Home / Browse projects / Junagadh, Gujarat / Saltora Hills

Valid until 31 Dec 2025 Residential/Group Housing project

Saltora Hills

By VEDAM INFRASTRUCTURE

RG-GJ-00206 · RERA PR/GJ/JUNAGADH/JUNAGADH/Others/RAA10067/210422 · Last updated on GujRERA portal: 1 Apr 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
9 of 9Construction stages doneevery applicable stage filed complete
29 of 36Units unsoldnot recorded sold or booked
Jump to the 41 documents Report an error

Saltora Hills is a Residential/Group Housing project by VEDAM INFRASTRUCTURE in Junagadh, Gujarat, registered with GujRERA as PR/GJ/JUNAGADH/JUNAGADH/Others/RAA10067/210422 on 21 Apr 2022. Possession is promised by 31 Dec 2025. 7 of the 36 units on this registration are recorded sold or booked, and 9 of 9 construction stages are filed complete.

At a glance

Project

  • NameSaltora Hills
  • TypeResidential/Group Housing
  • Location
    • Shreenathji Park
    • Chobari Road
    • Junagadh
    • Junagadh
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/JUNAGADH/JUNAGADH/Others/RAA10067/210422
  • ReraGenie IDRG-GJ-00206

Builder

  • NameVEDAM INFRASTRUCTURE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredApr 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2025
  • Registered on21 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Current status

19%7 of 36 units booked
78.5%Of the estimated cost spent so far

Figures as on 1 Apr 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALTORA HILLS---36036

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 1 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 9 construction stages are filed complete.

SALTORA HILLS: 100% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 1 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,484 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.15 cr
Cost incurredRs 4.83 cr
Spent of the estimate78.52%
BuildingWingEstimatedIncurred
SALTORA HILLSNARs 6.15 crRs 4.83 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPULKIT MORADIYA
EngineerPULKIT MORADIYA

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/JUNAGADH/JUNAGADH/Others/RAA10067/210422 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)1 Apr 2024
Engineer's certificate (Form 2)1 Apr 2024
Engineer's certificate annexure1 Apr 2024
Accountant's certificate (Form 3)1 Apr 2024
Site photograph, SALTORA HILLS1 Apr 2024
RERA registration certificate21 Apr 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Junagadh

19%of this project is bookeddistrict median 32%
7%of Junagadh projects moved their completion datethis one has not

Computed across the 240+ Junagadh projects on ReraGenie, from their own filings.

Keep Saltora Hills on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Junagadh240+ in Junagadh

2 kmSaltora HillsOther 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: VEDAM INFRASTRUCTURE

VEDAM INFRASTRUCTURE has 1 registration on GujRERA, including Saltora Hills. Read the full track record. See more projects on the Junagadh district page.

Frequently asked questions

What are my rights if Saltora Hills is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Saltora Hills?

The registered promoter entity is VEDAM INFRASTRUCTURE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Saltora Hills?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Saltora Hills?

The professionals named in the filing: Architect: PULKIT MORADIYA; Engineer: PULKIT MORADIYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saltora Hills?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saltora Hills. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saltora Hills to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.