ReraGenieLog inGet a buyer report

Home / Browse projects / Chittoor, Andhra Pradesh / VICTORY BY PURTHI

Valid until 31 Mar 2020 No litigation declared Residential project

VICTORY BY PURTHI

By PURTHI SPACES LLP

RG-AP-64725 · RERA P10170280527

Source: official APRERA filing

Red flags

  • No litigation is declared; this page reads no complaints or extensions from this register, so it raises no other flags

Clear

  • No litigation declared
Jump to the 28 documents Report an error

VICTORY BY PURTHI is a Residential project by PURTHI SPACES LLP in Chittoor, Andhra Pradesh, registered with APRERA as P10170280527 on 13 Oct 2019. Possession is promised by 31 Mar 2020.

At a glance

Project

  • NameVICTORY BY PURTHI
  • TypeResidential
  • Location
    • 179/3&4
    • PALMYRA ROAD
    • CHILAMATHUR VILLAGE
    • CHILAMATHUR
    • Varadaiahpalem
    • Chittoor
    • 517541
  • Pincode517541
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P10170280527
  • ReraGenie IDRG-AP-64725

Builder

  • NamePURTHI SPACES LLP
  • Entity typePartnership/LLP Firm
  • GSTIN37AAVFP8380M1Z3
  • PartnersKATTUPUTHUR CHIDAMBARAM, MATHANGI CHANDRASEKAR
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2019PromisedMar 2020

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2020
  • Registered on13 Oct 2019
  • Promised completion31 Mar 2020
  • Buildings1 building record
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---75075

The full filing

Everything below is from the project's own APRERA filing, free to read.

Progress on shared amenities9

Roads, water, drainage and the other works outside the buildings, as the promoter last filed them on APRERA, and reported rather than inspected.

External development workProgress
Road System10%
Water Supply10%
Sewage and Drainage System10%
Electricity Supply Transformer And Sub Station99%
Solid Waste Management And Disposal5%
Fire Fighting Facility0%
Drinking Water Facility0%
Emergency Evacuation Service0%
Use of Renewable Energy0%

Land and ownership

APRERA takes the encumbrance details as an uploaded document, listed under Documents filed below; this page does not read inside it. A search at the sub-registrar is what confirms clear land.

Land area1,821 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Estimated costRs 5.01 cr

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRN ASSOCIATES
EngineerN KAMARAJAN
EngineerT ELUMALAI
Chartered AccountantP R SUGANTHI

Documents filed28

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number P10170280527 on the APRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1.Income Tax Return Acknowledgement of Preceding Year 1-
2. Income Tax Return Acknowledgement of Preceding Year 2-
3.Income Tax Return Acknowledgement of Preceding Year 3-
4.Balance Sheet-
8. Copies of the registered ownership documents / Copies of the pattadar pass books issued by the Revenue depa-
10. Detailed site plan showing the measurements as on ground including diagonals, Latitude and Longitude at en-
13. Land Title search Report from an Advocate(include Advocate Enrolment Number) having experience of at least-
14.Latest (by 30 days) Encumbrance certificate (for entire period of document) issued by the Registration and -
15. Details of the cases pending before the Authorities or in Courts of Law and their current status along wit-
16. Copy of the plan and proceedings issued by the competent Authority for approval of plans-
17. Approved plan / list of amenities proposed in the site-
18. NOC's issued by Authority-
19. Detailed technical specifications of the construction if the buildings and facilities proposed in the proj-
20. Full address of the proposed development project along with the land mark nearby and a location plan/ Topo-
21. Licenses/Enrolment form of Civil Contractors, or turnkey contractor, or EPC Contractors.-
25.Licenses/Enrolment form of Chartered Accountant or firm or company-
26.Detailed estimate of the expenditure for construction of the building-
27. Statement of source of funds for construction of project-
29.Proforma of the Allotment Letter proposed to be signed with the Allottee-
30.Proforma of the Agreement for Sale proposed to be signed with the Allottee-
31.Proforma of the Conveyance Deed proposed to be signed with the Allottee-
32.Structural Stability Certificate duly issued by Certified Structural Consultant/Engineer along with the det-
34. FORM - B, Declaration, supported by an affidavit, which shall be signed by the promoter or any person auth-
APRERA CERTIFICATE-
Firm registration Tirupati 15247117320180510-
GST AP Registration-
21No Litigation_08-08-2019-02-26-
245 CentsCombined EC 30 Years-

Keep VICTORY BY PURTHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near CHILAMATHUR190+ in Chittoor

Builder: PURTHI SPACES LLP

PURTHI SPACES LLP has 2 registrations on APRERA, including GOLDEN FOUNTAIN VILLAS and VICTORY BY PURTHI. Read the full track record. See more projects on the Chittoor district page.

Frequently asked questions

What are my rights if VICTORY BY PURTHI is delayed beyond 31 Mar 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with APRERA.

How do I verify and contact the developer of VICTORY BY PURTHI?

The registered promoter entity is PURTHI SPACES LLP, a partnership/llp firm as per the filing. Its GSTIN 37AAVFP8380M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's APRERA listing and in its filed documents.

Is my payment protected in VICTORY BY PURTHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VICTORY BY PURTHI?

The professionals named in the filing: Architect: MRN ASSOCIATES; Engineer: N KAMARAJAN; Engineer: T ELUMALAI; Chartered Accountant: P R SUGANTHI. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VICTORY BY PURTHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on APRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VICTORY BY PURTHI. Everything on this page comes from what the promoter filed on APRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VICTORY BY PURTHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.