Valid until 28 Feb 2019 Commercial project

Maple Trade Centre

By ESSEM INFRA PRIVATE LIMITED

RG-GJ-21844 · RERA PR/GJ/AHMEDABAD/AHMADABAD CITY/AUDA/CAA00008/230817 · Last updated on GujRERA portal: 13 Feb 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Feb 2019Possession promisedno revision filed
9 of 9Construction stages doneevery applicable stage filed complete
Jump to the 50 documents Report an error

Maple Trade Centre is a Commercial project by ESSEM INFRA PRIVATE LIMITED in Ahmedabad, Gujarat, registered with GujRERA as PR/GJ/AHMEDABAD/AHMADABAD CITY/AUDA/CAA00008/230817 on 23 Aug 2017. Possession is promised by 28 Feb 2019.

At a glance

Project

  • NameMaple Trade Centre
  • TypeCommercial
  • Location
    • Maple Trade Centre
    • Opp Patel Media Sun N Step Club Near Surdhara Circle Thaltej Ahmedabad
    • Thaltej
    • Ahmedabad City
    • Ahmedabad
    • 380052
  • Pincode380052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/AHMEDABAD/AHMADABAD CITY/AUDA/CAA00008/230817
  • ReraGenie IDRG-GJ-21844

Builder

  • NameESSEM INFRA PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017PromisedFeb 2019

Key facts

Registration and timeline

  • StatusValid until 28 Feb 2019
  • Registered on23 Aug 2017
  • Promised completion28 Feb 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed50 files

Current status

81.8%Of the estimated cost spent so far

Figures as on 13 Feb 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAPLE TRADE CENTRE-----290

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 13 Feb 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 9 construction stages are filed complete.

MAPLE TRADE CENTRE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 13 Feb 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,032 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 37.53 cr
Cost incurredRs 30.71 cr
Spent of the estimate81.84%
BuildingWingEstimatedIncurred
MAPLE TRADE CENTRENARs 37.53 crRs 30.71 cr

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/AHMEDABAD/AHMADABAD CITY/AUDA/CAA00008/230817 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)13 Feb 2019
Engineer's certificate (Form 2)13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
Site photograph, MAPLE TRADE CENTRE13 Feb 2019
RERA registration certificate23 Aug 2017
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Ahmedabad

14%of Ahmedabad projects moved their completion datethis one has not

Computed across the 5,400+ Ahmedabad projects on ReraGenie, from their own filings.

Keep Maple Trade Centre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Thaltej5,400+ in Ahmedabad

2 kmMaple Trade CentreOther 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 125 registered projects within 2 km.

Builder: ESSEM INFRA PRIVATE LIMITED

ESSEM INFRA PRIVATE LIMITED has 2 registrations on GujRERA, including Maple Trade Centre and MAPLE TREE. Read the full track record. See more projects on the Ahmedabad district page.

Frequently asked questions

What are my rights if Maple Trade Centre is delayed beyond 28 Feb 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Maple Trade Centre?

The registered promoter entity is ESSEM INFRA PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Maple Trade Centre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Maple Trade Centre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maple Trade Centre. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maple Trade Centre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.