Red flags

  • Completion date moved by 34 months
  • 3 extensions taken

Clear

  • Nothing verified clear yet
Apr 2024Possession promisedmoved 34 months from the original
638 of 638Construction stages doneacross 80 buildings; every applicable stage filed complete
33 of 79Units unsoldnot recorded sold or booked
Jump to the 117 documents Report an error

Alpine Woods is a Residential/Group Housing project by ALPINE HOLDINGS in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/SANAND/AUDA/RAA02387/EX2/041022 on 16 Apr 2018. Possession is promised by 30 Apr 2024. The completion date has moved by 34 months from the original filing. 46 of the 79 units on this registration are recorded sold or booked, and 638 of 638 construction stages are filed complete.

At a glance

Project

  • NameAlpine Woods
  • TypeResidential/Group Housing
  • Location
    • Alpine Woods
    • B/h Eklavya School
    • Sanathal
    • Sanand
    • Ahmedabad
    • 382210
  • Pincode382210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/SANAND/AUDA/RAA02387/EX2/041022
  • ReraGenie IDRG-GJ-85362

Builder

  • NameALPINE HOLDINGS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredApr 2018First promiseJun 2021Revised toApr 2024

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2024
  • Registered on16 Apr 2018
  • Promised completion30 Apr 2024
  • Revised completionRevised to 30 Apr 2024 (originally 30 Jun 2021)
  • Buildings80 building records
  • Documents filed117 files

Current status

58%46 of 79 units booked
100.0%Of the estimated cost spent so far

Figures as on 16 Nov 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
19---101
20---101
21---101
22---101
23---101
24---101
25---101
26---101
27---101
28---101
29---101
30---101
31---101
32---101
33---101
34---101
35---101
36---101
37---101
38---101
39---101
40---101
41---101
41A---101
42---101
42A---101
43---101
44---101
45---101
46---101
47---101
48---101
49---101
50---101
51---101
52---101
53---101
54---101
55---101
56---101
57---101
58---101
59---101
60---101
61---101
62---101
63---101
64---101
65---101
66---101
67---101
68---101
69---101
70---101
70A---101
70B---101
71---101
72---101
73---101
74---101
75---101
CLUBHOUSE------
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 16 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 80 buildings; the table lists the first 20.

638 of 638 construction stages are filed complete across 80 buildings.

19100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
20100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
21100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
22100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
23100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
24100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
25100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
26100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
27100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
28100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
29100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
30100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
31100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
32100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
33100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
34100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
35100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
36100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
37100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
38100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 16 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area30,352 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 31.69 cr
Cost incurredRs 31.69 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
1NARs 40.11 lakhRs 40.11 lakh
2NARs 40.11 lakhRs 40.11 lakh
3NARs 40.11 lakhRs 40.11 lakh
4NARs 40.11 lakhRs 40.11 lakh
5NARs 40.11 lakhRs 40.11 lakh
6NARs 40.11 lakhRs 40.11 lakh
7NARs 40.11 lakhRs 40.11 lakh
8NARs 40.11 lakhRs 40.11 lakh
9NARs 40.11 lakhRs 40.11 lakh
10NARs 40.11 lakhRs 40.11 lakh
11NARs 40.11 lakhRs 40.11 lakh
12NARs 40.11 lakhRs 40.11 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectApurva Amin
EngineerApurva

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/SANAND/AUDA/RAA02387/EX1/300721Applied May 2021; approved Jul 2021
PR/GJ/AHMEDABAD/SANAND/AUDA/RAA02387/EX2/041022Applied Jul 2022; approved Oct 2022
ExtensionApplied Jan 2025; no approval date filed

Documents filed117

As listed on the registration, under the names the promoter filed them with; the newest 80 of 117 are shown. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/SANAND/AUDA/RAA02387/EX2/041022 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)16 Nov 2022
Architect's certificate (Form 1)4 Nov 2022
Engineer's certificate (Form 2)4 Nov 2022
Engineer's certificate annexure4 Nov 2022
Site photograph, CLUBHOUSE4 Nov 2022
Site photograph, 191 Nov 2022
Site photograph, 201 Nov 2022
Site photograph, 211 Nov 2022
Site photograph, 221 Nov 2022
Site photograph, 231 Nov 2022
Site photograph, 241 Nov 2022
Site photograph, 251 Nov 2022
Site photograph, 261 Nov 2022
Site photograph, 271 Nov 2022
Site photograph, 281 Nov 2022
Site photograph, 291 Nov 2022
Site photograph, 301 Nov 2022
Site photograph, 311 Nov 2022
Site photograph, 321 Nov 2022
Site photograph, 331 Nov 2022
Site photograph, 341 Nov 2022
Site photograph, 351 Nov 2022
Site photograph, 361 Nov 2022
Site photograph, 371 Nov 2022
Site photograph, 381 Nov 2022
Site photograph, 391 Nov 2022
Site photograph, 401 Nov 2022
Site photograph, 411 Nov 2022
Site photograph, 41A1 Nov 2022
Site photograph, 421 Nov 2022
Site photograph, 42A1 Nov 2022
Site photograph, 431 Nov 2022
Site photograph, 441 Nov 2022
Site photograph, 451 Nov 2022
Site photograph, 461 Nov 2022
Site photograph, 471 Nov 2022
Site photograph, 481 Nov 2022
Site photograph, 491 Nov 2022
Site photograph, 501 Nov 2022
Site photograph, 511 Nov 2022
Site photograph, 521 Nov 2022
Site photograph, 531 Nov 2022
Site photograph, 541 Nov 2022
Site photograph, 551 Nov 2022
Site photograph, 561 Nov 2022
Site photograph, 571 Nov 2022
Site photograph, 581 Nov 2022
Site photograph, 591 Nov 2022
Site photograph, 601 Nov 2022
Site photograph, 611 Nov 2022
Site photograph, 621 Nov 2022
Site photograph, 631 Nov 2022
Site photograph, 641 Nov 2022
Site photograph, 651 Nov 2022
Site photograph, 661 Nov 2022
Site photograph, 671 Nov 2022
Site photograph, 681 Nov 2022
Site photograph, 691 Nov 2022
Site photograph, 701 Nov 2022
Site photograph, 70A1 Nov 2022
Site photograph, 70B1 Nov 2022
Site photograph, 711 Nov 2022
Site photograph, 721 Nov 2022
Site photograph, 731 Nov 2022
Site photograph, 741 Nov 2022
Site photograph, 751 Nov 2022
Site photograph, 11 Nov 2022
Site photograph, 21 Nov 2022
Site photograph, 31 Nov 2022
Site photograph, 41 Nov 2022
Site photograph, 51 Nov 2022
Site photograph, 61 Nov 2022
Site photograph, 71 Nov 2022
Site photograph, 81 Nov 2022
Site photograph, 91 Nov 2022
Site photograph, 101 Nov 2022
Site photograph, 111 Nov 2022
Site photograph, 121 Nov 2022
Site photograph, 131 Nov 2022
Site photograph, 141 Nov 2022

How this compares with Ahmedabad

58%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 34 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep Alpine Woods on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Sanathal5,400+ in Ahmedabad

2 kmAlpine WoodsOther 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: ALPINE HOLDINGS

ALPINE HOLDINGS has 1 registration on GujRERA, including Alpine Woods. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if Alpine Woods is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Alpine Woods?

The registered promoter entity is ALPINE HOLDINGS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Alpine Woods?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Alpine Woods?

The professionals named in the filing: Architect: Apurva Amin; Engineer: Apurva. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Alpine Woods?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Alpine Woods. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Alpine Woods to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.