SVASAAR PRAVESH 1 PHASE 2

By SVASAAR VALUE BUILDERS

RG-GJ-93740 · RERA PR/GJ/AHMEDABAD/DASKROI/AUDA/RAA04216/EX1/010822 · Last updated on GujRERA portal: 7 Jun 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Jun 2023Possession promisedmoved 12 months from the original
0 of 72Construction stages doneacross 9 buildings; furthest along: Excavation, 90%
88 of 105Units unsoldnot recorded sold or booked
Jump to the 46 documents Report an error

SVASAAR PRAVESH 1 PHASE 2 is a Residential/Group Housing project by SVASAAR VALUE BUILDERS in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/DASKROI/AUDA/RAA04216/EX1/010822 on 1 Dec 2018. Possession is promised by 30 Jun 2023. The completion date has moved by 12 months from the original filing. 17 of the 105 units on this registration are recorded sold or booked, and 0 of 72 construction stages are filed complete.

At a glance

Project

  • NameSVASAAR PRAVESH 1 PHASE 2
  • TypeResidential/Group Housing
  • Location
    • BS PRIMARY SCHOOL
    • GAMDI CHOSAR ROAD GAMDI
    • Gamdi
    • Daskroi
    • Ahmedabad
    • 382435
  • Pincode382435
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/DASKROI/AUDA/RAA04216/EX1/010822
  • ReraGenie IDRG-GJ-93740

Builder

  • NameSVASAAR VALUE BUILDERS
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2018First promiseJun 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2023
  • Registered on1 Dec 2018
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2022)
  • Buildings9 building records
  • Documents filed46 files

Current status

16%17 of 105 units booked
22.6%Of the estimated cost spent so far

Figures as on 7 Jun 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block U---909
RH 1 1 TO RH 1 14---14014
RH 2 1 TO RH 2 10---10010
Block Q---12012
Block R---12012
Block S---12012
Block H---12012
Block I---12012
Block T---12012

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 7 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 72 construction stages are filed complete across 9 buildings. The stage furthest along is Excavation, at 90%.

Block U0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
RH 1 1 TO RH 1 1480%
ActivityProgress
Excavation80%
Podiums (if any)Not applicable
Plinth80%
Stilt FloorNot applicable
Slabs of Super Structure80%
Internal walls, internal plaster, floorings, doors and windows within flats80%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing80%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
RH 2 1 TO RH 2 1011%
ActivityProgress
Excavation90%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block Q0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block R0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block S0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block H0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block I0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Block T0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 7 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes90%
Water supplyYes90%
Sewerage (chamber, lines, septic tank, STP)Yes80%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes80%
Street lightingYes90%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes80%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,464 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.66 cr
Cost incurredRs 1.28 cr
Spent of the estimate22.59%
BuildingWingEstimatedIncurred
Block QNARs 62.87 lakhRs 14.20 lakh
Block RNARs 62.87 lakhRs 14.20 lakh
Block SNARs 62.87 lakhRs 14.20 lakh
Block HNARs 62.87 lakhRs 14.20 lakh
Block INARs 62.87 lakhRs 14.20 lakh
Block TNARs 62.87 lakhRs 14.20 lakh
Block UNARs 62.87 lakhRs 14.20 lakh
RH 1 1 TO RH 1 14NARs 62.87 lakhRs 14.20 lakh
RH 2 1 TO RH 2 10NARs 62.87 lakhRs 14.20 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNILESH PRAJAPATI
EngineerR G UPADHYAY

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/DASKROI/AUDA/RAA04216/EX1/010822Applied May 2022; approved Aug 2022

Documents filed46

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/DASKROI/AUDA/RAA04216/EX1/010822 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)7 Jun 2023
Architect's certificate (Form 1)6 Jun 2023
Engineer's certificate (Form 2)6 Jun 2023
Engineer's certificate annexure6 Jun 2023
Site photograph, Block U6 Jun 2023
Site photograph, RH 1 1 TO RH 1 146 Jun 2023
Site photograph, RH 2 1 TO RH 2 106 Jun 2023
Site photograph, Block Q6 Jun 2023
Site photograph, Block R6 Jun 2023
Site photograph, Block S6 Jun 2023
Site photograph, Block H6 Jun 2023
Site photograph, Block I6 Jun 2023
Site photograph, Block T6 Jun 2023
RERA registration certificate1 Dec 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

16%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 12 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep SVASAAR PRAVESH 1 PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gamdi5,400+ in Ahmedabad

2 kmSVASAAR PRAVESH 1 PHASE Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SVASAAR VALUE BUILDERS

SVASAAR VALUE BUILDERS has 2 registrations on GujRERA, including SVASAAR PRAVESH 1 and SVASAAR PRAVESH 1 PHASE 2. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if SVASAAR PRAVESH 1 PHASE 2 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SVASAAR PRAVESH 1 PHASE 2?

The registered promoter entity is SVASAAR VALUE BUILDERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SVASAAR PRAVESH 1 PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SVASAAR PRAVESH 1 PHASE 2?

The professionals named in the filing: Architect: NILESH PRAJAPATI; Engineer: R G UPADHYAY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SVASAAR PRAVESH 1 PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SVASAAR PRAVESH 1 PHASE 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SVASAAR PRAVESH 1 PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.