Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2030Possession promisedno revision filed
16 of 36Construction stages doneacross 4 buildings; furthest along: Staircases, 97%
193 of 216Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

SHYAMAL SHASHWAT is a Residential/Group Housing project by SHYAMAL SHASHWAT LLP in Rajkot, Gujarat, registered with GujRERA as PR/GJ/RAJKOT/RAJKOT/Others/RAA11727/060523 on 6 May 2023. Possession is promised by 30 Apr 2030. 23 of the 216 units on this registration are recorded sold or booked, and 16 of 36 construction stages are filed complete.

At a glance

Project

  • NameSHYAMAL SHASHWAT
  • TypeResidential/Group Housing
  • Location
    • NEAR FORTUNE EXOTICA
    • 2ND RING ROAD
    • MOTA MAVA
    • RAJKOT
    • Rajkot
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/RAJKOT/RAJKOT/Others/RAA11727/060523
  • ReraGenie IDRG-GJ-87398

Builder

  • NameSHYAMAL SHASHWAT LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredMay 2023PromisedApr 2030

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2030
  • Registered on6 May 2023
  • Promised completion30 Apr 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

11%23 of 216 units booked
73.8%Of the estimated cost spent so far

Figures as on 11 Aug 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E & F---72072
A---36036
D---36036
B & C---72072

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 97%.

E & F83%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats64%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing53%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing42%
A88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats81%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing64%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing56%
D85%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats67%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing59%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing48%
B & C83%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats95%
Sanitary fittings within the flats64%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing52%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing39%

Progress on shared amenities19

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes40%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes80%
Landscaping and tree plantingYes20%
Street lightingYes5%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes35%
Solid waste management and disposalYes30%
Water conservation, rain water harvestingYes30%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes25%
Fire fightingYes40%
Drinking water facilitiesYes20%
Emergency evacuationYes20%
Use of renewable energyYes35%
SecurityYes20%
Letter boxYes15%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,627 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 119.00 cr
Cost incurredRs 87.79 cr
Spent of the estimate73.77%
BuildingWingEstimatedIncurred
B & CNARs 42.35 crRs 30.49 cr
E & FNARs 37.15 crRs 27.49 cr
ANARs 21.15 crRs 15.86 cr
DNARs 18.35 crRs 13.95 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRATIK DADHANIA
EngineerASHWIN LODHIYA

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/RAJKOT/RAJKOT/Others/RAA11727/060523 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)11 Aug 2026
Architect's certificate (Form 1)10 Aug 2026
Engineer's certificate (Form 2)10 Aug 2026
Engineer's certificate annexure10 Aug 2026
Site photograph, E & F10 Aug 2026
Site photograph, A10 Aug 2026
Site photograph, D10 Aug 2026
Site photograph, B & C10 Aug 2026
RERA registration certificate6 May 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Rajkot

11%of this project is bookeddistrict median 56%
13%of Rajkot projects moved their completion datethis one has not

Computed across the 1,800+ Rajkot projects on ReraGenie, from their own filings.

Keep SHYAMAL SHASHWAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Rajkot1,800+ in Rajkot

2 kmSHYAMAL SHASHWATOther 270Dot size: filed unitsN

Filed coordinates, straight-line distance. 270 registered projects within 2 km.

Builder: SHYAMAL SHASHWAT LLP

SHYAMAL SHASHWAT LLP has 1 registration on GujRERA, including SHYAMAL SHASHWAT. Read the full track record. See more projects on the Rajkot district page.

Frequently asked questions

What are my rights if SHYAMAL SHASHWAT is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHYAMAL SHASHWAT?

The registered promoter entity is SHYAMAL SHASHWAT LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHYAMAL SHASHWAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHYAMAL SHASHWAT?

The professionals named in the filing: Architect: PRATIK DADHANIA; Engineer: ASHWIN LODHIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHYAMAL SHASHWAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHYAMAL SHASHWAT. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHYAMAL SHASHWAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.