Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Dec 2030Possession promisedno revision filed
8 of 117Construction stages doneacross 13 buildings; furthest along: Internal walls, 50%
27 of 27Units unsoldnot recorded sold or booked
Jump to the 70 documents Report an error

HARE KRISHNA GOLD is a Residential/Group Housing project by RIKEN RAMJIBHAI ATOS in Banaskantha, Gujarat, registered with GujRERA as PR/GJ/BANASKANTHA/PALANPUR/Palanpur Municipality/RAA17509/231026/311230 on 23 Oct 2026. Possession is promised by 31 Dec 2030. 0 of the 27 units on this registration are recorded sold or booked, and 8 of 117 construction stages are filed complete.

At a glance

Project

  • NameHARE KRISHNA GOLD
  • TypeResidential/Group Housing
  • Location
    • Near Hare Krishna Glory
    • Opp. Govinda School
    • Dairy Road
    • Palanpur
    • PALANPUR
    • Banaskantha
    • 385001
  • Pincode385001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BANASKANTHA/PALANPUR/Palanpur Municipality/RAA17509/231026/311230
  • ReraGenie IDRG-GJ-52247

Builder

  • NameRIKEN RAMJIBHAI ATOS
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredOct 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2030
  • Registered on23 Oct 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings13 building records
  • Documents filed70 files

Current status

0%0 of 27 units booked
15.0%Of the estimated cost spent so far

Figures as on 23 Oct 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B---707
C---101
D---101
E---101
F---101
G---101
H---101
I---101
J---101
K---101
L---101
M---101
A---909

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building13

As on 23 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 117 construction stages are filed complete across 13 buildings. The stage furthest along is Internal walls, at 50%.

B6%
ActivityProgress
Excavation25%
Podiums (if any)Not applicable
Plinth15%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
C31%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
D31%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
E31%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
F31%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure25%
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
G0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
H0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
I0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
J0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
K0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
L0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
M0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
A6%
ActivityProgress
Excavation25%
Podiums (if any)Not applicable
Plinth15%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, internal plaster, floorings, doors and windows within flats10%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 23 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes0%
Water supplyYes5%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes0%
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyYes0%
SecurityYes0%
Letter boxYes0%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,904 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 5.75 cr
Cost incurredRs 86.20 lakh
Spent of the estimate14.99%
BuildingWingEstimatedIncurred
ANARs 1.98 crRs 24.75 lakh
BNARs 1.55 crRs 21.70 lakh
LNARs 22.00 lakh-
ENARs 21.50 lakhRs 10.75 lakh
HNARs 21.50 lakh-
KNARs 21.00 lakh-
CNARs 20.00 lakhRs 10.00 lakh
DNARs 20.00 lakhRs 10.00 lakh
INARs 20.00 lakh-
JNARs 20.00 lakh-
GNARs 19.00 lakh-
MNARs 19.00 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUrvil Rameshbhai Patel
EngineerRAHULKUMAR CHHOTUBHAI BADGURJAR

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BANASKANTHA/PALANPUR/Palanpur Municipality/RAA17509/231026/311230 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA registration certificate23 Oct 2026
Engineer's certificate (Form 2)28 Sep 2026
Engineer's certificate annexure28 Sep 2026
Accountant's certificate (Form 3)28 Sep 2026
Architect's certificate (Form 1)27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, B27 Sep 2026
Site photograph, C27 Sep 2026
Site photograph, D27 Sep 2026
Site photograph, E27 Sep 2026
Site photograph, F27 Sep 2026
Site photograph, G27 Sep 2026
Site photograph, H27 Sep 2026
Site photograph, I27 Sep 2026
Site photograph, J27 Sep 2026
Site photograph, K27 Sep 2026
Site photograph, L27 Sep 2026
Site photograph, M27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Site photograph, A27 Sep 2026
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Drainage affidavit-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Declaration in Form B-
Approved building or plotting plan-
NOCs from authorities-
Title clearance certificate-
Title report-
Property card-
Statutory document-
Other document-
Project photograph-
Proforma sale deed-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Banaskantha

0%of this project is bookeddistrict median 40%
13%of Banaskantha projects moved their completion datethis one has not

Computed across the 93 Banaskantha projects on ReraGenie, from their own filings.

Keep HARE KRISHNA GOLD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near PALANPUR93 in Banaskantha

2 kmHARE KRISHNA GOLDOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: RIKEN RAMJIBHAI ATOS

RIKEN RAMJIBHAI ATOS has 1 registration on GujRERA, including HARE KRISHNA GOLD. Read the full track record. See more projects on the Banaskantha district page.

Frequently asked questions

What are my rights if HARE KRISHNA GOLD is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of HARE KRISHNA GOLD?

The registered promoter entity is RIKEN RAMJIBHAI ATOS, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in HARE KRISHNA GOLD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at HARE KRISHNA GOLD?

The professionals named in the filing: Architect: Urvil Rameshbhai Patel; Engineer: RAHULKUMAR CHHOTUBHAI BADGURJAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARE KRISHNA GOLD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARE KRISHNA GOLD. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARE KRISHNA GOLD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.