Home / Browse projects / Bhavnagar, Gujarat / 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.
224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.
RG-GJ-83911 · RERA PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04969/EX1/180822 · Last updated on GujRERA portal: 30 Jun 2023
Source: official GujRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
Saved.
224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR. is a Residential/Group Housing project by GUJARAT HOUSING BOARD in Bhavnagar, Gujarat, registered with GujRERA as PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04969/EX1/180822 on 2 Mar 2019. Possession is promised by 30 Jun 2023. The completion date has moved by 12 months from the original filing. 195 of the 224 units on this registration are recorded sold or booked, and 56 of 56 construction stages are filed complete.
At a glance
Project
- Name224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.
- TypeResidential/Group Housing
- Location
- NEAR FILTRATION PLANT
- TARSAMIYA
- Tarasmiya
- Bhavnagar
- 364002
- Pincode364002
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04969/EX1/180822
- ReraGenie IDRG-GJ-83911
Builder
- NameGUJARAT HOUSING BOARD
- Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
- Other registrations36 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Jun 2023
- Registered on2 Mar 2019
- Promised completion30 Jun 2023
- Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2022)
- Buildings7 building records
- Documents filed58 files
Current status
Figures as on 30 Jun 2023, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F1 | - | - | - | 32 | 0 | 32 |
| F2 | - | - | - | 32 | 0 | 32 |
| F3 | - | - | - | 32 | 0 | 32 |
| F4 | - | - | - | 32 | 0 | 32 |
| F5 | - | - | - | 32 | 0 | 32 |
| F6 | - | - | - | 32 | 0 | 32 |
| F7 | - | - | - | 32 | 0 | 32 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building7
As on 30 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
56 of 56 construction stages are filed complete across 7 buildings.
F1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F3100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F6100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
F7100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 30 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | Yes | 100% |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Fire fighting | No | Not applicable |
| Drinking water facilities | No | Not applicable |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | No | Not applicable |
| Letter box | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F1 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F2 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F3 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F4 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F5 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F6 | NA | Rs 1.25 cr | Rs 1.25 cr |
| F7 | NA | Rs 1.25 cr | Rs 1.25 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHAVAL RANGANI |
| Engineer | SAVAN B KAKADIA |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed58
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04969/EX1/180822 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect's certificate (Form 1) | 30 Jun 2023 |
| Engineer's certificate (Form 2) | 30 Jun 2023 |
| Engineer's certificate annexure | 30 Jun 2023 |
| Accountant's certificate (Form 3) | 30 Jun 2023 |
| Site photograph, F1 | 30 Jun 2023 |
| Site photograph, F1 | 30 Jun 2023 |
| Site photograph, F1 | 30 Jun 2023 |
| Site photograph, F2 | 30 Jun 2023 |
| Site photograph, F2 | 30 Jun 2023 |
| Site photograph, F2 | 30 Jun 2023 |
| Site photograph, F3 | 30 Jun 2023 |
| Site photograph, F3 | 30 Jun 2023 |
| Site photograph, F3 | 30 Jun 2023 |
| Site photograph, F4 | 30 Jun 2023 |
| Site photograph, F4 | 30 Jun 2023 |
| Site photograph, F5 | 30 Jun 2023 |
| Site photograph, F5 | 30 Jun 2023 |
| Site photograph, F5 | 30 Jun 2023 |
| Site photograph, F6 | 30 Jun 2023 |
| Site photograph, F6 | 30 Jun 2023 |
| Site photograph, F7 | 30 Jun 2023 |
| Site photograph, F7 | 30 Jun 2023 |
| RERA registration certificate | 2 Mar 2019 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Commencement certificate | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Agreement | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Project related document | - |
| Declaration in Form B | - |
| Title clearance certificate | - |
| Title report | - |
| Property card | - |
| Project photograph | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bhavnagar
Computed across the 730+ Bhavnagar projects on ReraGenie, from their own filings.
Keep 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tarasmiya730+ in Bhavnagar
Filed coordinates, straight-line distance. 182 registered projects within 2 km.
896 EWS 1 AT R14 R15 R16 AT TARSAMIYA BHAVNAGA
GUJARAT HOUSING BOARD
2489 EWS 1 PMAY FP 109
MUNICIPAL CORPORATION OF BHAVNAGAR
572 LIG2+56 SHOPS AT TARSAMIYA BHAVNAGAR
GUJARAT HOUSING BOARD
576 EWS 2 AT R 10A TARSAMIYA BHAVNAGAR
GUJARAT HOUSING BOARD
AMARDEEP HEIGHTS
ORCHID INFRACON
the imperial heights
SHREE RAM INFRASTRUCTURE
See every Bhavnagar project, with the district possession charts
Builder: GUJARAT HOUSING BOARD
GUJARAT HOUSING BOARD has 37 registrations on GujRERA, including 12 SHOPS + 364 MIG I at Plot C & D Gota and 48 SHOPS 896 LIG II 672 MIG I 336 MIG II. Read the full track record. See more projects on the Bhavnagar district page.
Frequently asked questions
What are my rights if 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR. is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.?
The registered promoter entity is GUJARAT HOUSING BOARD, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.?
The professionals named in the filing: Architect: DHAVAL RANGANI; Engineer: SAVAN B KAKADIA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 224 EWS 1 AT R21 TARSAMIYA BHAVNAGAR.?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.