ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / Tilak Heritage

Valid until 30 Apr 2030 Residential/Group Housing project

Tilak Heritage

By SAHJANAND GRUP

RG-GJ-69681 · RERA PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RAA13227/010424/311229 · Last updated on GujRERA portal: 27 Jul 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2030Possession promisedno revision filed
13 of 36Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
68 of 224Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

Tilak Heritage is a Residential/Group Housing project by SAHJANAND GRUP in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RAA13227/010424/311229 on 1 Apr 2024. Possession is promised by 30 Apr 2030. 156 of the 224 units on this registration are recorded sold or booked, and 13 of 36 construction stages are filed complete.

At a glance

Project

  • NameTilak Heritage
  • TypeResidential/Group Housing
  • Location
    • "Tilak Heritage"
    • Block No. 51
    • O.P. No. 231
    • F.P. No. 231/B
    • T.P.S.- 84(KOSAD-BHARTHANA KOSAD-MOTA VARACHHA-ABRAMA)
    • ABRAMA
    • Mota Varachha
    • Choryasi
    • ...
  • Pincode394101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RAA13227/010424/311229
  • ReraGenie IDRG-GJ-69681

Builder

  • NameSAHJANAND GRUP
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2024PromisedApr 2030

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2030
  • Registered on1 Apr 2024
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

70%156 of 224 units booked
87.4%Of the estimated cost spent so far

Figures as on 27 Jul 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B---56056
A---56056
D---56056
C---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

B61%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats85%
Sanitary fittings within the flats45%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing48%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A61%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats75%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing45%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing25%
D65%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing48%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing15%
C63%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats45%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing35%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing15%

Progress on shared amenities19

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,578 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 36.00 cr
Cost incurredRs 31.47 cr
Spent of the estimate87.41%
BuildingWingEstimatedIncurred
CNARs 10.26 crRs 8.97 cr
DNARs 10.26 crRs 8.97 cr
ANARs 7.74 crRs 6.77 cr
BNARs 7.74 crRs 6.77 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddharth Vitthalbhai Patel
EngineerDARSHAN POPATBHAI SUTARIYA

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RAA13227/010424/311229 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)27 Jul 2026
Engineer's certificate (Form 2)27 Jul 2026
Engineer's certificate annexure27 Jul 2026
Accountant's certificate (Form 3)27 Jul 2026
Site photograph, B20 Jul 2026
Site photograph, A20 Jul 2026
Site photograph, D20 Jul 2026
Site photograph, C20 Jul 2026
RERA registration certificate1 Apr 2024
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

70%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep Tilak Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mota Varachha2,600+ in Surat

2 kmTilak HeritageOther 211Dot size: filed unitsN

Filed coordinates, straight-line distance. 211 registered projects within 2 km.

Builder: SAHJANAND GRUP

SAHJANAND GRUP has 2 registrations on GujRERA, including Tilak Heritage and Nand Villa. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if Tilak Heritage is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Tilak Heritage?

The registered promoter entity is SAHJANAND GRUP, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Tilak Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Tilak Heritage?

The professionals named in the filing: Architect: Siddharth Vitthalbhai Patel; Engineer: DARSHAN POPATBHAI SUTARIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tilak Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tilak Heritage. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tilak Heritage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.