Haveri CMC 1112 G+1 Group Housing Project

By Haveri CMC 1112 DU's G+1 Project

RG-KA-82939 · RERA PRM/KA/RERA/1262/429/PR/140622/004984 · Last updated on RERA Karnataka portal: 2 Nov 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 41 documents Report an error

Haveri CMC 1112 G+1 Group Housing Project is a Residential/Group Housing project by Haveri CMC 1112 DU's G+1 Project in Haveri, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1262/429/PR/140622/004984 on 14 Jun 2022. Possession is promised by 31 Dec 2025.

At a glance

Project

  • NameHaveri CMC 1112 G+1 Group Housing Project
  • TypeResidential/Group Housing
  • Location
    • Haveri
    • 581110
  • Pincode581110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1262/429/PR/140622/004984
  • ReraGenie IDRG-KA-82939

Builder

  • NameHaveri CMC 1112 DU's G+1 Project
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryCommissioner Haveri

Key dates

this monthRegisteredJun 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Jun 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---111201112

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities34

As on 2 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,469 sq m
Named landowners2
LandownerVillageDistrict
City municipal Council Commissioner Haveri--
City municipal Council Commissioner Haveri--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 84.44 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 83.60 cr-
On-site expenditure-Consultants FeesRs 83.60 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAminbhavi & Hegde Consulting Engineers Pvt Ltd
EngineerAminbhavi & Hegde Consulting Engineers Pvt Ltd
Chartered AccountantCMC Commissioner

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed41

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1262/429/PR/140622/004984 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AffidavitFile: Affidavit B-compressed.pdf2 Nov 2026
covering LetterFile: DocScanner 21 Sep 2026 5-44 pm.pdf24 Sep 2026
Ex-5 and EX-6File: Signed copy for Rera Extn-compressed.pdf24 Sep 2026
Affidivit -BFile: Form-B-compressed.pdf24 Sep 2026
EX-7File: Ex-7-compressed.pdf24 Sep 2026
The Government projectFile: Adobe Scan 31 Mar 2026_compressed.pdf7 Apr 2026
RTC, survey 33/3-
Mutation, survey 33/3-
Encumbrance Certificate, survey 33/3-
Conversion/Alienation Order, survey 33/3-
Khatha, survey 33/3-
RTC, survey 292/1a/292/3-
Mutation, survey 292/1a/292/3-
Encumbrance Certificate, survey 292/1a/292/3-
Conversion/Alienation Order, survey 292/1a/292/3-
Khatha, survey 292/1a/292/3-
Registration CertificateFile: Registration copy Haveri CMC.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
Work order haveri1112 (1)-
Approved Layout plan Haveri G+1-
Approved Layout plan Haveri G+1-
Approved Layout plan Haveri G+1-
cross section-
cross section-
Approved Layout plan Haveri G+1-
Approved Layout plan Haveri G+1-
Work order haveri1112 (1)-
Work order haveri1112 (1)-
plan-
Architect Certificate for Work Completion Schedule till DateFile: Ex7_compressed (1).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Signed copy for Rera Extn-compressed.pdf-
CA Certificate for Funds UtilizationFile: Adobe Scan 21 Feb 2026 (2)_compressed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Ex7_compressed (1).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Signed copy for Rera Extn-compressed.pdf-
CA Certificate for Funds required for Project CompletionFile: Adobe Scan 21 Feb 2026 (2)_compressed.pdf-
AffidavitFile: Ex-7-compressed.pdf-
Latest Encumbrance CertificateFile: ilovepdf_merged_compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: Adobe Scan 31 Mar 2026_compressed.pdf-
Document 1File: DocScanner 21 Sep 2026 5-44 pm.pdf-

How this compares with Haveri

2%of Haveri projects moved their completion datethis one has not
0%of Haveri registrations are shown as withdrawn or revokedthis one is not

Computed across the 35 Haveri projects on ReraGenie, from their own filings.

Keep Haveri CMC 1112 G+1 Group Housing Project on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Haveri35 in Haveri

Builder: Haveri CMC 1112 DU's G+1 Project

Haveri CMC 1112 DU's G+1 Project has 1 registration on RERA Karnataka, including Haveri CMC 1112 G+1 Group Housing Project. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Haveri district page.

Frequently asked questions

What are my rights if Haveri CMC 1112 G+1 Group Housing Project is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Haveri CMC 1112 G+1 Group Housing Project?

The registered promoter entity is Haveri CMC 1112 DU's G+1 Project, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Haveri CMC 1112 G+1 Group Housing Project?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Haveri CMC 1112 G+1 Group Housing Project?

The professionals named in the filing: Architect: Aminbhavi & Hegde Consulting Engineers Pvt Ltd; Engineer: Aminbhavi & Hegde Consulting Engineers Pvt Ltd; Chartered Accountant: CMC Commissioner. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haveri CMC 1112 G+1 Group Housing Project?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haveri CMC 1112 G+1 Group Housing Project. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haveri CMC 1112 G+1 Group Housing Project to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.