Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Aug 2027Possession promisedno revision filed
2 of 9Construction stages donefurthest along: Internal walls, 86%
48 of 51Units unsoldnot recorded sold or booked
Jump to the 34 documents Report an error

VIRAL ELEGANCE is a Mixed Development project by SHRI SIDDHI VINAYAK CONSTRUCTION in Rajkot, Gujarat, registered with GujRERA as PR/GJ/RAJKOT/RAJKOT/Rajkot Municipal Corporation/MAA14509/131224/300427 on 13 Dec 2024. Possession is promised by 30 Aug 2027. 3 of the 51 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.

At a glance

Project

  • NameVIRAL ELEGANCE
  • TypeMixed Development
  • Location
    • B/H INFINITY
    • AYODHYA CHOWK
    • 150 FEET RING ROAD
    • MADHAPAR
    • Rajkot
    • 360006
  • Pincode360006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/RAJKOT/RAJKOT/Rajkot Municipal Corporation/MAA14509/131224/300427
  • ReraGenie IDRG-GJ-29672

Builder

  • NameSHRI SIDDHI VINAYAK CONSTRUCTION
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredDec 2024PromisedAug 2027

Key facts

Registration and timeline

  • StatusValid until 30 Aug 2027
  • Registered on13 Dec 2024
  • Promised completion30 Aug 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed34 files

Current status

6%3 of 51 units booked
4.5%Of the estimated cost spent so far

Figures as on 13 Dec 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---301151

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Internal walls, at 86%.

Block A: 54% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth80%
Stilt Floor16%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats86%
Sanitary fittings within the flats20%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingNoNot applicable
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingYes0%
Drinking water facilitiesNoNot applicable
Emergency evacuationYes0%
Use of renewable energyYes0%
SecurityYes0%
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionYes0%
Water tankYes0%
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area743 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 6.95 cr
Cost incurredRs 31.12 lakh
Spent of the estimate4.48%
BuildingWingEstimatedIncurred
Block ANARs 6.95 crRs 31.12 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhwani Divyesh Badani
EngineerASHWINKUMAR MANILAL LODHIYA

Documents filed34

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/RAJKOT/RAJKOT/Rajkot Municipal Corporation/MAA14509/131224/300427 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate13 Dec 2024
Engineer's certificate (Form 2)15 Oct 2024
Engineer's certificate annexure15 Oct 2024
Proforma agreement for sale-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Rajkot

6%of this project is bookeddistrict median 56%
13%of Rajkot projects moved their completion datethis one has not

Computed across the 1,800+ Rajkot projects on ReraGenie, from their own filings.

Keep VIRAL ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near MADHAPAR1,800+ in Rajkot

2 kmVIRAL ELEGANCEOther 162Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: SHRI SIDDHI VINAYAK CONSTRUCTION

SHRI SIDDHI VINAYAK CONSTRUCTION has 1 registration on GujRERA, including VIRAL ELEGANCE. Read the full track record. See more projects on the Rajkot district page.

Frequently asked questions

What are my rights if VIRAL ELEGANCE is delayed beyond 30 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of VIRAL ELEGANCE?

The registered promoter entity is SHRI SIDDHI VINAYAK CONSTRUCTION, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in VIRAL ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VIRAL ELEGANCE?

The professionals named in the filing: Architect: Dhwani Divyesh Badani; Engineer: ASHWINKUMAR MANILAL LODHIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIRAL ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIRAL ELEGANCE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIRAL ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.