Valid until 30 Apr 2027 Residential/Group Housing project

NILKANTH ATULYAM

By CHETANKUMAR SHANKARLAL BHANUSHALI

RG-GJ-96831 · RERA PR/GJ/VALSAD/PARDI/Others/RAA09748/280122 · Last updated on GujRERA portal: 17 Mar 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2027Possession promisedno revision filed
49 of 171Construction stages doneacross 19 buildings; furthest along: Stilt Floor, 90%
105 of 176Units unsoldnot recorded sold or booked
Jump to the 60 documents Report an error

NILKANTH ATULYAM is a Residential/Group Housing project by CHETANKUMAR SHANKARLAL BHANUSHALI in Valsad, Gujarat, registered with GujRERA as PR/GJ/VALSAD/PARDI/Others/RAA09748/280122 on 28 Jan 2022. Possession is promised by 30 Apr 2027. 71 of the 176 units on this registration are recorded sold or booked, and 49 of 171 construction stages are filed complete.

At a glance

Project

  • NameNILKANTH ATULYAM
  • TypeResidential/Group Housing
  • Location
    • SURV NO 768 DESAIWAD VAPI
    • VAPI 396191
    • Pardi
    • Valsad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VALSAD/PARDI/Others/RAA09748/280122
  • ReraGenie IDRG-GJ-96831

Builder

  • NameCHETANKUMAR SHANKARLAL BHANUSHALI
  • Entity typeIndividual/Propritorship
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2022PromisedApr 2027

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2027
  • Registered on28 Jan 2022
  • Promised completion30 Apr 2027
  • Revised completionNone
  • Buildings19 building records
  • Documents filed60 files

Current status

40%71 of 176 units booked
57.3%Of the estimated cost spent so far

Figures as on 17 Mar 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
F TYPE---11011
F1 TYPE---13013
G TYPE---404
H TYPE---18018
I TYPE---303
J TYPE---89089
K TYPE---505
L TYPE---101
L1 TYPE---101
M TYPE---101
N TYPE---101
A TYPE---404
A1 TYPE---303
B TYPE---11011
C TYPE---202
C1 TYPE---303
D TYPE---101
D1 TYPE---101
E TYPE---404

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building19

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

49 of 171 construction stages are filed complete across 19 buildings. The stage furthest along is Stilt Floor, at 90%.

F TYPE96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
F1 TYPE96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
G TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
H TYPE61%
ActivityProgress
Excavation80%
Podiums (if any)Not applicable
Plinth80%
Stilt Floor65%
Slabs of Super Structure65%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats55%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing55%
I TYPE96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
J TYPE68%
ActivityProgress
Excavation85%
Podiums (if any)Not applicable
Plinth85%
Stilt Floor85%
Slabs of Super Structure85%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing50%
K TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
L TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
L1 TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
M TYPE81%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
N TYPE81%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing80%
A TYPE0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A1 TYPE70%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth70%
Stilt Floor66%
Slabs of Super Structure66%
Internal walls, internal plaster, floorings, doors and windows within flats66%
Sanitary fittings within the flats66%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks66%
External plumbing and external plaster, elevation, completion of terraces with waterproofing66%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing66%
B TYPE90%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth80%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats90%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
C TYPE22%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C1 TYPE22%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D TYPE34%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor66%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats40%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D1 TYPE33%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor60%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats40%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
E TYPE96%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats80%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing90%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%

Progress on shared amenities19

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes60%
Water supplyYes50%
Sewerage (chamber, lines, septic tank, STP)Yes60%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes50%
Community buildingsYes70%
Treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes50%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes30%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes35%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area32,559 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 73.00 cr
Cost incurredRs 41.83 cr
Spent of the estimate57.3%
BuildingWingEstimatedIncurred
J TYPENARs 25.65 crRs 16.51 cr
H TYPENARs 7.95 crRs 3.84 cr
F1 TYPENARs 6.90 crRs 5.27 cr
B TYPENARs 5.96 crRs 4.08 cr
F TYPENARs 5.83 crRs 4.46 cr
E TYPENARs 3.85 crRs 2.95 cr
A TYPENARs 3.05 cr-
G TYPENARs 2.38 crRs 30.59 lakh
A1 TYPENARs 2.23 crRs 1.18 cr
C1 TYPENARs 1.66 crRs 25.45 lakh
K TYPENARs 1.54 crRs 16.09 lakh
I TYPENARs 1.41 crRs 1.08 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKALPESH S BHANUSHALI
EngineerJALAG JAGDISH T

Documents filed60

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VALSAD/PARDI/Others/RAA09748/280122 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)17 Mar 2026
Architect's certificate (Form 1)16 Mar 2026
Engineer's certificate (Form 2)16 Mar 2026
Engineer's certificate annexure16 Mar 2026
Site photograph, F TYPE16 Mar 2026
Site photograph, F1 TYPE16 Mar 2026
Site photograph, G TYPE16 Mar 2026
Site photograph, H TYPE16 Mar 2026
Site photograph, I TYPE16 Mar 2026
Site photograph, J TYPE16 Mar 2026
Site photograph, K TYPE16 Mar 2026
Site photograph, L TYPE16 Mar 2026
Site photograph, L1 TYPE16 Mar 2026
Site photograph, M TYPE16 Mar 2026
Site photograph, M TYPE16 Mar 2026
Site photograph, N TYPE16 Mar 2026
Site photograph, A TYPE16 Mar 2026
Site photograph, A1 TYPE16 Mar 2026
Site photograph, B TYPE16 Mar 2026
Site photograph, C TYPE16 Mar 2026
Site photograph, C1 TYPE16 Mar 2026
Site photograph, D TYPE16 Mar 2026
Site photograph, D1 TYPE16 Mar 2026
Site photograph, E TYPE16 Mar 2026
RERA registration certificate28 Jan 2022
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Valsad

40%of this project is bookeddistrict median 45%
23%of Valsad projects moved their completion datethis one has not

Computed across the 390+ Valsad projects on ReraGenie, from their own filings.

Keep NILKANTH ATULYAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Valsad390+ in Valsad

2 kmNILKANTH ATULYAMOther 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: CHETANKUMAR SHANKARLAL BHANUSHALI

CHETANKUMAR SHANKARLAL BHANUSHALI has 2 registrations on GujRERA, including NILKANTH ASHIRWAD and NILKANTH ATULYAM. Read the full track record. See more projects on the Valsad district page.

Frequently asked questions

What are my rights if NILKANTH ATULYAM is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of NILKANTH ATULYAM?

The registered promoter entity is CHETANKUMAR SHANKARLAL BHANUSHALI, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in NILKANTH ATULYAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NILKANTH ATULYAM?

The professionals named in the filing: Architect: KALPESH S BHANUSHALI; Engineer: JALAG JAGDISH T. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NILKANTH ATULYAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NILKANTH ATULYAM. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NILKANTH ATULYAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.