Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
3rd Eye Three is a Commercial project by CALICA BUILDWELL PRIVATE LIMITED in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA03118/EX1/080620 on 9 Jul 2018. Possession is promised by 27 Feb 2021. The completion date has moved by 12 months from the original filing. 84 of the 102 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.
At a glance
Project
- Name3rd Eye Three
- TypeCommercial
- Location
- 3rd Eye Three
- Nr. Girish Cold Drinks
- C.G.Road
- Navrangpura
- hekhpur - Khanpur
- Ahmedabad City
- Ahmedabad
- 380006
- Pincode380006
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA03118/EX1/080620
- ReraGenie IDRG-GJ-04509
Builder
- NameCALICA BUILDWELL PRIVATE LIMITED
- Entity typeCOMPANY
Key dates
Key facts
Registration and timeline
- StatusValid until 27 Feb 2021
- Registered on9 Jul 2018
- Promised completion27 Feb 2021
- Revised completionRevised to 27 Feb 2021 (originally 28 Feb 2020)
- Buildings1 building record
- Documents filed38 files
Current status
Figures as on 7 Aug 2021, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 3rd Eye Three | - | - | - | 0 | 102 | 102 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building1
As on 7 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 9 construction stages are filed complete.
3rd Eye Three: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 7 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | Yes | 100% |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | Yes | 100% |
| Letter box | Yes | 100% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 3rd Eye Three | NA | Rs 10.12 cr | Rs 11.25 cr |
Certifying professionals and partners1
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURESH SUTHAR |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed38
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/CAA03118/EX1/080620 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Accountant's certificate (Form 3) | 7 Aug 2021 |
| Architect's certificate (Form 1) | 6 Aug 2021 |
| Engineer's certificate (Form 2) | 6 Aug 2021 |
| Engineer's certificate annexure | 6 Aug 2021 |
| Site photograph, 3rd Eye Three | 6 Aug 2021 |
| RERA registration certificate | 9 Jul 2018 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmedabad
Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.
Keep 3rd Eye Three on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near hekhpur - Khanpur5,400+ in Ahmedabad
Filed coordinates, straight-line distance. 273 registered projects within 2 km.
TAKSHASHILA ELEGNA
TAKSHASHILA HEIGHTS INDIA PRIVATE LIMITED
SIVANTA ONE
VINAYAK INFRASTRUCTURE
Takshashila Air
TAKSHASHILA CORPORATION LLP
LE JARDIN
GRANT INFRASTRUCTURE PRIVATE LIMITED
ANAM 1
AAA BUILDCOM LLP
Aaryan Workspace - 2
Aaryan Workspace LLP
See every Ahmedabad project, with the district possession charts
Builder: CALICA BUILDWELL PRIVATE LIMITED
CALICA BUILDWELL PRIVATE LIMITED has 1 registration on GujRERA, including 3rd Eye Three. Read the full track record. See more projects on the Ahmedabad district page.
Frequently asked questions
What are my rights if 3rd Eye Three is delayed beyond 27 Feb 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of 3rd Eye Three?
The registered promoter entity is CALICA BUILDWELL PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in 3rd Eye Three?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at 3rd Eye Three?
The professionals named in the filing: Architect: SURESH SUTHAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 3rd Eye Three?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback