Akshar Paradise

By Akshar Reality

RG-GJ-07729 · RERA PR/GJ/VADODARA/VADODARA/Others/MAA02287/060418 · Last updated on GujRERA portal: 7 Jun 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Aug 2018Possession promisedno revision filed
665 of 666Construction stages doneacross 74 buildings; furthest along: Excavation, 85%
Jump to the 109 documents Report an error

Akshar Paradise is a Mixed Development project by Akshar Reality in Vadodara, Gujarat, registered with GujRERA as PR/GJ/VADODARA/VADODARA/Others/MAA02287/060418 on 6 Apr 2018. Possession is promised by 1 Aug 2018.

At a glance

Project

  • NameAkshar Paradise
  • TypeMixed Development
  • Location
    • Akshar Paradise
    • 30mtr
    • ring road
    • nr
    • solitude
    • Narayan Kathiyawadi
    • Padra
    • Vadodara 390012
    • Kalali
    • Vadodara
    • 390012
  • Pincode390012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VADODARA/VADODARA/Others/MAA02287/060418
  • ReraGenie IDRG-GJ-07729

Builder

  • NameAkshar Reality
  • Entity typePARTNERSHIP FIRM
  • Other registrations5 more →

Key dates

this monthRegisteredApr 2018PromisedAug 2018

Key facts

Registration and timeline

  • StatusValid until 1 Aug 2018
  • Registered on6 Apr 2018
  • Promised completion1 Aug 2018
  • Revised completionNone
  • Buildings74 building records
  • Documents filed109 files

Current status

100.0%Of the estimated cost spent so far

Figures as on 7 Jun 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A+B-----40
C+D-----40
E+F-----40
G-----20
H-----20
I-----20
J-----20
K+L-----40
M+N-----40
O-----20
P+Q+R-----90
DUPLEX 1-----1
DUPLEX 2-----1
DUPLEX 3-----1
DUPLEX 4-----1
DUPLEX 5-----1
DUPLEX 6-----1
DUPLEX 7-----1
DUPLEX 8-----1
DUPLEX 9-----1
DUPLEX 10-----1
DUPLEX 11-----1
DUPLEX 12-----1
DUPLEX 13-----1
DUPLEX 14-----1
DUPLEX 15-----1
DUPLEX 16-----1
DUPLEX 17-----1
DUPLEX 18-----1
DUPLEX 19-----1
DUPLEX 20-----1
DUPLEX 21-----1
DUPLEX 22-----1
DUPLEX 23-----1
DUPLEX 24-----1
DUPLEX 25-----1
DUPLEX 26-----1
DUPLEX 27-----1
DUPLEX 28-----1
DUPLEX 29-----1
DUPLEX 30-----1
DUPLEX 31-----1
DUPLEX 32-----1
DUPLEX 33-----1
DUPLEX 34-----1
DUPLEX 35-----1
DUPLEX 36-----1
DUPLEX 37-----1
DUPLEX 38-----1
DUPLEX 39-----1
DUPLEX 40-----1
DUPLEX 41-----1
DUPLEX 42-----1
DUPLEX 43-----1
DUPLEX 44-----1
DUPLEX 45-----1
DUPLEX 46-----1
DUPLEX 47-----1
DUPLEX 48-----1
DUPLEX 49-----1
DUPLEX 50-----1
DUPLEX 51-----1
DUPLEX 52-----1
DUPLEX 53-----1
DUPLEX 54-----1
DUPLEX 55-----1
DUPLEX 56-----1
DUPLEX 57-----1
DUPLEX 58-----1
DUPLEX 59-----1
DUPLEX 60-----1
DUPLEX 61-----1
DUPLEX 62-----1
DUPLEX 63-----1

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 7 Jun 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 74 buildings; the table lists the first 20.

665 of 666 construction stages are filed complete across 74 buildings. The stage furthest along is Excavation, at 85%.

A+B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C+D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E+F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
I100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
J100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
K+L100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
M+N100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
O100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
P+Q+R100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 7100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 8100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
DUPLEX 9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Jun 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,220 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 31.42 cr
Cost incurredRs 31.42 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
A+BNARs 42.46 lakhRs 42.46 lakh
C+DNARs 42.46 lakhRs 42.46 lakh
E+FNARs 42.46 lakhRs 42.46 lakh
GNARs 42.46 lakhRs 42.46 lakh
HNARs 42.46 lakhRs 42.46 lakh
INARs 42.46 lakhRs 42.46 lakh
JNARs 42.46 lakhRs 42.46 lakh
K+LNARs 42.46 lakhRs 42.46 lakh
M+NNARs 42.46 lakhRs 42.46 lakh
ONARs 42.46 lakhRs 42.46 lakh
P+Q+RNARs 42.46 lakhRs 42.46 lakh
DUPLEX 1NARs 42.46 lakhRs 42.46 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParth R Ganatra
ArchitectRuchir Sheth
EngineerAshutosh Desai

Documents filed109

As listed on the registration, under the names the promoter filed them with; the newest 80 of 109 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/VADODARA/Others/MAA02287/060418 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Jun 2019
Engineer's certificate (Form 2)7 Jun 2019
Site photograph, A+B7 Jun 2019
Site photograph, C+D7 Jun 2019
Site photograph, E+F7 Jun 2019
Site photograph, G7 Jun 2019
Site photograph, H7 Jun 2019
Site photograph, I7 Jun 2019
Site photograph, J7 Jun 2019
Site photograph, K+L7 Jun 2019
Site photograph, M+N7 Jun 2019
Site photograph, O7 Jun 2019
Site photograph, P+Q+R7 Jun 2019
Site photograph, DUPLEX 17 Jun 2019
Site photograph, DUPLEX 27 Jun 2019
Site photograph, DUPLEX 37 Jun 2019
Site photograph, DUPLEX 47 Jun 2019
Site photograph, DUPLEX 57 Jun 2019
Site photograph, DUPLEX 67 Jun 2019
Site photograph, DUPLEX 77 Jun 2019
Site photograph, DUPLEX 87 Jun 2019
Site photograph, DUPLEX 97 Jun 2019
Site photograph, DUPLEX 107 Jun 2019
Site photograph, DUPLEX 117 Jun 2019
Site photograph, DUPLEX 127 Jun 2019
Site photograph, DUPLEX 137 Jun 2019
Site photograph, DUPLEX 147 Jun 2019
Site photograph, DUPLEX 157 Jun 2019
Site photograph, DUPLEX 167 Jun 2019
Site photograph, DUPLEX 177 Jun 2019
Site photograph, DUPLEX 187 Jun 2019
Site photograph, DUPLEX 197 Jun 2019
Site photograph, DUPLEX 207 Jun 2019
Site photograph, DUPLEX 217 Jun 2019
Site photograph, DUPLEX 227 Jun 2019
Site photograph, DUPLEX 237 Jun 2019
Site photograph, DUPLEX 247 Jun 2019
Site photograph, DUPLEX 257 Jun 2019
Site photograph, DUPLEX 267 Jun 2019
Site photograph, DUPLEX 277 Jun 2019
Site photograph, DUPLEX 287 Jun 2019
Site photograph, DUPLEX 297 Jun 2019
Site photograph, DUPLEX 307 Jun 2019
Site photograph, DUPLEX 317 Jun 2019
Site photograph, DUPLEX 327 Jun 2019
Site photograph, DUPLEX 337 Jun 2019
Site photograph, DUPLEX 347 Jun 2019
Site photograph, DUPLEX 357 Jun 2019
Site photograph, DUPLEX 367 Jun 2019
Site photograph, DUPLEX 377 Jun 2019
Site photograph, DUPLEX 387 Jun 2019
Site photograph, DUPLEX 397 Jun 2019
Site photograph, DUPLEX 407 Jun 2019
Site photograph, DUPLEX 417 Jun 2019
Site photograph, DUPLEX 427 Jun 2019
Site photograph, DUPLEX 437 Jun 2019
Site photograph, DUPLEX 447 Jun 2019
Site photograph, DUPLEX 457 Jun 2019
Site photograph, DUPLEX 467 Jun 2019
Site photograph, DUPLEX 477 Jun 2019
Site photograph, DUPLEX 487 Jun 2019
Site photograph, DUPLEX 497 Jun 2019
Site photograph, DUPLEX 507 Jun 2019
Site photograph, DUPLEX 517 Jun 2019
Site photograph, DUPLEX 527 Jun 2019
Site photograph, DUPLEX 537 Jun 2019
Site photograph, DUPLEX 547 Jun 2019
Site photograph, DUPLEX 557 Jun 2019
Site photograph, DUPLEX 567 Jun 2019
Site photograph, DUPLEX 577 Jun 2019
Site photograph, DUPLEX 587 Jun 2019
Site photograph, DUPLEX 597 Jun 2019
Site photograph, DUPLEX 607 Jun 2019
Site photograph, DUPLEX 617 Jun 2019
Site photograph, DUPLEX 627 Jun 2019
Site photograph, DUPLEX 637 Jun 2019
RERA registration certificate6 Apr 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-

How this compares with Vadodara

23%of Vadodara projects moved their completion datethis one has not

Computed across the 2,900+ Vadodara projects on ReraGenie, from their own filings.

Keep Akshar Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kalali2,900+ in Vadodara

2 kmAkshar ParadiseOther 274Dot size: filed unitsN

Filed coordinates, straight-line distance. 274 registered projects within 2 km.

Builder: Akshar Reality

Akshar Reality has 6 registrations on GujRERA, including Akshar Paradise and AKSHAR KUNJ. Read the full track record. See more projects on the Vadodara district page.

Frequently asked questions

What are my rights if Akshar Paradise is delayed beyond 1 Aug 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Akshar Paradise?

The registered promoter entity is Akshar Reality, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Akshar Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Akshar Paradise?

The professionals named in the filing: Architect: Parth R Ganatra; Architect: Ruchir Sheth; Engineer: Ashutosh Desai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Akshar Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Akshar Paradise. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Akshar Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.