph, F7 Mar 2022
Site photograph, G7 Mar 2022
Site photograph, H7 Mar 2022
Site photograph, A7 Mar 2022
Site photograph, B7 Mar 2022
Site photograph, C7 Mar 2022
Site photograph, D7 Mar 2022
RERA registration certificate23 May 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Vadodara

99%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 27 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep AMBE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vemali2,900+ in Vadodara

2 kmAMBE RESIDENCYOther 200Dot size: filed unitsN

Filed coordinates, straight-line distance. 200 registered projects within 2 km.

Builder: AMBE ENTERPRISE

AMBE ENTERPRISE has 1 registration on GujRERA, including AMBE RESIDENCY. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if AMBE RESIDENCY is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AMBE RESIDENCY?

The registered promoter entity is AMBE ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AMBE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AMBE RESIDENCY?

The professionals named in the filing: Architect: DESIGN STUDIO; Engineer: AASHUTOSH A DESAI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AMBE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AMBE RESIDENCY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AMBE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.