Home / Browse projects / Rajkot, Gujarat / SHANDAR RESIDENCY 6

Valid until 31 Dec 2025 Residential/Group Housing project

SHANDAR RESIDENCY 6

By VINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS

RG-GJ-88203 · RERA PR/GJ/RAJKOT/RAJKOT/Others/RAA11950/130623 · Last updated on GujRERA portal: 11 Mar 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
32 of 36Construction stages doneacross 4 buildings; furthest along: Plinth, 0%
35 of 38Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

SHANDAR RESIDENCY 6 is a Residential/Group Housing project by VINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS in Rajkot, Gujarat, registered with GujRERA as PR/GJ/RAJKOT/RAJKOT/Others/RAA11950/130623 on 13 Jun 2023. Possession is promised by 31 Dec 2025. 3 of the 38 units on this registration are recorded sold or booked, and 32 of 36 construction stages are filed complete.

At a glance

Project

  • NameSHANDAR RESIDENCY 6
  • TypeResidential/Group Housing
  • Location
    • 80 FEET ROAD
    • VRUNDAVAN CHOWK
    • OPP. AKSHARTIRTH APARTMENT
    • KOTHARIYA
    • Rajkot
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/RAJKOT/RAJKOT/Others/RAA11950/130623
  • ReraGenie IDRG-GJ-88203

Builder

  • NameVINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredJun 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2025
  • Registered on13 Jun 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

8%3 of 38 units booked
100.0%Of the estimated cost spent so far

Figures as on 11 Mar 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---14014
BLOCK C---11011
BLOCK B---505
BLOCK D---808

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 11 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Plinth, at 0%.

BLOCK A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 11 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,848 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.52 cr
Cost incurredRs 8.52 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
BLOCK ANARs 3.72 crRs 3.72 cr
BLOCK CNARs 2.17 crRs 2.17 cr
BLOCK DNARs 1.58 crRs 1.58 cr
BLOCK BNARs 1.05 crRs 1.05 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHAUMIKKUMAR C. DONGA
EngineerJAY DHOLARIYA

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/RAJKOT/RAJKOT/Others/RAA11950/130623 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)11 Mar 2025
Architect's certificate (Form 1)7 Mar 2025
Site photograph, BLOCK A7 Mar 2025
Site photograph, BLOCK C7 Mar 2025
Site photograph, BLOCK B7 Mar 2025
Site photograph, BLOCK D7 Mar 2025
Engineer's certificate (Form 2)5 Oct 2024
Engineer's certificate annexure5 Oct 2024
RERA registration certificate13 Jun 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Rajkot

8%of this project is bookeddistrict median 56%
13%of Rajkot projects moved their completion datethis one has not

Computed across the 1,800+ Rajkot projects on ReraGenie, from their own filings.

Keep SHANDAR RESIDENCY 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Rajkot1,800+ in Rajkot

2 kmSHANDAR RESIDENCY 6Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: VINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS

VINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS has 1 registration on GujRERA, including SHANDAR RESIDENCY 6. Read the full track record. See more projects on the Rajkot district page.

Frequently asked questions

What are my rights if SHANDAR RESIDENCY 6 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SHANDAR RESIDENCY 6?

The registered promoter entity is VINUBHAI NAGJIBHAI TALAVIYA Proprietor of BRAHMANI DEVLOPERS, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SHANDAR RESIDENCY 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHANDAR RESIDENCY 6?

The professionals named in the filing: Architect: BHAUMIKKUMAR C. DONGA; Engineer: JAY DHOLARIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANDAR RESIDENCY 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANDAR RESIDENCY 6. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANDAR RESIDENCY 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.