ReraGenieLog inGet a buyer report

Home / Browse projects / Mehsana, Gujarat / OMKAR GRAVITY

Valid until 30 Apr 2031 Mixed Development project

OMKAR GRAVITY

By OMKAR INFRA

RG-GJ-52404 · RERA PR/GJ/MEHSANA/KADI/Kadi Municipality/MAA16239/221225/311230 · Last updated on GujRERA portal: 22 Dec 2025

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2031Possession promisedno revision filed
11 of 63Construction stages doneacross 7 buildings; furthest along: Plinth, 70%
107 of 107Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

OMKAR GRAVITY is a Mixed Development project by OMKAR INFRA in Mehsana, Gujarat, registered with GujRERA as PR/GJ/MEHSANA/KADI/Kadi Municipality/MAA16239/221225/311230 on 22 Dec 2025. Possession is promised by 30 Apr 2031. 0 of the 107 units on this registration are recorded sold or booked, and 11 of 63 construction stages are filed complete.

At a glance

Project

  • NameOMKAR GRAVITY
  • TypeMixed Development
  • Location
    • OMKAR GRAVITY
    • NR. NANDI BUNGLOW
    • KARANNAGAR ROAD
    • KADI
    • KADI
    • Mehsana
    • 382715
  • Pincode382715
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/MEHSANA/KADI/Kadi Municipality/MAA16239/221225/311230
  • ReraGenie IDRG-GJ-52404

Builder

  • NameOMKAR INFRA
  • Entity typePARTNERSHIP FIRM
  • Other registrations6 more →

Key dates

this monthRegisteredDec 2025PromisedApr 2031

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2031
  • Registered on22 Dec 2025
  • Promised completion30 Apr 2031
  • Revised completionNone
  • Buildings7 building records
  • Documents filed38 files

Current status

0%0 of 107 units booked
6.3%Of the estimated cost spent so far

Figures as on 22 Dec 2025, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D---707
A---909
B---808
SHOP---07171
F---202
E---303
C---707

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building7

As on 22 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 63 construction stages are filed complete across 7 buildings. The stage furthest along is Plinth, at 70%.

D20%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth70%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A31%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats30%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
B21%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure30%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
SHOP39%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F22%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats1%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
E11%
ActivityProgress
Excavation50%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats2%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C30%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, internal plaster, floorings, doors and windows within flats18%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 22 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,439 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 13.50 cr
Cost incurredRs 85.00 lakh
Spent of the estimate6.3%
BuildingWingEstimatedIncurred
SHOPNARs 3.13 crRs 30.00 lakh
ANARs 2.72 crRs 12.00 lakh
BNARs 2.42 crRs 10.00 lakh
CNARs 2.04 crRs 15.00 lakh
DNARs 2.04 crRs 18.00 lakh
ENARs 69.00 lakh-
FNARs 46.00 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParth Narendrasingh Vaghela
EngineerCHIRAGKUMAR BHAILALBHAI PATEL

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/MEHSANA/KADI/Kadi Municipality/MAA16239/221225/311230 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate22 Dec 2025
Accountant's certificate (Form 3)17 Dec 2025
Architect's certificate (Form 1)6 Dec 2025
Engineer's certificate (Form 2)6 Dec 2025
Engineer's certificate annexure6 Dec 2025
Site photograph, D6 Dec 2025
Site photograph, A6 Dec 2025
Site photograph, B6 Dec 2025
Site photograph, SHOP6 Dec 2025
Site photograph, F6 Dec 2025
Site photograph, E6 Dec 2025
Site photograph, C6 Dec 2025
Proforma agreement for sale-
Auditor's report (3 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Other document-
Project photograph-
Proforma sale deed-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (3 of 3)-

How this compares with Mehsana

0%of this project is bookeddistrict median 54%
11%of Mehsana projects moved their completion datethis one has not

Computed across the 200+ Mehsana projects on ReraGenie, from their own filings.

Keep OMKAR GRAVITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near KADI200+ in Mehsana

2 kmOMKAR GRAVITYOther 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: OMKAR INFRA

OMKAR INFRA has 7 registrations on GujRERA, including VIVANTA HEIGHTS and COLIN INDUSTRIAL PARK. Read the full track record. See more projects on the Mehsana district page.

Frequently asked questions

What are my rights if OMKAR GRAVITY is delayed beyond 30 Apr 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of OMKAR GRAVITY?

The registered promoter entity is OMKAR INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in OMKAR GRAVITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at OMKAR GRAVITY?

The professionals named in the filing: Architect: Parth Narendrasingh Vaghela; Engineer: CHIRAGKUMAR BHAILALBHAI PATEL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMKAR GRAVITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMKAR GRAVITY. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMKAR GRAVITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.