ReraGenieLog inGet a buyer report

Home / Browse projects / Bhavnagar, Gujarat / 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR

Valid until 30 Jun 2023 Residential/Group Housing project

192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR

By GUJARAT HOUSING BOARD

RG-GJ-82111 · RERA PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04982/EX1/180822 · Last updated on GujRERA portal: 30 Jun 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2023Possession promisedmoved 12 months from the original
48 of 48Construction stages doneacross 6 buildings; every applicable stage filed complete
155 of 192Units unsoldnot recorded sold or booked
Jump to the 46 documents Report an error

192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR is a Residential/Group Housing project by GUJARAT HOUSING BOARD in Bhavnagar, Gujarat, registered with GujRERA as PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04982/EX1/180822 on 7 Mar 2019. Possession is promised by 30 Jun 2023. The completion date has moved by 12 months from the original filing. 37 of the 192 units on this registration are recorded sold or booked, and 48 of 48 construction stages are filed complete.

At a glance

Project

  • Name192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR
  • TypeResidential/Group Housing
  • Location
    • BEHIND GMDC COLONY
    • TARSAMIYA
    • Tarsamiya
    • Bhavnagar
    • 364002
  • Pincode364002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04982/EX1/180822
  • ReraGenie IDRG-GJ-82111

Builder

  • NameGUJARAT HOUSING BOARD
  • Entity typeCOMPETENT AUTHORITY/ GOVERNMENT
  • Other registrations36 more →

Key dates

this monthRegisteredMar 2019First promiseJun 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2023
  • Registered on7 Mar 2019
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2022)
  • Buildings6 building records
  • Documents filed46 files

Current status

19%37 of 192 units booked
100.0%Of the estimated cost spent so far

Figures as on 30 Jun 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1---32032
B2---32032
B3---32032
B4---32032
B5---32032
B6---32032

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 30 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 48 construction stages are filed complete across 6 buildings.

B1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 30 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,550 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 9.24 cr
Cost incurredRs 9.24 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
B1NARs 1.54 crRs 1.54 cr
B2NARs 1.54 crRs 1.54 cr
B3NARs 1.54 crRs 1.54 cr
B4NARs 1.54 crRs 1.54 cr
B5NARs 1.54 crRs 1.54 cr
B6NARs 1.54 crRs 1.54 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04982/EX1/180822Applied Jul 2022; approved Aug 2022

Documents filed46

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BHAVNAGAR/BHAVNAGAR/Others/RAA04982/EX1/180822 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)30 Jun 2023
Architect's certificate (Form 1)28 Jun 2023
Engineer's certificate (Form 2)28 Jun 2023
Engineer's certificate annexure28 Jun 2023
Site photograph, B128 Jun 2023
Site photograph, B228 Jun 2023
Site photograph, B328 Jun 2023
Site photograph, B428 Jun 2023
Site photograph, B528 Jun 2023
Site photograph, B628 Jun 2023
RERA registration certificate7 Mar 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Bhavnagar

19%of this project is bookeddistrict median 50%
16%of Bhavnagar projects moved their completion datethis one moved by 12 months

Computed across the 730+ Bhavnagar projects on ReraGenie, from their own filings.

Keep 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Tarsamiya730+ in Bhavnagar

2 km192 EWS 2 AT 10B TARSAMIOther 207Dot size: filed unitsN

Filed coordinates, straight-line distance. 207 registered projects within 2 km.

Builder: GUJARAT HOUSING BOARD

GUJARAT HOUSING BOARD has 37 registrations on GujRERA, including 12 SHOPS + 364 MIG I at Plot C & D Gota and 48 SHOPS 896 LIG II 672 MIG I 336 MIG II. Read the full track record. See more projects on the Bhavnagar district page.

Frequently asked questions

What are my rights if 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR?

The registered promoter entity is GUJARAT HOUSING BOARD, a competent authority/ government as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 192 EWS 2 AT 10B TARSAMIYA BHAVNAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.