ReraGenieLog inGet a buyer report

Home / Browse projects / Ahmedabad, Gujarat / SHANTIPUSHP BUNGLOWS

Valid until 25 Feb 2020 Residential/Group Housing project

SHANTIPUSHP BUNGLOWS

By NANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD

RG-GJ-21074 · RERA PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA01362/EX1/020519 · Last updated on GujRERA portal: 27 Jan 2020

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Feb 2020Possession promisedmoved 12 months from the original
36 of 36Construction stages doneacross 6 buildings; every applicable stage filed complete
7 of 32Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

SHANTIPUSHP BUNGLOWS is a Residential/Group Housing project by NANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA01362/EX1/020519 on 20 Jan 2018. Possession is promised by 25 Feb 2020. The completion date has moved by 12 months from the original filing. 25 of the 32 units on this registration are recorded sold or booked, and 36 of 36 construction stages are filed complete.

At a glance

Project

  • NameSHANTIPUSHP BUNGLOWS
  • TypeResidential/Group Housing
  • Location
    • SHANTIPUSHP BUNGLOWS
    • GOKUL HOTEL ROAD
    • S.G.HIGHWAY
    • GOTA
    • Gota
    • Ahmedabad City
    • Ahmedabad
    • 380060
  • Pincode380060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA01362/EX1/020519
  • ReraGenie IDRG-GJ-21074

Builder

  • NameNANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD
  • Entity typeOther

Key dates

this monthRegisteredJan 2018First promiseFeb 2019Revised toFeb 2020

Key facts

Registration and timeline

  • StatusValid until 25 Feb 2020
  • Registered on20 Jan 2018
  • Promised completion25 Feb 2020
  • Revised completionRevised to 25 Feb 2020 (originally 28 Feb 2019)
  • Buildings6 building records
  • Documents filed43 files

Current status

78%25 of 32 units booked
100.0%Of the estimated cost spent so far

Figures as on 27 Jan 2020, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---10010
B---303
C---404
D---404
E---303
F---808

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 27 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 36 construction stages are filed complete across 6 buildings.

A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 27 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,614 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.31 cr
Cost incurredRs 13.31 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
ANARs 2.22 crRs 2.22 cr
BNARs 2.22 crRs 2.22 cr
CNARs 2.22 crRs 2.22 cr
DNARs 2.22 crRs 2.22 cr
ENARs 2.22 crRs 2.22 cr
FNARs 2.22 crRs 2.22 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA01362/EX1/020519Applied Mar 2019; approved May 2019

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA01362/EX1/020519 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)27 Jan 2020
Architect's certificate (Form 1)24 Jan 2020
Engineer's certificate (Form 2)24 Jan 2020
Engineer's certificate annexure24 Jan 2020
Site photograph, A24 Jan 2020
Site photograph, B24 Jan 2020
Site photograph, C24 Jan 2020
Site photograph, D24 Jan 2020
Site photograph, E24 Jan 2020
Site photograph, F24 Jan 2020
RERA registration certificate20 Jan 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

78%of this project is bookeddistrict median 53%
14%of Ahmedabad projects moved their completion datethis one moved by 12 months

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep SHANTIPUSHP BUNGLOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gota5,400+ in Ahmedabad

2 kmSHANTIPUSHP BUNGLOWSOther 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: NANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD

NANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD has 1 registration on GujRERA, including SHANTIPUSHP BUNGLOWS. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if SHANTIPUSHP BUNGLOWS is delayed beyond 25 Feb 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHANTIPUSHP BUNGLOWS?

The registered promoter entity is NANDANVAN (GOTA) CO OPERATIVE HOUSING SOCIETY LTD. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHANTIPUSHP BUNGLOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in SHANTIPUSHP BUNGLOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTIPUSHP BUNGLOWS. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTIPUSHP BUNGLOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.