ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / RIVANTA GARDEN CITY

Valid until 31 Dec 2025 Residential/Group Housing project

RIVANTA GARDEN CITY

By RUDRA ENTERPRISE

RG-GJ-23534 · RERA PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RN95AA09995/270622 · Last updated on GujRERA portal: 4 Mar 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Dec 2025Possession promisedno revision filed
81 of 81Construction stages doneacross 9 buildings; every applicable stage filed complete
18 of 616Units unsoldnot recorded sold or booked
Jump to the 33 documents Report an error

RIVANTA GARDEN CITY is a Residential/Group Housing project by RUDRA ENTERPRISE in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RN95AA09995/270622 on 27 Jun 2022. Possession is promised by 31 Dec 2025. 598 of the 616 units on this registration are recorded sold or booked, and 81 of 81 construction stages are filed complete.

At a glance

Project

  • NameRIVANTA GARDEN CITY
  • TypeResidential/Group Housing
  • Location
    • BLOCK NO 1170
    • TP NO 37 FP NO 62
    • RIVANTA GARDEN CITY
    • VARIYAV
    • AMROLI
    • VARIYAV
    • SURAT
    • VARIYAV
    • Choryasi
    • Surat
    • 394520
  • Pincode394520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RN95AA09995/270622
  • ReraGenie IDRG-GJ-23534

Builder

  • NameRUDRA ENTERPRISE
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2025
  • Registered on27 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings9 building records
  • Documents filed33 files

Current status

97%598 of 616 units booked
81.1%Of the estimated cost spent so far

Figures as on 4 Mar 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H---56056
I---56056
J-K---1120112
A---56056
B---56056
C---56056
D---56056
E-F---1120112
G---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

81 of 81 construction stages are filed complete across 9 buildings.

H100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
I100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
J-K100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E-F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,012 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 141.00 cr
Cost incurredRs 114.30 cr
Spent of the estimate81.06%
BuildingWingEstimatedIncurred
E-FNARs 24.00 crRs 20.00 cr
J-KNARs 24.00 crRs 19.50 cr
GNARs 15.50 crRs 13.00 cr
HNARs 14.50 crRs 11.10 cr
ANARs 13.00 crRs 10.00 cr
BNARs 13.00 crRs 10.00 cr
INARs 13.00 crRs 11.00 cr
CNARs 12.00 crRs 10.00 cr
DNARs 12.00 crRs 9.70 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNirav Asit Khandwala
EngineerKUNAL NARENKUMAR SUTHAR

Documents filed33

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RN95AA09995/270622 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)4 Mar 2025
Architect's certificate (Form 1)20 Jan 2025
Site photograph, H20 Jan 2025
Site photograph, I20 Jan 2025
Site photograph, J-K20 Jan 2025
Site photograph, A20 Jan 2025
Site photograph, B20 Jan 2025
Site photograph, C20 Jan 2025
Site photograph, D20 Jan 2025
Site photograph, E-F20 Jan 2025
Site photograph, G20 Jan 2025
Engineer's certificate (Form 2)12 Sep 2024
Engineer's certificate annexure12 Sep 2024
RERA registration certificate27 Jun 2022
Proforma agreement for sale-
Project specific document-
Drainage affidavit-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card 2-
Property card-
Project photograph-
Proforma sale deed-

How this compares with Surat

97%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one has not

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep RIVANTA GARDEN CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near VARIYAV2,600+ in Surat

2 kmRIVANTA GARDEN CITYOther 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: RUDRA ENTERPRISE

Rudra Enterprise has 7 registrations on GujRERA, including Rudra Enclave and N D RESIDENCY. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if RIVANTA GARDEN CITY is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of RIVANTA GARDEN CITY?

The registered promoter entity is RUDRA ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in RIVANTA GARDEN CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RIVANTA GARDEN CITY?

The professionals named in the filing: Architect: Nirav Asit Khandwala; Engineer: KUNAL NARENKUMAR SUTHAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RIVANTA GARDEN CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RIVANTA GARDEN CITY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RIVANTA GARDEN CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.