Valid until 15 Dec 2023 Mixed Development project

2489 EWS 1 PMAY FP 109

By MUNICIPAL CORPORATION OF BHAVNAGAR

RG-GJ-24111 · RERA PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/MAA06407/EX1/300123 · Last updated on GujRERA portal: 2 Sep 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Dec 2023Possession promisedmoved 12 months from the original
44 of 104Construction stages doneacross 13 buildings; furthest along: Slabs of Super Structure, 98%
27 of 755Units unsoldnot recorded sold or booked
Jump to the 53 documents Report an error

2489 EWS 1 PMAY FP 109 is a Mixed Development project by MUNICIPAL CORPORATION OF BHAVNAGAR in Bhavnagar, Gujarat, registered with GujRERA as PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/MAA06407/EX1/300123 on 29 Nov 2019. Possession is promised by 15 Dec 2023. The completion date has moved by 12 months from the original filing. 728 of the 755 units on this registration are recorded sold or booked, and 44 of 104 construction stages are filed complete.

At a glance

Project

  • Name2489 EWS 1 PMAY FP 109
  • TypeMixed Development
  • Location
    • TP 03 RUVA FP 109
    • BHAVNAGAR
    • Ruva
    • Bhavnagar
    • 364002
  • Pincode364002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/MAA06407/EX1/300123
  • ReraGenie IDRG-GJ-24111

Builder

  • NameMUNICIPAL CORPORATION OF BHAVNAGAR
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations28 more →

Key dates

this monthRegisteredNov 2019First promiseDec 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusValid until 15 Dec 2023
  • Registered on29 Nov 2019
  • Promised completion15 Dec 2023
  • Revised completionRevised to 15 Dec 2023 (originally 15 Dec 2022)
  • Buildings13 building records
  • Documents filed53 files

Current status

96%728 of 755 units booked
707.5%Of the estimated cost spent so far

Figures as on 2 Sep 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---56965
B---56965
C---56965
D---56056
E---56056
F---56056
G---56056
H---56056
I---56056
J---56056
K---56056
L---56056
M---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building13

As on 2 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 104 construction stages are filed complete across 13 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

A72%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats87%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
B68%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats87%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing60%
C68%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats87%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing60%
D53%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure61%
Internal walls, internal plaster, floorings, doors and windows within flats35%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks61%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
E53%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure61%
Internal walls, internal plaster, floorings, doors and windows within flats35%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks61%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
F76%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure98%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
G76%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure98%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
H69%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
I69%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
J77%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
K77%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
L77%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%
M77%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing65%

Progress on shared amenities19

As on 2 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,282 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 34.38 cr
Cost incurredRs 243.22 cr
Spent of the estimate707.47%
BuildingWingEstimatedIncurred
ANARs 2.64 crRs 18.71 cr
BNARs 2.64 crRs 18.71 cr
CNARs 2.64 crRs 18.71 cr
DNARs 2.64 crRs 18.71 cr
ENARs 2.64 crRs 18.71 cr
FNARs 2.64 crRs 18.71 cr
GNARs 2.64 crRs 18.71 cr
HNARs 2.64 crRs 18.71 cr
INARs 2.64 crRs 18.71 cr
JNARs 2.64 crRs 18.71 cr
KNARs 2.64 crRs 18.71 cr
LNARs 2.64 crRs 18.71 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/MAA06407/EX1/300123Applied Nov 2022; approved Jan 2023

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/MAA06407/EX1/300123 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)2 Sep 2023
Architect's certificate (Form 1)28 Aug 2023
Engineer's certificate (Form 2)28 Aug 2023
Engineer's certificate annexure28 Aug 2023
Site photograph, A28 Aug 2023
Site photograph, B28 Aug 2023
Site photograph, C28 Aug 2023
Site photograph, D28 Aug 2023
Site photograph, E28 Aug 2023
Site photograph, F28 Aug 2023
Site photograph, G28 Aug 2023
Site photograph, H28 Aug 2023
Site photograph, I28 Aug 2023
Site photograph, J28 Aug 2023
Site photograph, K28 Aug 2023
Site photograph, L28 Aug 2023
Site photograph, M28 Aug 2023
RERA registration certificate29 Nov 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bhavnagar

96%of this project is bookeddistrict median 50%
16%of Bhavnagar projects moved their completion datethis one moved by 12 months

Computed across the 730+ Bhavnagar projects on ReraGenie, from their own filings.

Keep 2489 EWS 1 PMAY FP 109 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ruva730+ in Bhavnagar

2 km2489 EWS 1 PMAY FP 109Other 203Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: MUNICIPAL CORPORATION OF BHAVNAGAR

MUNICIPAL CORPORATION OF BHAVNAGAR has 29 registrations on GujRERA, including 2548 EWS 1 PMAY FP 28 and 2548 EWS 1 PMAY FP 29. Read the full track record. See more projects on the Bhavnagar district page.

Frequently asked questions

What are my rights if 2489 EWS 1 PMAY FP 109 is delayed beyond 15 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of 2489 EWS 1 PMAY FP 109?

The registered promoter entity is MUNICIPAL CORPORATION OF BHAVNAGAR, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in 2489 EWS 1 PMAY FP 109?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in 2489 EWS 1 PMAY FP 109?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 2489 EWS 1 PMAY FP 109. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 2489 EWS 1 PMAY FP 109 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.