Home / Browse projects / Haveri, Karnataka / Haveri CMC 1112 G+1 Group Housing Project
Haveri CMC 1112 G+1 Group Housing Project
By Haveri CMC 1112 DU's G+1 Project
RG-KA-82939 · RERA PRM/KA/RERA/1262/429/PR/140622/004984 · Last updated on RERA Karnataka portal: 2 Nov 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Haveri CMC 1112 G+1 Group Housing Project is a Residential/Group Housing project by Haveri CMC 1112 DU's G+1 Project in Haveri, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1262/429/PR/140622/004984 on 14 Jun 2022. Possession is promised by 31 Dec 2025.
At a glance
Project
- NameHaveri CMC 1112 G+1 Group Housing Project
- TypeResidential/Group Housing
- Location
- Haveri
- 581110
- Pincode581110
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1262/429/PR/140622/004984
- ReraGenie IDRG-KA-82939
Builder
- NameHaveri CMC 1112 DU's G+1 Project
- Entity typeRajiv Gandhi Housing Corporation Limited
- Authorized SignatoryCommissioner Haveri
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 Jun 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed41 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 1112 | 0 | 1112 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 2 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities34
As on 2 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | - |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| City municipal Council Commissioner Haveri | - | - |
| City municipal Council Commissioner Haveri | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 83.60 cr | - |
| On-site expenditure-Consultants Fees | Rs 83.60 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aminbhavi & Hegde Consulting Engineers Pvt Ltd |
| Engineer | Aminbhavi & Hegde Consulting Engineers Pvt Ltd |
| Chartered Accountant | CMC Commissioner |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed41
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1262/429/PR/140622/004984 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| AffidavitFile: Affidavit B-compressed.pdf | 2 Nov 2026 |
| covering LetterFile: DocScanner 21 Sep 2026 5-44 pm.pdf | 24 Sep 2026 |
| Ex-5 and EX-6File: Signed copy for Rera Extn-compressed.pdf | 24 Sep 2026 |
| Affidivit -BFile: Form-B-compressed.pdf | 24 Sep 2026 |
| EX-7File: Ex-7-compressed.pdf | 24 Sep 2026 |
| The Government projectFile: Adobe Scan 31 Mar 2026_compressed.pdf | 7 Apr 2026 |
| RTC, survey 33/3 | - |
| Mutation, survey 33/3 | - |
| Encumbrance Certificate, survey 33/3 | - |
| Conversion/Alienation Order, survey 33/3 | - |
| Khatha, survey 33/3 | - |
| RTC, survey 292/1a/292/3 | - |
| Mutation, survey 292/1a/292/3 | - |
| Encumbrance Certificate, survey 292/1a/292/3 | - |
| Conversion/Alienation Order, survey 292/1a/292/3 | - |
| Khatha, survey 292/1a/292/3 | - |
| Registration CertificateFile: Registration copy Haveri CMC.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| Work order haveri1112 (1) | - |
| Approved Layout plan Haveri G+1 | - |
| Approved Layout plan Haveri G+1 | - |
| Approved Layout plan Haveri G+1 | - |
| cross section | - |
| cross section | - |
| Approved Layout plan Haveri G+1 | - |
| Approved Layout plan Haveri G+1 | - |
| Work order haveri1112 (1) | - |
| Work order haveri1112 (1) | - |
| plan | - |
| Architect Certificate for Work Completion Schedule till DateFile: Ex7_compressed (1).pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Signed copy for Rera Extn-compressed.pdf | - |
| CA Certificate for Funds UtilizationFile: Adobe Scan 21 Feb 2026 (2)_compressed.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Ex7_compressed (1).pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Signed copy for Rera Extn-compressed.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Adobe Scan 21 Feb 2026 (2)_compressed.pdf | - |
| AffidavitFile: Ex-7-compressed.pdf | - |
| Latest Encumbrance CertificateFile: ilovepdf_merged_compressed.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Adobe Scan 31 Mar 2026_compressed.pdf | - |
| Document 1File: DocScanner 21 Sep 2026 5-44 pm.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Haveri
Computed across the 35 Haveri projects on ReraGenie, from their own filings.
Keep Haveri CMC 1112 G+1 Group Housing Project on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Haveri35 in Haveri
POURAKARMIKA GRUHA BHAGYA YOJANA 30DU'S
CITY MUNICIPAL COUNCIL COMMISSIONER
BRINDAVAN Residential layout
VINOD K SANGHAVI
Banashree Layout
Manjunath Murteppa Kunchur
Byadagi Town_500 DUs under PMAY(U)-HFA Scheme
KARNATAKA SLUM DEVELOPMENT BOARD
CHINNIKATTI LAYOUT
RAJESH GUDDAPPA CHINNIKATTI
CONSTRUCTION OF 250 GF DUs IN BYADAGI TOWN
Karnataka Slum Development Board
See every Haveri project, with the district possession charts
Builder: Haveri CMC 1112 DU's G+1 Project
Haveri CMC 1112 DU's G+1 Project has 1 registration on RERA Karnataka, including Haveri CMC 1112 G+1 Group Housing Project. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Haveri district page.
Frequently asked questions
What are my rights if Haveri CMC 1112 G+1 Group Housing Project is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Haveri CMC 1112 G+1 Group Housing Project?
The registered promoter entity is Haveri CMC 1112 DU's G+1 Project, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Haveri CMC 1112 G+1 Group Housing Project?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Haveri CMC 1112 G+1 Group Housing Project?
The professionals named in the filing: Architect: Aminbhavi & Hegde Consulting Engineers Pvt Ltd; Engineer: Aminbhavi & Hegde Consulting Engineers Pvt Ltd; Chartered Accountant: CMC Commissioner. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Haveri CMC 1112 G+1 Group Housing Project?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback