GROUP HOUSING SCHEME AT GADAG - BETAGERI

By GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C

RG-KA-57484 · RERA PRM/KA/RERA/1260/414/PR/100625/007810 · Last updated on RERA Karnataka portal: 17 Apr 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 52 documents Report an error

GROUP HOUSING SCHEME AT GADAG - BETAGERI is a Residential/Group Housing project by GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C in Gadag, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1260/414/PR/100625/007810 on 10 Jun 2025. Possession is promised by 21 Jan 2025.

At a glance

Project

  • NameGROUP HOUSING SCHEME AT GADAG - BETAGERI
  • TypeResidential/Group Housing
  • Location
    • Gadag - Betigeri
    • Gadag
    • 582102
  • Pincode582102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1260/414/PR/100625/007810
  • ReraGenie IDRG-KA-57484

Builder

  • NameGROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C
  • Entity typeKarnataka Housing Board
  • Authorized SignatoryAsst Executive Engineer

Key dates

Registered
10 Jun 2025
Promised
21 Jan 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Jun 2025
  • Promised completion21 Jan 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gadag---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,219 sq m
Named landowners1
LandownerVillageDistrict
KARNATAKA HOUSING BOARD--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 39.56 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 29.92 cr-
Payment of taxesRs 5.39 cr-
On-site expenditure-Consultants FeesRs 1.35 cr-
On-site expenditure-Salaries of workersRs 1.20 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 68.54 lakh-
Payment of cessRs 60.00 lakh-
On-site expenditure-Site OverheadRs 29.92 lakh-
Payment of chargesRs 12.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Hulkoti Architects & Associates.
EngineerAngadi
Chartered AccountantAravind M Hejib

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed52

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1260/414/PR/100625/007810 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1234567890File: profit and loss account and balance sheet.pdf17 Apr 2025
123File: registration certificate.pdf28 Mar 2025
RTC, survey 360/1B-
Mutation, survey 360/1B-
Encumbrance Certificate, survey 360/1B-
Conversion/Alienation Order, survey 360/1B-
Khatha, survey 360/1B-
Registration CertificateFile: reregistration certificate.pdf-
GST CertificateFile: GST certificate.pdf-
Certificate issued by CA Form 1File: certificate issued by ca from 1.pdf-
Certificate issued by Architect Form 2File: certificate issued by architect from 2.pdf-
Certificate issued by Engineer Form 3File: certificate issued by engineer from 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Motions reg (1).pdf-
Balance Sheet 2023 - 2024File: bank sheet 2023-24.pdf-
Balance Sheet 2022 - 2023File: bank sheet 2023-24.pdf-
Balance Sheet 2021 - 2022File: bank sheet 2023-24.pdf-
Audited Profit and Loss Statement 2023 - 2024File: certificate issued by architect from 2.pdf-
Audited Profit and Loss Statement 2022 - 2023File: certificate issued by architect from 2.pdf-
Audited Profit and Loss Statement 2021 - 2022File: certificate issued by architect from 2.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: certificate issued by architect from 2.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: certificate issued by architect from 2.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: certificate issued by architect from 2.pdf-
certificate issued by architect from 2-
sectional drawing of the apartment-
sectional drawing of the apartment-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-
certificate issued by architect from 2-

Keep GROUP HOUSING SCHEME AT GADAG - BETAGERI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gadag14 in Gadag

Builder: GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C

GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C has 1 registration on RERA Karnataka, including GROUP HOUSING SCHEME AT GADAG - BETAGERI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Gadag district page.

Frequently asked questions

What are my rights if GROUP HOUSING SCHEME AT GADAG - BETAGERI is delayed beyond 21 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of GROUP HOUSING SCHEME AT GADAG - BETAGERI?

The registered promoter entity is GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C, a karnataka housing board as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in GROUP HOUSING SCHEME AT GADAG - BETAGERI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at GROUP HOUSING SCHEME AT GADAG - BETAGERI?

The professionals named in the filing: Architect: Sandeep Hulkoti Architects & Associates.; Engineer: Angadi; Chartered Accountant: Aravind M Hejib. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GROUP HOUSING SCHEME AT GADAG - BETAGERI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GROUP HOUSING SCHEME AT GADAG - BETAGERI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GROUP HOUSING SCHEME AT GADAG - BETAGERI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.