Home / Browse projects / Mehsana, Gujarat / TAJ MAHEL HILL PALACE

Valid until 28 Feb 2024 Mixed Development project

TAJ MAHEL HILL PALACE

By Govindbhai Patel (Proprietor of Govinda Infra)

RG-GJ-93138 · RERA PR/GJ/MEHSANA/KADI/Others/MAA00946/EX2/A1M/261023 · Last updated on GujRERA portal: 19 Feb 2024

Source: official GujRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • Nothing verified clear yet
Feb 2024Possession promisedmoved 24 months from the original
68 of 72Construction stages doneacross 8 buildings; furthest along: Stilt Floor, 0%
71 of 292Units unsoldnot recorded sold or booked
Jump to the 45 documents Report an error

TAJ MAHEL HILL PALACE is a Mixed Development project by Govindbhai Patel (Proprietor of Govinda Infra) in Mehsana, Gujarat, registered with GujRERA as PR/GJ/MEHSANA/KADI/Others/MAA00946/EX2/A1M/261023 on 7 Dec 2017. Possession is promised by 28 Feb 2024. The completion date has moved by 24 months from the original filing. 221 of the 292 units on this registration are recorded sold or booked, and 68 of 72 construction stages are filed complete.

At a glance

Project

  • NameTAJ MAHEL HILL PALACE
  • TypeMixed Development
  • Location
    • SR NO 216 TAJ MAHEL HILL PALACE
    • MITHI BAGOL
    • NEAR KASBA TALAV
    • KADI
    • Kadi
    • Mehsana
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/MEHSANA/KADI/Others/MAA00946/EX2/A1M/261023
  • ReraGenie IDRG-GJ-93138

Builder

  • NameGovindbhai Patel (Proprietor of Govinda Infra)
  • Entity typeIndividual/Propritorship
  • Other registrations3 more →

Key dates

this monthRegisteredDec 2017First promiseFeb 2022Revised toFeb 2024

Key facts

Registration and timeline

  • StatusValid until 28 Feb 2024
  • Registered on7 Dec 2017
  • Promised completion28 Feb 2024
  • Revised completionRevised to 28 Feb 2024 (originally 28 Feb 2022)
  • Buildings8 building records
  • Documents filed45 files

Current status

76%221 of 292 units booked
83.3%Of the estimated cost spent so far

Figures as on 19 Feb 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK-I---56460
BLOCK-H---56056
A1 BUNGALOWS---19019
A BUNGALOWS---20020
S1 BUNGALOWS---404
S BUNGALOWS---505
BLOCK-B---56864
BLOCK-A---56864

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 19 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

68 of 72 construction stages are filed complete across 8 buildings. The stage furthest along is Stilt Floor, at 0%.

BLOCK-I100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK-H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1 BUNGALOWS89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A BUNGALOWS89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
S1 BUNGALOWS89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
S BUNGALOWS89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK-B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK-A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 19 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,562 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 258.90 cr
Cost incurredRs 215.59 cr
Spent of the estimate83.27%
BuildingWingEstimatedIncurred
BLOCK-INARs 33.38 crRs 33.38 cr
BLOCK-ANARs 33.33 crRs 33.33 cr
BLOCK-BNARs 33.33 crRs 33.33 cr
BLOCK-HNARs 33.33 crRs 33.33 cr
A BUNGALOWSNARs 31.39 crRs 20.40 cr
A1 BUNGALOWSNARs 31.39 crRs 22.29 cr
S BUNGALOWSNARs 31.39 crRs 20.40 cr
S1 BUNGALOWSNARs 31.39 crRs 19.15 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/MEHSANA/KADI/Others/MAA00946/EX1/260422Applied Jan 2022; approved Apr 2022
PR/GJ/MEHSANA/KADI/Others/MAA00946/EX2/261023Applied Oct 2023; approved Oct 2023

Documents filed45

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/MEHSANA/KADI/Others/MAA00946/EX2/A1M/261023 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)19 Feb 2024
Engineer's certificate (Form 2)19 Feb 2024
Engineer's certificate annexure19 Feb 2024
Accountant's certificate (Form 3)19 Feb 2024
Site photograph, BLOCK-I19 Feb 2024
Site photograph, BLOCK-H19 Feb 2024
Site photograph, A1 BUNGALOWS19 Feb 2024
Site photograph, A BUNGALOWS19 Feb 2024
Site photograph, S1 BUNGALOWS19 Feb 2024
Site photograph, S BUNGALOWS19 Feb 2024
Site photograph, BLOCK-B19 Feb 2024
Site photograph, BLOCK-A19 Feb 2024
RERA registration certificate7 Dec 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Mehsana

76%of this project is bookeddistrict median 54%
11%of Mehsana projects moved their completion datethis one moved by 24 months

Computed across the 200+ Mehsana projects on ReraGenie, from their own filings.

Keep TAJ MAHEL HILL PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mehsana200+ in Mehsana

2 kmTAJ MAHEL HILL PALACEOther 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Govindbhai Patel (Proprietor of Govinda Infra)

Govindbhai Patel (Proprietor of Govinda Infra) has 4 registrations on GujRERA, including TAJ MAHEL HILL PALACE and Shiv Palace. Read the full track record. See more projects on the Mehsana district page.

Frequently asked questions

What are my rights if TAJ MAHEL HILL PALACE is delayed beyond 28 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of TAJ MAHEL HILL PALACE?

The registered promoter entity is Govindbhai Patel (Proprietor of Govinda Infra), an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in TAJ MAHEL HILL PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in TAJ MAHEL HILL PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TAJ MAHEL HILL PALACE. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TAJ MAHEL HILL PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.