Valid until 30 Jul 2021 Mixed Development project

ISKCON AMBITO

By AASHUTOSH REALITIES

RG-GJ-88362 · RERA PR/GJ/RAJKOT/RAJKOT/Others/MAA01602/120218 · Last updated on GujRERA portal: 20 Jul 2021

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jul 2021Possession promisedno revision filed
3149 of 3150Construction stages doneacross 350 buildings; furthest along: Stilt Floor, 99%
3 of 350Units unsoldnot recorded sold or booked
Jump to the 387 documents Report an error

ISKCON AMBITO is a Mixed Development project by AASHUTOSH REALITIES in Rajkot, Gujarat, registered with GujRERA as PR/GJ/RAJKOT/RAJKOT/Others/MAA01602/120218 on 12 Feb 2018. Possession is promised by 30 Jul 2021. 347 of the 350 units on this registration are recorded sold or booked, and 3149 of 3150 construction stages are filed complete.

At a glance

Project

  • NameISKCON AMBITO
  • TypeMixed Development
  • Location
    • Mavdi Revenu Survey No. 337 Paikee 1 and 3
    • Plot No. 14/2
    • Mavdi - Kankot Road
    • Mavdi
    • Mavdi
    • Rajkot
    • 360004
  • Pincode360004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/RAJKOT/RAJKOT/Others/MAA01602/120218
  • ReraGenie IDRG-GJ-88362

Builder

  • NameAASHUTOSH REALITIES
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredFeb 2018PromisedJul 2021

Key facts

Registration and timeline

  • StatusValid until 30 Jul 2021
  • Registered on12 Feb 2018
  • Promised completion30 Jul 2021
  • Revised completionNone
  • Buildings350 building records
  • Documents filed387 files

Current status

99%347 of 350 units booked
100.0%Of the estimated cost spent so far

Figures as on 20 Jul 2021, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D 302---101
D 303---101
D 304---101
D 401---101
D 402---101
D 403---101
D 404---101
D 501---101
D 502---101
D 503---101
D 504---101
D 601---101
D 602---101
D 603---101
D 604---101
D 701---101
D 702---101
D 703---101
D 704---101
D 801---101
D 802---101
D 803---101
D 804---101
D 901---101
D 902---101
D 903---101
D 904---101
D 1001---101
D 1002---101
D 1003---101
D 1004---101
D 1101---101
D 1102---101
D 1103---101
D 1104---101
D 1201---101
D 1202---101
D 1203---101
D 1204---101
E 101---101
E 102---101
E 103---101
E 104---101
E 201---101
E 202---101
E 203---101
E 204---101
E 301---101
E 302---101
E 303---101
E 304---101
E 401---101
E 402---101
E 403---101
E 404---101
E 501---101
E 502---101
E 503---101
E 504---101
E 601---101
E 602---101
E 603---101
E 604---101
E 701---101
E 702---101
E 703---101
E 704---101
E 801---101
E 802---101
E 803---101
E 804---101
E 901---101
E 902---101
E 903---101
E 904---101
E 1001---101
E 1002---101
E 1003---101
E 1004---101
E 1101---101
E 1102---101
E 1103---101
E 1104---101
E 1201---101
E 1202---101
E 1203---101
E 1204---101
F 101---101
F 102---101
F 103---101
F 104---101
F 201---101
F 202---101
F 203---101
F 204---101
F 301---101
F 302---101
F 303---101
F 304---101
F 401---101
F 402---101
F 403---101
F 404---101
F 501---101
F 502---101
F 503---101
F 504---101
F 601---101
F 602---101
F 603---101
F 604---101
F 701---101
F 702---101
F 703---101
F 704---101
F 801---101
F 802---101
F 803---101
F 804---101
F 901---101
F 902---101
F 903---101
F 904---101
F 1001---101
F 1002---101
F 1003---101
F 1004---101
F 1101---101
F 1102---101
F 1103---101
F 1104---101
F 1201---101
F 1202---101
F 1203---101
F 1204---101
F 1301---101
F 1303---101
F 1304---101
G 101---101
G 102---101
G 103---101
G 104---101
G 201---101
G 202---101
G 203---101
G 204---101
G 301---101
G 302---101
G 303---101
G 304---101
G 401---101
G 402---101
G 403---101
G 404---101
G 501---101
G 502---101
G 503---101
G 504---101
G 601---101
G 602---101
G 603---101
G 604---101
G 701---101
G 702---101
G 703---101
G 704---101
G 801---101
G 802---101
G 803---101
G 804---101
G 901---101
G 902---101
G 903---101
G 904---101
G 1001---101
G 1002---101
G 1003---101
G 1004---101
G 1101---101
G 1102---101
G 1103---101
G 1104---101
G 1201---101
G 1202---101
G 1203---101
G 1204---101
G 1303---101
G 1304---101
Laundry Shop---011
Convenience Store---011
Milk Product Shop---011
A 101---101
A 102---101
A 103---101
A 104---101
A 201---101
A 202---101
A 203---101
A 204---101
A 301---101
A 302---101
A 303---101
A 304---101
A 401---101
A 402---101
A 403---101
A 404---101
A 501---101
A 502---101
A 503---101
A 504---101
A 601---101
A 602---101
A 603---101
A 604---101
A 701---101
A 702---101
A 703---101
A 704---101
A 801---101
A 802---101
A 803---101
A 804---101
A 901---101
A 902---101
A 903---101
A 904---101
A 1001---101
A 1002---101
A 1003---101
A 1004---101
A 1101---101
A 1102---101
A 1103---101
A 1104---101
A 1201---101
A 1202---101
B 101---101
B 102---101
B 103---101
B 104---101
B 201---101
B 202---101
B 203---101
B 204---101
B 301---101
B 302---101
B 303---101
B 304---101
B 401---101
B 402---101
B 403---101
B 404---101
B 501---101
B 502---101
B 503---101
B 504---101
B 601---101
B 602---101
B 603---101
B 604---101
B 701---101
B 702---101
B 703---101
B 704---101
B 801---101
B 802---101
B 803---101
B 804---101
B 901---101
B 902---101
B 903---101
B 904---101
B 1001---101
B 1002---101
B 1003---101
B 1004---101
B 1101---101
B 1102---101
B 1103---101
B 1104---101
B 1201---101
B 1202---101
B 1203---101
B 1204---101
B 1301---101
B 1302---101
B 1303---101
B 1304---101
C 101---101
C 102---101
C 103---101
C 104---101
C 201---101
C 202---101
C 203---101
C 204---101
C 301---101
C 302---101
C 303---101
C 304---101
C 401---101
C 402---101
C 403---101
C 404---101
C 501---101
C 502---101
C 503---101
C 504---101
C 601---101
C 602---101
C 603---101
C 604---101
C 701---101
C 702---101
C 703---101
C 704---101
C 801---101
C 802---101
C 803---101
C 804---101
C 901---101
C 902---101
C 903---101
C 904---101
C 1001---101
C 1002---101
C 1003---101
C 1004---101
C 1101---101
C 1102---101
C 1103---101
C 1104---101
C 1201---101
C 1202---101
C 1203---101
C 1204---101
C 1301---101
C 1302---101
C 1303---101
C 1304---101
D 101---101
D 102---101
D 103---101
D 104---101
D 201---101
D 202---101
D 203---101
D 204---101
D 301---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 20 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 350 buildings; the table lists the first 20.

3149 of 3150 construction stages are filed complete across 350 buildings. The stage furthest along is Stilt Floor, at 99%.

D 302100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 303100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 304100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 401100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 402100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 403100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 404100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 501100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 502100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 503100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 504100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 601100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 602100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 603100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 604100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 701100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 702100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 703100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 704100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D 801100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 20 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsNoNot applicable
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingNoNot applicable
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationYes100%
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,240 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 37.80 cr
Cost incurredRs 37.80 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
Laundry ShopNARs 10.80 lakhRs 10.80 lakh
Convenience StoreNARs 10.80 lakhRs 10.80 lakh
Milk Product ShopNARs 10.80 lakhRs 10.80 lakh
A 101NARs 10.80 lakhRs 10.80 lakh
A 102NARs 10.80 lakhRs 10.80 lakh
A 103NARs 10.80 lakhRs 10.80 lakh
A 104NARs 10.80 lakhRs 10.80 lakh
A 201NARs 10.80 lakhRs 10.80 lakh
A 202NARs 10.80 lakhRs 10.80 lakh
A 203NARs 10.80 lakhRs 10.80 lakh
A 204NARs 10.80 lakhRs 10.80 lakh
A 301NARs 10.80 lakhRs 10.80 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhavesh Patel
EngineerSanjay Unjia

Documents filed387

As listed on the registration, under the names the promoter filed them with; the newest 80 of 387 are shown. The files themselves are available at source: search the registration number PR/GJ/RAJKOT/RAJKOT/Others/MAA01602/120218 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)20 Jul 2021
Architect's certificate (Form 1)6 Jul 2021
Engineer's certificate (Form 2)6 Jul 2021
Engineer's certificate annexure6 Jul 2021
Site photograph, E 1016 Jul 2021
Site photograph, E 1026 Jul 2021
Site photograph, E 1036 Jul 2021
Site photograph, E 1046 Jul 2021
Site photograph, E 2016 Jul 2021
Site photograph, E 2026 Jul 2021
Site photograph, E 2036 Jul 2021
Site photograph, E 2046 Jul 2021
Site photograph, E 3016 Jul 2021
Site photograph, E 3026 Jul 2021
Site photograph, E 3036 Jul 2021
Site photograph, E 3046 Jul 2021
Site photograph, E 4016 Jul 2021
Site photograph, E 4026 Jul 2021
Site photograph, E 4036 Jul 2021
Site photograph, E 4046 Jul 2021
Site photograph, E 5016 Jul 2021
Site photograph, E 5026 Jul 2021
Site photograph, E 5036 Jul 2021
Site photograph, E 5046 Jul 2021
Site photograph, E 6016 Jul 2021
Site photograph, E 6026 Jul 2021
Site photograph, E 6036 Jul 2021
Site photograph, E 6046 Jul 2021
Site photograph, E 7016 Jul 2021
Site photograph, E 7026 Jul 2021
Site photograph, E 7036 Jul 2021
Site photograph, E 7046 Jul 2021
Site photograph, E 8016 Jul 2021
Site photograph, E 8026 Jul 2021
Site photograph, E 8036 Jul 2021
Site photograph, E 8046 Jul 2021
Site photograph, E 9016 Jul 2021
Site photograph, E 9026 Jul 2021
Site photograph, E 9036 Jul 2021
Site photograph, E 9046 Jul 2021
Site photograph, E 10016 Jul 2021
Site photograph, E 10026 Jul 2021
Site photograph, E 10036 Jul 2021
Site photograph, E 10046 Jul 2021
Site photograph, E 11016 Jul 2021
Site photograph, E 11026 Jul 2021
Site photograph, E 11036 Jul 2021
Site photograph, E 11046 Jul 2021
Site photograph, E 12016 Jul 2021
Site photograph, E 12026 Jul 2021
Site photograph, E 12036 Jul 2021
Site photograph, E 12046 Jul 2021
Site photograph, F 1016 Jul 2021
Site photograph, F 1026 Jul 2021
Site photograph, F 1036 Jul 2021
Site photograph, F 1046 Jul 2021
Site photograph, F 2016 Jul 2021
Site photograph, F 2026 Jul 2021
Site photograph, F 2036 Jul 2021
Site photograph, F 2046 Jul 2021
Site photograph, F 3016 Jul 2021
Site photograph, F 3026 Jul 2021
Site photograph, F 3036 Jul 2021
Site photograph, F 3046 Jul 2021
Site photograph, F 4016 Jul 2021
Site photograph, F 4026 Jul 2021
Site photograph, F 4036 Jul 2021
Site photograph, F 4046 Jul 2021
Site photograph, F 5016 Jul 2021
Site photograph, F 5026 Jul 2021
Site photograph, F 5036 Jul 2021
Site photograph, F 5046 Jul 2021
Site photograph, F 6016 Jul 2021
Site photograph, F 6026 Jul 2021
Site photograph, F 6036 Jul 2021
Site photograph, F 6046 Jul 2021
Site photograph, F 7016 Jul 2021
Site photograph, F 7026 Jul 2021
Site photograph, F 7036 Jul 2021
Site photograph, F 7046 Jul 2021

How this compares with Rajkot

99%of this project is bookeddistrict median 56%
13%of Rajkot projects moved their completion datethis one has not

Computed across the 1,800+ Rajkot projects on ReraGenie, from their own filings.

Keep ISKCON AMBITO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mavdi1,800+ in Rajkot

2 kmISKCON AMBITOOther 374Dot size: filed unitsN

Filed coordinates, straight-line distance. 374 registered projects within 2 km.

Builder: AASHUTOSH REALITIES

AASHUTOSH REALITIES has 1 registration on GujRERA, including ISKCON AMBITO. Read the full track record. See more projects on the Rajkot district page.

Frequently asked questions

What are my rights if ISKCON AMBITO is delayed beyond 30 Jul 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ISKCON AMBITO?

The registered promoter entity is AASHUTOSH REALITIES, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ISKCON AMBITO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ISKCON AMBITO?

The professionals named in the filing: Architect: Bhavesh Patel; Engineer: Sanjay Unjia. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ISKCON AMBITO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ISKCON AMBITO. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ISKCON AMBITO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.