Valid until 31 Dec 2019 Residential/Group Housing project

KAILASH RESIDENCY 2

By VARNI ENTERPRISE

RG-GJ-34699 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/RAA02734/EX1/180419 · Last updated on GujRERA portal: 28 Nov 2019

Source: official GujRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Dec 2019Possession promisedmoved 9 months from the original
12 of 12Construction stages doneacross 3 buildings; every applicable stage filed complete
3 of 60Units unsoldnot recorded sold or booked
Jump to the 40 documents Report an error

KAILASH RESIDENCY 2 is a Residential/Group Housing project by VARNI ENTERPRISE in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/RAA02734/EX1/180419 on 30 May 2018. Possession is promised by 31 Dec 2019. The completion date has moved by 9 months from the original filing. 57 of the 60 units on this registration are recorded sold or booked, and 12 of 12 construction stages are filed complete.

At a glance

Project

  • NameKAILASH RESIDENCY 2
  • TypeResidential/Group Housing
  • Location
    • FP 162 BLOCK NO.191
    • DINDOLI KHARWASA ROAD
    • DINDOLI
    • Dindoli
    • Surat City
    • Surat
    • 394210
  • Pincode394210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/RAA02734/EX1/180419
  • ReraGenie IDRG-GJ-34699

Builder

  • NameVARNI ENTERPRISE
  • Entity typePARTNERSHIP FIRM
  • Other registrations4 more →

Key dates

this monthRegisteredMay 2018First promiseMar 2019Revised toDec 2019

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2019
  • Registered on30 May 2018
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Mar 2019)
  • Buildings3 building records
  • Documents filed40 files

Current status

95%57 of 60 units booked
92.9%Of the estimated cost spent so far

Figures as on 28 Nov 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---20020
TOWER B---40040
TOWER C------

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building3

As on 28 Nov 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 12 construction stages are filed complete across 3 buildings.

TOWER A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
TOWER CNot stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 28 Nov 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes0%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,315 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.08 cr
Cost incurredRs 2.86 cr
Spent of the estimate92.93%
BuildingWingEstimatedIncurred
TOWER ANARs 1.02 crRs 95.25 lakh
TOWER BNARs 1.02 crRs 95.25 lakh
TOWER CNARs 1.02 crRs 95.25 lakh

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/SURAT CITY/SUDA/RAA02734/EX1/180419Applied Mar 2019; approved Apr 2019

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/RAA02734/EX1/180419 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)28 Nov 2019
Architect's certificate (Form 1)26 Nov 2019
Engineer's certificate (Form 2)26 Nov 2019
Engineer's certificate annexure26 Nov 2019
Site photograph, TOWER A26 Nov 2019
Site photograph, TOWER B26 Nov 2019
Site photograph, TOWER C26 Nov 2019
RERA registration certificate30 May 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

95%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 9 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep KAILASH RESIDENCY 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dindoli2,600+ in Surat

2 kmKAILASH RESIDENCY 2Other 182Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: VARNI ENTERPRISE

VARNI ENTERPRISE has 5 registrations on GujRERA, including KAILASH RESIDENCY 2 and SHREE VALLEY. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if KAILASH RESIDENCY 2 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of KAILASH RESIDENCY 2?

The registered promoter entity is VARNI ENTERPRISE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in KAILASH RESIDENCY 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in KAILASH RESIDENCY 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAILASH RESIDENCY 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAILASH RESIDENCY 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.