Home / Browse projects / Salem, Tamil Nadu / METROPOLE- OG TOWERS
METROPOLE- OG TOWERS
RG-TN-27654 · RERA TNRERA/7/BLG/0313/2025
Source: official TNRERA filing
Red flags
- This page reads no complaints, court cases or extensions from this register, so it raises no flags
Clear
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out bookings building by building, the declared costs, the homes block by block, parking and the approvals as filed and places this filing against the promoter's other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved.
METROPOLE- OG TOWERS is a Non-High Rise Building (NHRB) project by METROPOLE HOMES in Salem, Tamil Nadu, registered with TNRERA as TNRERA/7/BLG/0313/2025 on 22 Sep 2025. Possession is promised by 25 Dec 2029.
At a glance
Project
- NameMETROPOLE- OG TOWERS
- TypeNon-High Rise Building (NHRB)
- Location
- Annadhanapatti
- Salem South
- Salem
- 636002
- Pincode636002
- MapView location on Google Maps (as filed on RERA)
- RERA no.TNRERA/7/BLG/0313/2025
- ReraGenie IDRG-TN-27654
Builder
- NameMETROPOLE HOMES
- Entity typepartnership
- Chairman / CEORamasaamy
- Other registrations4 more →
Key dates
Key facts
Registration and timeline
- StatusValid until 25 Dec 2029
- Registered on22 Sep 2025
- Promised completion25 Dec 2029
- Buildings2 building records
- Documents filed17 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 0 | - | - | - | 0 | - | 0 |
| 1 | - | - | - | 45 | - | 45 |
The full filing
Everything below is from the project's own TNRERA filing, free to read.
Land and ownership
TNRERA takes the encumbrance details as an uploaded document, listed under Documents filed below; this page does not read inside it. A search at the sub-registrar is what confirms clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | N.Manivasagam |
Documents filed17
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number TNRERA/7/BLG/0313/2025 on the TNRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| photo | - |
| planning permission approval / renewal letter | - |
| approved plan with local body seal(upload in readable format) | - |
| building permit letter | - |
| encumbrance certificate from the date of approval of planning permission to rera submission date | - |
| carpet area statement | - |
| carpet area statement (duly signed by registered architect / promoter with seal) | - |
| structural stability certificate along with structural design calculation (indicating site address & no. of fl | - |
| design & drawing for structural stability | - |
| electrical wiring | - |
| plumbing | - |
| patta / plr / tslr | - |
| construction agreement | - |
| declaration (form b) | - |
| stage of construction & site photographs with date | - |
| allotment letter | - |
| others | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's TNRERA filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Land, construction and total cost as declared, set against the other projects of the district
- The homes block by block in the register's two size bands, with the FSI area, and the commercial space by use
- The parking the promoter filed, covered, open and visitor
- The planning permission and building permit: who issued them, in whose name, the numbers and dates, and the clearances named
- Joined against the promoter's other registrations on TNRERA and every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep METROPOLE- OG TOWERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Annadhanapatti24 in Salem
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Chola Ellappa's Grand
Chola Builders
Chola Shivaji
Chola Builders
SHREE KRISHNAA'S ELITE APARTMENT
SALEM SHRI KRISHNAA CONSTRUCTION COMPAANY
KING PALACE APARTMENT
RAJENDRAN J
NAAVAL PARADISE
M/s.NAAVAL PROPERTIES AND DEVELOPERS LLP &
NAAVAL SUNSHINE
NAAVAL PROPERTIES AND DEVELOPERS LLP
See every Salem project, with the district possession charts
Builder: METROPOLE HOMES
METROPOLE HOMES has 5 registrations on TNRERA, including METROPLOE - PUSHPA VIHAR and METROPOLE- OG TOWERS. Read the full track record. See more projects on the Salem district page.
Frequently asked questions
What are my rights if METROPOLE- OG TOWERS is delayed beyond 25 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with TNRERA.
How do I verify and contact the developer of METROPOLE- OG TOWERS?
The registered promoter entity is METROPOLE HOMES, a partnership as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's TNRERA listing and in its filed documents.
Is my payment protected in METROPOLE- OG TOWERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at METROPOLE- OG TOWERS?
The professionals named in the filing: Engineer: N.Manivasagam. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in METROPOLE- OG TOWERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.