Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- Nothing verified clear yet
Saved.
RIVERVIEW HEIGHTS F is a Residential/Group Housing project by SHREE INFRA in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RAA14317/231024/311228 on 23 Oct 2024. Possession is promised by 31 Dec 2029. The completion date has moved by 12 months from the original filing. 0 of the 36 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete.
At a glance
Project
- NameRIVERVIEW HEIGHTS F
- TypeResidential/Group Housing
- Location
- BLOCK NO.53
- 59
- 60
- 62 & 63
- F.P. 137
- TPS 25
- RIVERVIEW HEIGHTS
- PEDAR ROAD
- MOTA VARACHHA
- MOTA VARACHHA
- Surat City
- Surat
- 394101
- Pincode394101
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RAA14317/231024/311228
- ReraGenie IDRG-GJ-35780
Builder
- NameSHREE INFRA
- Entity typePARTNERSHIP FIRM
- Other registrations21 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 31 Dec 2029
- Registered on23 Oct 2024
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2028)
- Buildings1 building record
- Documents filed43 files
Current status
Figures as on 6 May 2026, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F | - | - | - | 36 | 0 | 36 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building1
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
F: 39% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 85% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 22% |
| Sanitary fittings within the flats | 0% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 0% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 10% |
Progress on shared amenities19
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 0% |
| Water supply | Yes | 0% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 0% |
| Storm water drains | Yes | 0% |
| Landscaping and tree planting | Yes | 0% |
| Street lighting | Yes | 0% |
| Community buildings | Yes | 100% |
| Treatment and disposal of sewage and sullage water | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation, rain water harvesting | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Fire fighting | Yes | 0% |
| Drinking water facilities | No | Not applicable |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | Yes | 0% |
| Security | Yes | 0% |
| Letter box | Yes | 0% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F | NA | Rs 26.85 cr | Rs 9.27 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dhara Kantibhai Bhanderi |
| Engineer | JALILBHAI ABDULBHAI SHEIKH |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Documents filed43
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/Surat Municipal Corporation/RAA14317/231024/311228 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Accountant's certificate (Form 3) | 6 May 2026 |
| Engineer's certificate (Form 2) | 2 May 2026 |
| Engineer's certificate annexure | 2 May 2026 |
| Architect's certificate (Form 1) | 30 Apr 2026 |
| Site photograph, F | 30 Apr 2026 |
| RERA registration certificate | 23 Oct 2024 |
| Proforma agreement for sale | - |
| Auditor's report (1 of 3) | - |
| Auditor's report (2 of 3) | - |
| Auditor's report (3 of 3) | - |
| Income tax return (1 of 3) | - |
| Income tax return (2 of 3) | - |
| Income tax return (3 of 3) | - |
| Project specific document | - |
| Drainage affidavit | - |
| Directors' report (1 of 3) | - |
| Directors' report (2 of 3) | - |
| Directors' report (3 of 3) | - |
| Approved sanctioned plan | - |
| Approved layout plan | - |
| Land location | - |
| Encumbrance certificate | - |
| Area development document | - |
| Proforma allotment letter | - |
| Brochure | - |
| Declaration in Form B | - |
| Approved building or plotting plan | - |
| NOCs from authorities | - |
| Title clearance certificate | - |
| Title report | - |
| Property card | - |
| Statutory document | - |
| Project photograph | - |
| Proforma sale deed | - |
| Audited balance sheet (1 of 3) | - |
| Audited balance sheet (2 of 3) | - |
| Audited balance sheet (3 of 3) | - |
| Audited profit and loss statement (1 of 3) | - |
| Audited profit and loss statement (2 of 3) | - |
| Audited profit and loss statement (3 of 3) | - |
| Cash flow statement (1 of 3) | - |
| Cash flow statement (2 of 3) | - |
| Cash flow statement (3 of 3) | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Surat
Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.
Keep RIVERVIEW HEIGHTS F on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOTA VARACHHA2,600+ in Surat
Filed coordinates, straight-line distance. 253 registered projects within 2 km.
Construction Of 752 DUs Of EWS-II Type at T.P.
SURAT MUNICIPAL CORPORATION
SHIVDHARA RESIDENCY
SHIVDHARA BUILDERS
Construction Of 560 DUs Of EWS-I Type at T.P.
SURAT MUNICIPAL CORPORATION
KIRAN BUSINESS HUB
VARUNKUMAR BABUBHAI LAKHANI Proprietor of
SUMAN SURAJ EWS-26 TPS NO 24 (MOTA VARACHHA-UT
SURAT MUNICIPAL CORPORATION
SUMERU CITY MALL PHASE-2
DIVYAM DEVELOPERS
See every Surat project, with the district possession charts
Builder: SHREE INFRA
shree infra has 22 registrations on GujRERA, including NARAYAN AVENUE and RIVERVIEW HEIGHTS (PHASE -II). Read the full track record. See more projects on the Surat district page.
Frequently asked questions
What are my rights if RIVERVIEW HEIGHTS F is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of RIVERVIEW HEIGHTS F?
The registered promoter entity is SHREE INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in RIVERVIEW HEIGHTS F?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at RIVERVIEW HEIGHTS F?
The professionals named in the filing: Architect: Dhara Kantibhai Bhanderi; Engineer: JALILBHAI ABDULBHAI SHEIKH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIVERVIEW HEIGHTS F?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback