Home / Browse projects / Valsad, Gujarat / SWARIT B. NO 9 TO 46

Valid until 30 Apr 2028 Residential/Group Housing project

SWARIT B. NO 9 TO 46

By IMPERIA INFRACON

RG-GJ-93162 · RERA PR/GJ/VALSAD/VAPI/Vapi Municipality/RAA14905/040325/311227 · Last updated on GujRERA portal: 4 Mar 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
4 of 9Construction stages donefurthest along: Staircases, 67%
18 of 38Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

SWARIT B. NO 9 TO 46 is a Residential/Group Housing project by IMPERIA INFRACON in Valsad, Gujarat, registered with GujRERA as PR/GJ/VALSAD/VAPI/Vapi Municipality/RAA14905/040325/311227 on 4 Mar 2025. Possession is promised by 30 Apr 2028. 20 of the 38 units on this registration are recorded sold or booked, and 4 of 9 construction stages are filed complete.

At a glance

Project

  • NameSWARIT B. NO 9 TO 46
  • TypeResidential/Group Housing
  • Location
    • Survey No. 877
    • Chala
    • Vapi.
    • Chala
    • Vapi
    • Valsad
    • 396191
  • Pincode396191
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VALSAD/VAPI/Vapi Municipality/RAA14905/040325/311227
  • ReraGenie IDRG-GJ-93162

Builder

  • NameIMPERIA INFRACON
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2025PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on4 Mar 2025
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed40 files

Current status

53%20 of 38 units booked
31.0%Of the estimated cost spent so far

Figures as on 4 Mar 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESI UNITS (9 TO 46)---38038

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 9 construction stages are filed complete. The stage furthest along is Staircases, at 67%.

RESI UNITS (9 TO 46): 66% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor34%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats34%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks67%
External plumbing and external plaster, elevation, completion of terraces with waterproofing32%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing24%

Progress on shared amenities23

As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes25%
Water supplyYes20%
Sewerage (chamber, lines, septic tank, STP)Yes25%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes0%
Street lightingYes20%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes80%
Plinth protectionYes50%
Water tankYes30%
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,072 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 30.00 cr
Cost incurredRs 9.31 cr
Spent of the estimate31.04%
BuildingWingEstimatedIncurred
RESI UNITS (9 TO 46)NARs 30.00 crRs 9.31 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashantkumar Balvantbhai Paradava
EngineerDHANESH JAYPRAKASH NAIR

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VALSAD/VAPI/Vapi Municipality/RAA14905/040325/311227 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate4 Mar 2025
Engineer's certificate (Form 2)22 Jan 2025
Engineer's certificate annexure22 Jan 2025
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Project photograph-
Proforma sale deed-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Valsad

53%of this project is bookeddistrict median 45%
23%of Valsad projects moved their completion datethis one has not

Computed across the 390+ Valsad projects on ReraGenie, from their own filings.

Keep SWARIT B. NO 9 TO 46 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Chala390+ in Valsad

2 kmSWARIT B. NO 9 TO 46Other 82Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: IMPERIA INFRACON

IMPERIA INFRACON has 2 registrations on GujRERA, including Swarit and SWARIT B. NO 9 TO 46. Read the full track record. See more projects on the Valsad district page.

Frequently asked questions

What are my rights if SWARIT B. NO 9 TO 46 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SWARIT B. NO 9 TO 46?

The registered promoter entity is IMPERIA INFRACON, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SWARIT B. NO 9 TO 46?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SWARIT B. NO 9 TO 46?

The professionals named in the filing: Architect: Prashantkumar Balvantbhai Paradava; Engineer: DHANESH JAYPRAKASH NAIR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWARIT B. NO 9 TO 46?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWARIT B. NO 9 TO 46. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWARIT B. NO 9 TO 46 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.