Home / Browse projects / Chennai, Tamil Nadu / THULSI
THULSI
By COSTPLUS CONSTRUCTIONS PRIVATE LIMITED
RG-TN-39624 · RERA TNRERA/29/BLG/0320/2025
Source: official TNRERA filing
Red flags
- This page reads no complaints, court cases or extensions from this register, so it raises no flags
Clear
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out bookings building by building, the declared costs, the homes block by block, parking and the approvals as filed and places this filing against every project registered within 2 km.
See what the report covers Free either way: .Saved.
THULSI is a Non-High Rise Building (NHRB) project by COSTPLUS CONSTRUCTIONS PRIVATE LIMITED in Chennai, Tamil Nadu, registered with TNRERA as TNRERA/29/BLG/0320/2025 on 25 Sep 2025. Possession is promised by 30 Jun 2027.
At a glance
Project
- NameTHULSI
- TypeNon-High Rise Building (NHRB)
- Location
- Madipakkam
- Chennai
- 600091
- Pincode600091
- MapView location on Google Maps (as filed on RERA)
- RERA no.TNRERA/29/BLG/0320/2025
- ReraGenie IDRG-TN-39624
Builder
- NameCOSTPLUS CONSTRUCTIONS PRIVATE LIMITED
- Entity typecompany
- CINU45309TN2019PTC133205
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Jun 2027
- Registered on25 Sep 2025
- Promised completion30 Jun 2027
- Buildings1 building record
- Documents filed15 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 13 | - | 13 |
The full filing
Everything below is from the project's own TNRERA filing, free to read.
Land and ownership
TNRERA takes the encumbrance details as an uploaded document, listed under Documents filed below; this page does not read inside it. A search at the sub-registrar is what confirms clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | SENTHIL KUMAR.A |
Documents filed15
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number TNRERA/29/BLG/0320/2025 on the TNRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| registration certificate | - |
| photo | - |
| photo | - |
| planning permission approval / renewal letter | - |
| approved plan with local body seal(upload in readable format) | - |
| building permit letter | - |
| encumbrance certificate from the date of approval of planning permission to rera submission date | - |
| carpet area statement | - |
| carpet area statement (duly signed by registered architect / promoter with seal) | - |
| structural stability certificate along with structural design calculation (indicating site address & no. of fl | - |
| design & drawing for structural stability | - |
| patta / plr / tslr | - |
| construction agreement | - |
| declaration (form b) | - |
| stage of construction & site photographs with date | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's TNRERA filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Land, construction and total cost as declared, set against the other projects of the district
- The homes block by block in the register's two size bands, with the FSI area, and the commercial space by use
- The parking the promoter filed, covered, open and visitor
- The planning permission and building permit: who issued them, in whose name, the numbers and dates, and the clearances named
- Joined against every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep THULSI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Madipakkam500+ in Chennai
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
Hayagriva Apartments
Vikaan Shelters
BBCL DHRITI
BBCL PRIME CONSTRUCTIONS PRIVATE LIMITED
M/s. KUMAARS CREST WOOD
Mr S KUMAR
ADORE
GRAND MARVEL RESIDENTIAL
CASAGRAND UPSTAY PARSLEY
M/s. UPSTAY BUILDER PRIVATE LIMITED, Mrs.S
CUBES SAFFRON
M/S. CUBES INFRASTRUCTURE
See every Chennai project, with the district possession charts
Builder: COSTPLUS CONSTRUCTIONS PRIVATE LIMITED
COSTPLUS CONSTRUCTIONS PRIVATE LIMITED has 1 registration on TNRERA, including THULSI. Read the full track record. See more projects on the Chennai district page.
Frequently asked questions
What are my rights if THULSI is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with TNRERA.
How do I verify and contact the developer of THULSI?
The registered promoter entity is COSTPLUS CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45309TN2019PTC133205 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's TNRERA listing and in its filed documents.
Is my payment protected in THULSI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at THULSI?
The professionals named in the filing: Engineer: SENTHIL KUMAR.A. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THULSI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on TNRERA, and we read every report.
Report an error Share feedback