Valid until 31 Dec 2025 Plotted Development project

Jalaram Industrial Park

By Jalaram Developers

RG-GJ-05678 · RERA PR/GJ/VALSAD/VALSAD/Others/PAA12575/031123 · Last updated on GujRERA portal: 3 Nov 2023

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Dec 2025Possession promisedno revision filed
7 of 44Units unsoldnot recorded sold or booked
Jump to the 38 documents Report an error

Jalaram Industrial Park is a Plotted Development project by Jalaram Developers in Valsad, Gujarat, registered with GujRERA as PR/GJ/VALSAD/VALSAD/Others/PAA12575/031123 on 3 Nov 2023. Possession is promised by 31 Dec 2025. 37 of the 44 units on this registration are recorded sold or booked.

At a glance

Project

  • NameJalaram Industrial Park
  • TypePlotted Development
  • Location
    • City Survey No. 2884
    • Abrama
    • Valsad
    • Valsad
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/VALSAD/VALSAD/Others/PAA12575/031123
  • ReraGenie IDRG-GJ-05678

Builder

  • NameJalaram Developers
  • Entity typePARTNERSHIP FIRM
  • Other registrations3 more →

Key dates

this monthRegisteredNov 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2025
  • Registered on3 Nov 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed38 files

Current status

84%37 of 44 units booked
0.0%Of the estimated cost spent so far

Figures as on 3 Nov 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PLOT---0044

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 3 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

PLOT:

ActivityProgress
Excavation-
Podiums (if any)Not applicable
Plinth-
Stilt Floor-
Slabs of Super Structure-
Internal walls, internal plaster, floorings, doors and windows within flats-
Sanitary fittings within the flats-
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks-
External plumbing and external plaster, elevation, completion of terraces with waterproofing-
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing-

Progress on shared amenities23

As on 3 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyNoNot applicable
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingNoNot applicable
Street lightingNoNot applicable
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable
Compound wallYes0%
Plinth protectionNoNot applicable
Water tankNoNot applicable
Other requirementsNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,306 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 1.36 cr
Spent of the estimate0.0%
BuildingWingEstimatedIncurred
PLOTNARs 1.36 cr-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSubhadradevi Sojitra
EngineerRajesh A. Ghorecha

Documents filed38

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/VALSAD/VALSAD/Others/PAA12575/031123 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate3 Nov 2023
Engineer's certificate (Form 2)9 Jun 2023
Engineer's certificate annexure9 Jun 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Valsad

84%of this project is bookeddistrict median 45%
23%of Valsad projects moved their completion datethis one has not

Computed across the 390+ Valsad projects on ReraGenie, from their own filings.

Keep Jalaram Industrial Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Valsad390+ in Valsad

2 kmJalaram Industrial ParkOther 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: Jalaram Developers

JALARAM DEVELOPERS has 4 registrations on GujRERA, including KRISS and Jalaram Industrial Park. Read the full track record. See more projects on the Valsad district page.

Frequently asked questions

What are my rights if Jalaram Industrial Park is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Jalaram Industrial Park?

The registered promoter entity is Jalaram Developers, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Jalaram Industrial Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Jalaram Industrial Park?

The professionals named in the filing: Architect: Subhadradevi Sojitra; Engineer: Rajesh A. Ghorecha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jalaram Industrial Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jalaram Industrial Park. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jalaram Industrial Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.