ReraGenieLog inGet a buyer report

Home / Browse projects / Valsad, Gujarat / SENTOSA HOME CITY PHASE-2

Valid until 30 Oct 2028 Residential/Group Housing project

SENTOSA HOME CITY PHASE-2

By HUMAN LIFE SPACE

RG-GJ-41721 · RERA PR/GJ/VALSAD/VALSAD/Others/RAA06450/111219 · Last updated on GujRERA portal: 2 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Oct 2028Possession promisedno revision filed
2 of 81Construction stages doneacross 9 buildings; furthest along: External plumbing and external plaster, 98%
71 of 85Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

SENTOSA HOME CITY PHASE-2 is a Residential/Group Housing project by HUMAN LIFE SPACE in Valsad, Gujarat, registered with GujRERA as PR/GJ/VALSAD/VALSAD/Others/RAA06450/111219 on 11 Dec 2019. Possession is promised by 30 Oct 2028. 14 of the 85 units on this registration are recorded sold or booked, and 2 of 81 construction stages are filed complete.

At a glance

Project

  • NameSENTOSA HOME CITY PHASE-2
  • TypeResidential/Group Housing
  • Location
    • SURVEY NO.-279/1 TO3
    • OPP. FELLOWSHIP MISSION SCHOOL
    • Dungra
    • Valsad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VALSAD/VALSAD/Others/RAA06450/111219
  • ReraGenie IDRG-GJ-41721

Builder

  • NameHUMAN LIFE SPACE
  • Entity typePARTNERSHIP FIRM
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2019PromisedOct 2028

Key facts

Registration and timeline

  • StatusValid until 30 Oct 2028
  • Registered on11 Dec 2019
  • Promised completion30 Oct 2028
  • Revised completionNone
  • Buildings9 building records
  • Documents filed38 files

Current status

16%14 of 85 units booked
14.5%Of the estimated cost spent so far

Figures as on 2 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D-3---808
ROW-3---808
ROW-3A---202
R1-TYPE---505
R2-TYPE---15015
R3-TYPE---101
D-1---808
ROW-1---606
D-2---32032

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 2 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 81 construction stages are filed complete across 9 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

D-366%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor62%
Slabs of Super Structure33%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing98%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
ROW-333%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor62%
Slabs of Super Structure33%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
ROW-3A0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
R1-TYPE11%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
R2-TYPE31%
ActivityProgress
Excavation40%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor33%
Slabs of Super Structure33%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats27%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing27%
R3-TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D-135%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor62%
Slabs of Super Structure33%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing15%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
ROW-10%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D-20%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities23

As on 2 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionNoNot applicable
Water tankNoNot applicable
Other requirementsYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,952 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 38.00 cr
Cost incurredRs 5.50 cr
Spent of the estimate14.47%
BuildingWingEstimatedIncurred
D-2NARs 13.80 cr-
R2-TYPENARs 6.55 crRs 1.20 cr
ROW-3NARs 4.75 cr-
D-3NARs 3.45 crRs 2.80 cr
D-1NARs 3.20 crRs 55.00 lakh
ROW-1NARs 2.95 cr-
R1-TYPENARs 2.05 crRs 95.00 lakh
ROW-3ANARs 75.00 lakh-
R3-TYPENARs 50.00 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKINJAL BHANUSHALI
EngineerRAJKUMAR S CHINNAKONDA

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VALSAD/VALSAD/Others/RAA06450/111219 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)2 Oct 2024
Engineer's certificate annexure2 Oct 2024
RERA registration certificate11 Dec 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Valsad

16%of this project is bookeddistrict median 45%
23%of Valsad projects moved their completion datethis one has not

Computed across the 390+ Valsad projects on ReraGenie, from their own filings.

Keep SENTOSA HOME CITY PHASE-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dungra390+ in Valsad

2 kmSENTOSA HOME CITY PHASE-Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: HUMAN LIFE SPACE

HUMAN LIFE SPACE has 2 registrations on GujRERA, including Sentosa Home City - Phase 1 and SENTOSA HOME CITY PHASE-2. Read the full track record. See more projects on the Valsad district page.

Frequently asked questions

What are my rights if SENTOSA HOME CITY PHASE-2 is delayed beyond 30 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of SENTOSA HOME CITY PHASE-2?

The registered promoter entity is HUMAN LIFE SPACE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in SENTOSA HOME CITY PHASE-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SENTOSA HOME CITY PHASE-2?

The professionals named in the filing: Architect: KINJAL BHANUSHALI; Engineer: RAJKUMAR S CHINNAKONDA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENTOSA HOME CITY PHASE-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENTOSA HOME CITY PHASE-2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENTOSA HOME CITY PHASE-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.