ReraGenieLog inGet a buyer report

Home / Browse projects / Surat, Gujarat / HARI KRISHNA TOWNSHIP

Valid until 31 Mar 2023 Mixed Development project

HARI KRISHNA TOWNSHIP

By FULIBEN DHANJIBHAI DHOLAKIA

RG-GJ-46030 · RERA PR/GJ/SURAT/SURAT CITY/SUDA/MAA01489/EX1/030622 · Last updated on GujRERA portal: 28 Mar 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2023Possession promisedmoved 11 months from the original
95 of 95Construction stages doneacross 11 buildings; every applicable stage filed complete
227 of 450Units unsoldnot recorded sold or booked
Jump to the 48 documents Report an error

HARI KRISHNA TOWNSHIP is a Mixed Development project by FULIBEN DHANJIBHAI DHOLAKIA in Surat, Gujarat, registered with GujRERA as PR/GJ/SURAT/SURAT CITY/SUDA/MAA01489/EX1/030622 on 3 Feb 2018. Possession is promised by 31 Mar 2023. The completion date has moved by 11 months from the original filing. 223 of the 450 units on this registration are recorded sold or booked, and 95 of 95 construction stages are filed complete.

At a glance

Project

  • NameHARI KRISHNA TOWNSHIP
  • TypeMixed Development
  • Location
    • BLOCK NO. 52/A & 52/B VAV GAM
    • TALUKA-KAMREJ
    • Vav
    • Surat City
    • Surat
    • 394326
  • Pincode394326
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/SURAT/SURAT CITY/SUDA/MAA01489/EX1/030622
  • ReraGenie IDRG-GJ-46030

Builder

  • NameFULIBEN DHANJIBHAI DHOLAKIA
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredFeb 2018First promiseApr 2022Revised toMar 2023

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2023
  • Registered on3 Feb 2018
  • Promised completion31 Mar 2023
  • Revised completionRevised to 31 Mar 2023 (originally 28 Apr 2022)
  • Buildings11 building records
  • Documents filed48 files

Current status

50%223 of 450 units booked
100.0%Of the estimated cost spent so far

Figures as on 28 Mar 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C2---40040
C3---40040
D---18422
A1---58462
A2---60060
A3---60060
B1---27936
B2---30030
B3---30030
B4---30030
C1---40040

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building11

As on 28 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

95 of 95 construction stages are filed complete across 11 buildings.

C2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 28 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes100%
Energy managementYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,288 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 24.19 cr
Cost incurredRs 24.19 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
A1NARs 2.20 crRs 2.20 cr
A2NARs 2.20 crRs 2.20 cr
A3NARs 2.20 crRs 2.20 cr
B1NARs 2.20 crRs 2.20 cr
B2NARs 2.20 crRs 2.20 cr
B3NARs 2.20 crRs 2.20 cr
B4NARs 2.20 crRs 2.20 cr
C1NARs 2.20 crRs 2.20 cr
C2NARs 2.20 crRs 2.20 cr
C3NARs 2.20 crRs 2.20 cr
DNARs 2.20 crRs 2.20 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSMIT THAKKAR
EngineerSMIT THAKKAR

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/SURAT/SURAT CITY/SUDA/MAA01489/EX1/030622Applied Apr 2022; approved Jun 2022

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/SURAT/SURAT CITY/SUDA/MAA01489/EX1/030622 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)28 Mar 2023
Engineer's certificate (Form 2)28 Mar 2023
Engineer's certificate annexure28 Mar 2023
Accountant's certificate (Form 3)28 Mar 2023
Site photograph, C228 Mar 2023
Site photograph, C328 Mar 2023
Site photograph, D28 Mar 2023
Site photograph, A128 Mar 2023
Site photograph, A228 Mar 2023
Site photograph, A328 Mar 2023
Site photograph, B128 Mar 2023
Site photograph, B228 Mar 2023
Site photograph, B328 Mar 2023
Site photograph, B428 Mar 2023
Site photograph, C128 Mar 2023
RERA registration certificate3 Feb 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Surat

50%of this project is bookeddistrict median 39%
15%of Surat projects moved their completion datethis one moved by 11 months

Computed across the 2,600+ Surat projects on ReraGenie, from their own filings.

Keep HARI KRISHNA TOWNSHIP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vav2,600+ in Surat

2 kmHARI KRISHNA TOWNSHIPOther 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: FULIBEN DHANJIBHAI DHOLAKIA

FULIBEN DHANJIBHAI DHOLAKIA has 1 registration on GujRERA, including HARI KRISHNA TOWNSHIP. Read the full track record. See more projects on the Surat district page.

Frequently asked questions

What are my rights if HARI KRISHNA TOWNSHIP is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of HARI KRISHNA TOWNSHIP?

The registered promoter entity is FULIBEN DHANJIBHAI DHOLAKIA, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in HARI KRISHNA TOWNSHIP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HARI KRISHNA TOWNSHIP?

The professionals named in the filing: Architect: SMIT THAKKAR; Engineer: SMIT THAKKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI KRISHNA TOWNSHIP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI KRISHNA TOWNSHIP. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI KRISHNA TOWNSHIP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.