Valid until 30 Nov 2026 Residential/Group Housing project

AADIL AVENUE 2

By AADIL ENTERPRISE

RG-GJ-19145 · RERA PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX2/070226/301126 · Last updated on GujRERA portal: 19 Jan 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 46 months
  • 2 extensions taken

Clear

  • Nothing verified clear yet
Nov 2026Possession promisedmoved 46 months from the original
768 of 1458Construction stages doneacross 162 buildings; furthest along: Excavation, 0%
66 of 162Units unsoldnot recorded sold or booked
Jump to the 199 documents Report an error

AADIL AVENUE 2 is a Residential/Group Housing project by AADIL ENTERPRISE in Bharuch, Gujarat, registered with GujRERA as PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX2/070226/301126 on 1 Nov 2017. Possession is promised by 30 Nov 2026. The completion date has moved by 46 months from the original filing. 96 of the 162 units on this registration are recorded sold or booked, and 768 of 1458 construction stages are filed complete.

At a glance

Project

  • NameAADIL AVENUE 2
  • TypeResidential/Group Housing
  • Location
    • OLD RS NO 103-3 & NEW RS NO 287
    • VILLAGE: KUKARWADA
    • Kukarvada
    • Bharuch
    • 392012
  • Pincode392012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX2/070226/301126
  • ReraGenie IDRG-GJ-19145

Builder

  • NameAADIL ENTERPRISE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredNov 2017First promiseJan 2023Revised toNov 2026

Key facts

Registration and timeline

  • StatusValid until 30 Nov 2026
  • Registered on1 Nov 2017
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 1 Jan 2023)
  • Buildings162 building records
  • Documents filed199 files

Current status

59%96 of 162 units booked
59.3%Of the estimated cost spent so far

Figures as on 19 Jan 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bungalow 22---101
Bungalow 55---101
Bungalow 88---101
Bungalow 120---101
Bungalow 152---101
Bungalow 23---101
Bungalow 56---101
Bungalow 89---101
Bungalow 121---101
Bungalow 153---101
Bungalow 24---101
Bungalow 57---101
Bungalow 90---101
Bungalow 122---101
Bungalow 154---101
Bungalow 25---101
Bungalow 58---101
Bungalow 91---101
Bungalow 123---101
Bungalow 155---101
Bungalow 26---101
Bungalow 59---101
Bungalow 92---101
Bungalow 124---101
Bungalow 156---101
Bungalow 1---101
Bungalow 34---101
Bungalow 67---101
Bungalow 27---101
Bungalow 99---101
Bungalow 60---101
Bungalow 131---101
Bungalow 2---101
Bungalow 93---101
Bungalow 35---101
Bungalow 68---101
Bungalow 125---101
Bungalow 100---101
Bungalow 132---101
Bungalow 3---101
Bungalow 157---101
Bungalow 36---101
Bungalow 69---101
Bungalow 28---101
Bungalow 101---101
Bungalow 61---101
Bungalow 133---101
Bungalow 94---101
Bungalow 4---101
Bungalow 126---101
Bungalow 37---101
Bungalow 158---101
Bungalow 70---101
Bungalow 29---101
Bungalow 102---101
Bungalow 62---101
Bungalow 134---101
Bungalow 95---101
Bungalow 5---101
Bungalow 38---101
Bungalow 127---101
Bungalow 71---101
Bungalow 159---101
Bungalow 30---101
Bungalow 103---101
Bungalow 63---101
Bungalow 135---101
Bungalow 96---101
Bungalow 6---101
Bungalow 128---101
Bungalow 39---101
Bungalow 160---101
Bungalow 72---101
Bungalow 31---101
Bungalow 104---101
Bungalow 64---101
Bungalow 97---101
Bungalow 136---101
Bungalow 7---101
Bungalow 129---101
Bungalow 40---101
Bungalow 161---101
Bungalow 32---101
Bungalow 73---101
Bungalow 65---101
Bungalow 98---101
Bungalow 105---101
Bungalow 137---101
Bungalow 130---101
Bungalow 162---101
Bungalow 33---101
Bungalow 8---101
Bungalow 66---101
Bungalow 41---101
Bungalow 74---101
Bungalow 106---101
Bungalow 138---101
Bungalow 9---101
Bungalow 42---101
Bungalow 75---101
Bungalow 107---101
Bungalow 139---101
Bungalow 10---101
Bungalow 43---101
Bungalow 76---101
Bungalow 108---101
Bungalow 140---101
Bungalow 11---101
Bungalow 44---101
Bungalow 77---101
Bungalow 109---101
Bungalow 141---101
Bungalow 12---101
Bungalow 45---101
Bungalow 78---101
Bungalow 110---101
Bungalow 142---101
Bungalow 13---101
Bungalow 46---101
Bungalow 79---101
Bungalow 111---101
Bungalow 143---101
Bungalow 14---101
Bungalow 47---101
Bungalow 80---101
Bungalow 112---101
Bungalow 144---101
Bungalow 15---101
Bungalow 48---101
Bungalow 81---101
Bungalow 113---101
Bungalow 145---101
Bungalow 16---101
Bungalow 49---101
Bungalow 82---101
Bungalow 114---101
Bungalow 146---101
Bungalow 17---101
Bungalow 50---101
Bungalow 83---101
Bungalow 115---101
Bungalow 147---101
Bungalow 18---101
Bungalow 51---101
Bungalow 84---101
Bungalow 116---101
Bungalow 148---101
Bungalow 19---101
Bungalow 52---101
Bungalow 85---101
Bungalow 117---101
Bungalow 149---101
Bungalow 20---101
Bungalow 53---101
Bungalow 86---101
Bungalow 118---101
Bungalow 150---101
Bungalow 21---101
Bungalow 54---101
Bungalow 87---101
Bungalow 119---101
Bungalow 151---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 19 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 162 buildings; the table lists the first 20.

768 of 1458 construction stages are filed complete across 162 buildings. The stage furthest along is Excavation, at 0%.

Bungalow 220%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 550%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 8889%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 12089%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 1520%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 230%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 560%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 8989%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 12189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 1530%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 240%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 570%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 9089%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 12289%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 1540%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 250%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 580%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Bungalow 9189%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 12389%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Bungalow 1550%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 19 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area33,184 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 14.95 cr
Cost incurredRs 8.86 cr
Spent of the estimate59.26%
BuildingWingEstimatedIncurred
Bungalow 1NARs 9.23 lakhRs 9.23 lakh
Bungalow 10NARs 9.23 lakhRs 9.23 lakh
Bungalow 100NARs 9.23 lakhRs 9.23 lakh
Bungalow 101NARs 9.23 lakhRs 9.23 lakh
Bungalow 102NARs 9.23 lakhRs 9.23 lakh
Bungalow 103NARs 9.23 lakhRs 9.23 lakh
Bungalow 104NARs 9.23 lakhRs 9.23 lakh
Bungalow 105NARs 9.23 lakhRs 9.23 lakh
Bungalow 106NARs 9.23 lakhRs 9.23 lakh
Bungalow 107NARs 9.23 lakhRs 9.23 lakh
Bungalow 108NARs 9.23 lakhRs 9.23 lakh
Bungalow 109NARs 9.23 lakhRs 9.23 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARIMAL JUHAR
EngineerSVN CONSULTING ENGINEER

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX1/080523Applied Dec 2022; approved May 2023
PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX2/070226/301126Applied Sep 2025; approved Feb 2026

Documents filed199

As listed on the registration, under the names the promoter filed them with; the newest 80 of 199 are shown. The files themselves are available at source: search the registration number PR/GJ/BHARUCH/BHARUCH/Others/RAA00567/EX2/070226/301126 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)19 Jan 2026
Engineer's certificate (Form 2)19 Jan 2026
Engineer's certificate annexure19 Jan 2026
Accountant's certificate (Form 3)19 Jan 2026
Site photograph, Bungalow 2219 Jan 2026
Site photograph, Bungalow 5519 Jan 2026
Site photograph, Bungalow 8819 Jan 2026
Site photograph, Bungalow 12019 Jan 2026
Site photograph, Bungalow 15219 Jan 2026
Site photograph, Bungalow 2319 Jan 2026
Site photograph, Bungalow 5619 Jan 2026
Site photograph, Bungalow 8919 Jan 2026
Site photograph, Bungalow 12119 Jan 2026
Site photograph, Bungalow 15319 Jan 2026
Site photograph, Bungalow 2419 Jan 2026
Site photograph, Bungalow 5719 Jan 2026
Site photograph, Bungalow 9019 Jan 2026
Site photograph, Bungalow 12219 Jan 2026
Site photograph, Bungalow 15419 Jan 2026
Site photograph, Bungalow 2519 Jan 2026
Site photograph, Bungalow 5819 Jan 2026
Site photograph, Bungalow 9119 Jan 2026
Site photograph, Bungalow 12319 Jan 2026
Site photograph, Bungalow 15519 Jan 2026
Site photograph, Bungalow 2619 Jan 2026
Site photograph, Bungalow 5919 Jan 2026
Site photograph, Bungalow 9219 Jan 2026
Site photograph, Bungalow 12419 Jan 2026
Site photograph, Bungalow 15619 Jan 2026
Site photograph, Bungalow 119 Jan 2026
Site photograph, Bungalow 3419 Jan 2026
Site photograph, Bungalow 6719 Jan 2026
Site photograph, Bungalow 2719 Jan 2026
Site photograph, Bungalow 9919 Jan 2026
Site photograph, Bungalow 6019 Jan 2026
Site photograph, Bungalow 13119 Jan 2026
Site photograph, Bungalow 219 Jan 2026
Site photograph, Bungalow 9319 Jan 2026
Site photograph, Bungalow 3519 Jan 2026
Site photograph, Bungalow 6819 Jan 2026
Site photograph, Bungalow 12519 Jan 2026
Site photograph, Bungalow 10019 Jan 2026
Site photograph, Bungalow 13219 Jan 2026
Site photograph, Bungalow 319 Jan 2026
Site photograph, Bungalow 15719 Jan 2026
Site photograph, Bungalow 3619 Jan 2026
Site photograph, Bungalow 6919 Jan 2026
Site photograph, Bungalow 2819 Jan 2026
Site photograph, Bungalow 10119 Jan 2026
Site photograph, Bungalow 6119 Jan 2026
Site photograph, Bungalow 13319 Jan 2026
Site photograph, Bungalow 9419 Jan 2026
Site photograph, Bungalow 419 Jan 2026
Site photograph, Bungalow 12619 Jan 2026
Site photograph, Bungalow 3719 Jan 2026
Site photograph, Bungalow 15819 Jan 2026
Site photograph, Bungalow 7019 Jan 2026
Site photograph, Bungalow 2919 Jan 2026
Site photograph, Bungalow 10219 Jan 2026
Site photograph, Bungalow 6219 Jan 2026
Site photograph, Bungalow 13419 Jan 2026
Site photograph, Bungalow 9519 Jan 2026
Site photograph, Bungalow 519 Jan 2026
Site photograph, Bungalow 3819 Jan 2026
Site photograph, Bungalow 12719 Jan 2026
Site photograph, Bungalow 7119 Jan 2026
Site photograph, Bungalow 15919 Jan 2026
Site photograph, Bungalow 3019 Jan 2026
Site photograph, Bungalow 10319 Jan 2026
Site photograph, Bungalow 6319 Jan 2026
Site photograph, Bungalow 13519 Jan 2026
Site photograph, Bungalow 9619 Jan 2026
Site photograph, Bungalow 619 Jan 2026
Site photograph, Bungalow 12819 Jan 2026
Site photograph, Bungalow 3919 Jan 2026
Site photograph, Bungalow 16019 Jan 2026
Site photograph, Bungalow 7219 Jan 2026
Site photograph, Bungalow 3119 Jan 2026
Site photograph, Bungalow 10419 Jan 2026
Site photograph, Bungalow 6419 Jan 2026

How this compares with Bharuch

59%of this project is bookeddistrict median 52%
20%of Bharuch projects moved their completion datethis one moved by 46 months

Computed across the 200+ Bharuch projects on ReraGenie, from their own filings.

Keep AADIL AVENUE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kukarvada200+ in Bharuch

Builder: AADIL ENTERPRISE

AADIL ENTERPRISE has 1 registration on GujRERA, including AADIL AVENUE 2. Read the full track record. See more projects on the Bharuch district page.

Frequently asked questions

What are my rights if AADIL AVENUE 2 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of AADIL AVENUE 2?

The registered promoter entity is AADIL ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in AADIL AVENUE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at AADIL AVENUE 2?

The professionals named in the filing: Architect: PARIMAL JUHAR; Engineer: SVN CONSULTING ENGINEER. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AADIL AVENUE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AADIL AVENUE 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AADIL AVENUE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.