ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / Swaminarayan Green City

Valid until 30 Jun 2026 Mixed Development project

Swaminarayan Green City

By SATYASANKALP BUILDCON LLP

RG-GJ-44281 · RERA PR/GJ/SURAT/KAMREJ/SUDA/MAA02744/A1M/EX1/010725/300626 · Last updated on GujRERA portal: 23 Jun 2025

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Jun 2026Possession promisedmoved 12 months from the original
54 of 117Construction stages doneacross 13 buildings; furthest along: Slabs of Super Structure, 78%
683 of 1,085Units unsoldnot recorded sold or booked
Jump to the 52 documents Report an error

Swaminarayan Green City is a Mixed Development project by SATYASANKALP BUILDCON LLP in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/KAMREJ/SUDA/MAA02744/A1M/EX1/010725/300626 on 30 May 2018. Possession is promised by 30 Jun 2026. The completion date has moved by 12 months from the original filing. 402 of the 1,085 units on this registration are recorded sold or booked, and 54 of 117 construction stages are filed complete.

At a glance

Project

  • NameSwaminarayan Green City
  • TypeMixed Development
  • Location
    • Pasodara Patiya
    • Nr.JB Diamond School
    • Kamrej.
    • Kholvad
    • Kamrej
    • Surat
    • 395006
  • Pincode395006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/KAMREJ/SUDA/MAA02744/A1M/EX1/010725/300626
  • ReraGenie IDRG-GJ-44281

Builder

  • NameSATYASANKALP BUILDCON LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredMay 2018First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2026
  • Registered on30 May 2018
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings13 building records
  • Documents filed52 files

Current status

37%402 of 1,085 units booked
60.8%Of the estimated cost spent so far

Figures as on 23 Jun 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GH---96096
IJ---96096
KL---96096
M---48048
NO---96096
P---48048
QR---96096
S---48048
T---48048
U---48048
AB---9677173
CD---96096
EF---96096

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building13

As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

54 of 117 construction stages are filed complete across 13 buildings. The stage furthest along is Slabs of Super Structure, at 78%.

GH30%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure68%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
IJ29%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure57%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
KL29%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
M81%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats60%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing70%
NO89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
P89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
QR89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
S29%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure57%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
T89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
U28%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
AB27%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
CD33%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure78%
Internal walls, internal plaster, floorings, doors and windows within flats15%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
EF30%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure64%
Internal walls, internal plaster, floorings, doors and windows within flats7%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes33%
Water supplyYes33%
Sewerage (chamber, lines, septic tank, STP)Yes33%
Storm water drainsYes33%
Landscaping and tree plantingYes33%
Street lightingYes33%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes33%
Solid waste management and disposalYes33%
Water conservation, rain water harvestingYes33%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes33%
Electrical meter room, sub-station, receiving stationYes33%
Fire fightingYes33%
Drinking water facilitiesYes33%
Emergency evacuationYes33%
Use of renewable energyYes33%
SecurityYes33%
Letter boxYes33%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area25,329 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 146.19 cr
Cost incurredRs 88.88 cr
Spent of the estimate60.8%
BuildingWingEstimatedIncurred
QRNARs 14.20 crRs 13.59 cr
NONARs 14.20 crRs 13.59 cr
EFNARs 13.65 crRs 5.09 cr
CDNARs 13.61 crRs 6.49 cr
GHNARs 13.61 crRs 6.39 cr
IJNARs 13.61 crRs 6.39 cr
KLNARs 13.61 crRs 6.39 cr
ABNARs 13.60 crRs 5.43 cr
SNARs 7.40 crRs 3.35 cr
UNARs 7.40 crRs 3.46 cr
TNARs 7.33 crRs 5.11 cr
PNARs 6.97 crRs 6.97 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHimanshu N Shah
EngineerHimanshu N Shah

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/KAMREJ/SUDA/MAA02744/A1M/EX1/010725/300626Applied May 2025; approved Jul 2025

Documents filed52

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/KAMREJ/SUDA/MAA02744/A1M/EX1/010725/300626 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)23 Jun 2025
Engineer's certificate (Form 2)23 Jun 2025
Engineer's certificate annexure23 Jun 2025
Accountant's certificate (Form 3)23 Jun 2025
Site photograph, GH23 Jun 2025
Site photograph, GH23 Jun 2025
Site photograph, IJ23 Jun 2025
Site photograph, KL23 Jun 2025
Site photograph, M23 Jun 2025
Site photograph, NO23 Jun 2025
Site photograph, P23 Jun 2025
Site photograph, QR23 Jun 2025
Site photograph, S23 Jun 2025
Site photograph, T23 Jun 2025
Site photograph, U23 Jun 2025
Site photograph, AB23 Jun 2025
Site photograph, CD23 Jun 2025
Site photograph, EF23 Jun 2025
RERA registration certificate30 May 2018
Extension certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

37%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 12 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep Swaminarayan Green City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Kholvad2,600+ in Surat

2 kmSwaminarayan Green CityOther 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: SATYASANKALP BUILDCON LLP

SATYASANKALP BUILDCON LLP has 1 registration on GujRERA, including Swaminarayan Green City. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if Swaminarayan Green City is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Swaminarayan Green City?

The registered promoter entity is SATYASANKALP BUILDCON LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Swaminarayan Green City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Swaminarayan Green City?

The professionals named in the filing: Architect: Himanshu N Shah; Engineer: Himanshu N Shah. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaminarayan Green City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaminarayan Green City. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaminarayan Green City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.