Valid until 31 Jul 2022 Residential/Group Housing project

Akshar Yug

By Akshar Buildcon

RG-GJ-88753 · RERA PR/GJ/VADODARA/VADODARA/Others/RAA01610/EX1/041022 · Last updated on GujRERA portal: 25 Jun 2022

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jul 2022Possession promisedmoved 12 months from the original
3098 of 3098Construction stages doneacross 350 buildings; every applicable stage filed complete
5 of 350Units unsoldnot recorded sold or booked
Jump to the 387 documents Report an error

Akshar Yug is a Residential/Group Housing project by Akshar Buildcon in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/RAA01610/EX1/041022 on 12 Feb 2018. Possession is promised by 31 Jul 2022. The completion date has moved by 12 months from the original filing. 345 of the 350 units on this registration are recorded sold or booked, and 3098 of 3098 construction stages are filed complete.

At a glance

Project

  • NameAkshar Yug
  • TypeResidential/Group Housing
  • Location
    • Akshar Yug
    • opp. Gayatri Mandir
    • waghodia road
    • MU pavlepur
    • Vadodara-390019
    • Pavalepur
    • Vadodara
    • 390019
  • Pincode390019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/RAA01610/EX1/041022
  • ReraGenie IDRG-GJ-88753

Builder

  • NameAkshar Buildcon
  • Entity typePARTNERSHIP FIRM
  • Other registrations7 more →

Key dates

this monthRegisteredFeb 2018First promiseJul 2021Revised toJul 2022

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2022
  • Registered on12 Feb 2018
  • Promised completion31 Jul 2022
  • Revised completionRevised to 31 Jul 2022 (originally 31 Jul 2021)
  • Buildings350 building records
  • Documents filed387 files

Current status

99%345 of 350 units booked
100.0%Of the estimated cost spent so far

Figures as on 25 Jun 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101
19---101
20---101
21---101
22---101
23---101
24---101
25---101
26---101
26A---101
26B---101
26C---101
27A---101
27B---101
52---101
53---101
78C---101
108---101
109---101
139A---101
140A---101
171---101
172---101
206A---101
27C---101
27---101
28---101
29---101
30---101
31---101
32---101
33---101
34---101
35---101
36---101
37---101
38---101
39---101
40---101
41---101
42---101
43---101
44---101
45---101
46---101
47---101
48---101
49---101
50---101
51---101
54---101
55---101
56---101
57---101
58---101
59---101
60---101
61---101
62---101
63---101
64---101
65---101
66---101
67---101
68---101
69---101
70---101
71---101
72---101
73---101
74---101
75---101
76---101
77---101
78---101
78A---101
78B---101
79---101
80---101
81---101
82---101
83---101
84---101
85---101
86---101
87---101
88---101
89---101
90---101
91---101
92---101
93---101
94---101
95---101
96---101
97---101
98---101
99---101
100---101
101---101
102---101
103---101
104---101
105---101
106---101
107---101
110---101
111---101
112---101
113---101
114---101
115---101
116---101
117---101
118---101
119---101
120---101
121---101
122---101
123---101
124---101
125---101
126---101
127---101
128---101
129---101
130---101
131---101
132---101
133---101
134---101
135---101
136---101
137---101
138---101
139---101
155---101
156---101
157---101
158---101
169---101
170---101
185---101
186---101
187---101
188---101
140---101
141---101
142---101
143---101
144---101
145---101
146---101
147---101
148---101
149---101
150---101
151---101
152---101
153---101
154---101
159---101
160---101
161---101
162---101
163---101
164---101
165---101
166---101
167---101
168---101
173---101
174---101
175---101
176---101
177---101
178---101
179---101
180---101
181---101
182---101
183---101
184---101
189---101
190---101
191---101
192---101
193---101
194---101
195---101
196---101
197---101
198---101
199---101
200---101
201---101
202---101
203---101
204---101
205---101
206---101
207---101
208---101
209---101
210---101
211---101
212---101
213---101
214---101
215---101
216---101
217---101
218---101
219---101
220---101
221---101
222---101
223---101
224---101
225---101
226---101
227---101
228---101
229---101
230---101
231---101
232---101
233---101
234---101
235---101
236---101
237---101
238---101
239---101
240---101
241---101
242---101
243---101
244---101
245---101
246---101
247---101
248---101
249---101
250---101
251---101
252---101
253---101
254---101
255---101
256---101
257---101
258---101
259---101
260---101
261---101
262---101
263---101
264---101
265---101
266---101
267---101
268---101
269---101
270---101
271---101
272---101
277---101
278---101
279---101
280---101
281---101
282---101
283---101
284---101
285---101
286---101
287---101
288---101
289---101
290---101
291---101
292---101
293---101
294---101
295---101
296---101
297---101
298---101
299---101
300---101
301---101
302---101
303---101
304---101
305---101
306---101
307---101
308---101
309---101
310---101
311---101
312---101
313---101
314---101
315---101
316---101
317---101
318---101
319---101
320---101
321---101
322---101
323---101
324---101
325---101
326---101
327---101
328---101
329---101
330---101
331---101
332---101
333---101
334---101
335---101
336---101
337---101
338---101
339---101
340---101
341---101
342---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 25 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 350 buildings; the table lists the first 20.

3098 of 3098 construction stages are filed complete across 350 buildings.

1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
7100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
8100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
10100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
11100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
12100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
13100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
14100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
15100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
16100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
17100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
18100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
19100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
20100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 25 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area32,780 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.54 cr
Cost incurredRs 25.54 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
1NARs 7.30 lakhRs 7.30 lakh
2NARs 7.30 lakhRs 7.30 lakh
3NARs 7.30 lakhRs 7.30 lakh
4NARs 7.30 lakhRs 7.30 lakh
5NARs 7.30 lakhRs 7.30 lakh
6NARs 7.30 lakhRs 7.30 lakh
7NARs 7.30 lakhRs 7.30 lakh
8NARs 7.30 lakhRs 7.30 lakh
9NARs 7.30 lakhRs 7.30 lakh
10NARs 7.30 lakhRs 7.30 lakh
11NARs 7.30 lakhRs 7.30 lakh
12NARs 7.30 lakhRs 7.30 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRuchir Sheth
EngineerAashutosh Desai

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/VADODARA/VADODARA/Others/RAA01610/EX1/041022Applied Jun 2022; approved Oct 2022

Documents filed387

As listed on the registration, under the names the promoter filed them with; the newest 80 of 387 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/RAA01610/EX1/041022 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)25 Jun 2022
Site photograph, 125 Jun 2022
Site photograph, 225 Jun 2022
Site photograph, 325 Jun 2022
Site photograph, 425 Jun 2022
Site photograph, 525 Jun 2022
Site photograph, 625 Jun 2022
Site photograph, 725 Jun 2022
Site photograph, 825 Jun 2022
Site photograph, 925 Jun 2022
Site photograph, 1025 Jun 2022
Site photograph, 1125 Jun 2022
Site photograph, 1225 Jun 2022
Site photograph, 1325 Jun 2022
Site photograph, 1425 Jun 2022
Site photograph, 1525 Jun 2022
Site photograph, 1625 Jun 2022
Site photograph, 1725 Jun 2022
Site photograph, 1825 Jun 2022
Site photograph, 1925 Jun 2022
Site photograph, 2025 Jun 2022
Site photograph, 2125 Jun 2022
Site photograph, 2225 Jun 2022
Site photograph, 2325 Jun 2022
Site photograph, 2425 Jun 2022
Site photograph, 2525 Jun 2022
Site photograph, 2625 Jun 2022
Site photograph, 26A25 Jun 2022
Site photograph, 26B25 Jun 2022
Site photograph, 26C25 Jun 2022
Site photograph, 27A25 Jun 2022
Site photograph, 27B25 Jun 2022
Site photograph, 5225 Jun 2022
Site photograph, 5325 Jun 2022
Site photograph, 78C25 Jun 2022
Site photograph, 10825 Jun 2022
Site photograph, 10925 Jun 2022
Site photograph, 139A25 Jun 2022
Site photograph, 140A25 Jun 2022
Site photograph, 17125 Jun 2022
Site photograph, 17225 Jun 2022
Site photograph, 206A25 Jun 2022
Site photograph, 27C25 Jun 2022
Site photograph, 2725 Jun 2022
Site photograph, 2825 Jun 2022
Site photograph, 2925 Jun 2022
Site photograph, 3025 Jun 2022
Site photograph, 3125 Jun 2022
Site photograph, 3225 Jun 2022
Site photograph, 3325 Jun 2022
Site photograph, 3425 Jun 2022
Site photograph, 3525 Jun 2022
Site photograph, 3625 Jun 2022
Site photograph, 3725 Jun 2022
Site photograph, 3825 Jun 2022
Site photograph, 3925 Jun 2022
Site photograph, 4025 Jun 2022
Site photograph, 4125 Jun 2022
Site photograph, 4225 Jun 2022
Site photograph, 4325 Jun 2022
Site photograph, 4425 Jun 2022
Site photograph, 4525 Jun 2022
Site photograph, 4625 Jun 2022
Site photograph, 4725 Jun 2022
Site photograph, 4825 Jun 2022
Site photograph, 4925 Jun 2022
Site photograph, 5025 Jun 2022
Site photograph, 5125 Jun 2022
Site photograph, 5425 Jun 2022
Site photograph, 5525 Jun 2022
Site photograph, 5625 Jun 2022
Site photograph, 5725 Jun 2022
Site photograph, 5825 Jun 2022
Site photograph, 5925 Jun 2022
Site photograph, 6025 Jun 2022
Site photograph, 6125 Jun 2022
Site photograph, 6225 Jun 2022
Site photograph, 6325 Jun 2022
Site photograph, 6425 Jun 2022
Site photograph, 6525 Jun 2022

How this compares with Vadodara

99%of this project is bookeddistrict median 70%
23%of Vadodara projects moved their completion datethis one moved by 12 months

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Akshar Yug on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Pavalepur2,900+ in Vadodara

2 kmAkshar YugOther 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: Akshar Buildcon

Akshar Buildcon has 8 registrations on GujRERA, including Akshar Yug and Golden Industrial Park. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Akshar Yug is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Akshar Yug?

The registered promoter entity is Akshar Buildcon, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Akshar Yug?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Akshar Yug?

The professionals named in the filing: Architect: Ruchir Sheth; Engineer: Aashutosh Desai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Akshar Yug?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Akshar Yug. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Akshar Yug to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.