DWARKADHAM SOCIETY
By KANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers )
RG-GJ-05532 · RERA PR/GJ/VADODARA/CHHOTA UDAIPUR/Others/RAA06066/210919 · Last updated on GujRERA portal: 11 Feb 2024
Source: official GujRERA filing
Red flags
- No red flags in this filing
Clear
- Completion date never moved
- Separate project account declared
Saved.
DWARKADHAM SOCIETY is a Residential/Group Housing project by KANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers ) in Chhota Udaipur, Gujarat, registered with GujRERA as PR/GJ/VADODARA/CHHOTA UDAIPUR/Others/RAA06066/210919 on 21 Sep 2019. Possession is promised by 30 Sep 2022. 81 of the 96 units on this registration are recorded sold or booked, and 864 of 864 construction stages are filed complete.
At a glance
Project
- NameDWARKADHAM SOCIETY
- TypeResidential/Group Housing
- Location
- C. Su. No. 1912/P
- Palace Road
- Chhota Udepur
- Chhota Udaipur
- 391165
- Pincode391165
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR/GJ/VADODARA/CHHOTA UDAIPUR/Others/RAA06066/210919
- ReraGenie IDRG-GJ-05532
Builder
- NameKANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers )
- Entity typeIndividual/Propritorship
Key dates
Key facts
Registration and timeline
- StatusValid until 30 Sep 2022
- Registered on21 Sep 2019
- Promised completion30 Sep 2022
- Revised completionNone
- Buildings96 building records
- Documents filed139 files
Current status
Figures as on 11 Feb 2024, this project's latest GujRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B01 | - | - | - | 1 | 0 | 1 |
| A02 | - | - | - | 1 | 0 | 1 |
| A03 | - | - | - | 1 | 0 | 1 |
| A04 | - | - | - | 1 | 0 | 1 |
| A05 | - | - | - | 1 | 0 | 1 |
| A06 | - | - | - | 1 | 0 | 1 |
| A07 | - | - | - | 1 | 0 | 1 |
| A08 | - | - | - | 1 | 0 | 1 |
| A09 | - | - | - | 1 | 0 | 1 |
| A10 | - | - | - | 1 | 0 | 1 |
| A11 | - | - | - | 1 | 0 | 1 |
| A12 | - | - | - | 1 | 0 | 1 |
| A13 | - | - | - | 1 | 0 | 1 |
| A14 | - | - | - | 1 | 0 | 1 |
| A15 | - | - | - | 1 | 0 | 1 |
| A16 | - | - | - | 1 | 0 | 1 |
| A17 | - | - | - | 1 | 0 | 1 |
| A18 | - | - | - | 1 | 0 | 1 |
| A19 | - | - | - | 1 | 0 | 1 |
| A20 | - | - | - | 1 | 0 | 1 |
| A21 | - | - | - | 1 | 0 | 1 |
| A22 | - | - | - | 1 | 0 | 1 |
| A23 | - | - | - | 1 | 0 | 1 |
| B24 | - | - | - | 1 | 0 | 1 |
| B25 | - | - | - | 1 | 0 | 1 |
| A26 | - | - | - | 1 | 0 | 1 |
| A27 | - | - | - | 1 | 0 | 1 |
| A28 | - | - | - | 1 | 0 | 1 |
| A29 | - | - | - | 1 | 0 | 1 |
| A30 | - | - | - | 1 | 0 | 1 |
| A31 | - | - | - | 1 | 0 | 1 |
| A32 | - | - | - | 1 | 0 | 1 |
| A33 | - | - | - | 1 | 0 | 1 |
| A34 | - | - | - | 1 | 0 | 1 |
| A35 | - | - | - | 1 | 0 | 1 |
| A36 | - | - | - | 1 | 0 | 1 |
| A37 | - | - | - | 1 | 0 | 1 |
| A38 | - | - | - | 1 | 0 | 1 |
| A39 | - | - | - | 1 | 0 | 1 |
| A40 | - | - | - | 1 | 0 | 1 |
| A41 | - | - | - | 1 | 0 | 1 |
| A42 | - | - | - | 1 | 0 | 1 |
| A43 | - | - | - | 1 | 0 | 1 |
| A44 | - | - | - | 1 | 0 | 1 |
| A45 | - | - | - | 1 | 0 | 1 |
| A46 | - | - | - | 1 | 0 | 1 |
| A47 | - | - | - | 1 | 0 | 1 |
| B48 | - | - | - | 1 | 0 | 1 |
| B49 | - | - | - | 1 | 0 | 1 |
| A50 | - | - | - | 1 | 0 | 1 |
| A51 | - | - | - | 1 | 0 | 1 |
| A52 | - | - | - | 1 | 0 | 1 |
| A53 | - | - | - | 1 | 0 | 1 |
| A54 | - | - | - | 1 | 0 | 1 |
| A55 | - | - | - | 1 | 0 | 1 |
| A56 | - | - | - | 1 | 0 | 1 |
| A57 | - | - | - | 1 | 0 | 1 |
| A58 | - | - | - | 1 | 0 | 1 |
| A59 | - | - | - | 1 | 0 | 1 |
| A60 | - | - | - | 1 | 0 | 1 |
| A61 | - | - | - | 1 | 0 | 1 |
| A62 | - | - | - | 1 | 0 | 1 |
| A63 | - | - | - | 1 | 0 | 1 |
| A64 | - | - | - | 1 | 0 | 1 |
| A65 | - | - | - | 1 | 0 | 1 |
| A66 | - | - | - | 1 | 0 | 1 |
| A67 | - | - | - | 1 | 0 | 1 |
| A68 | - | - | - | 1 | 0 | 1 |
| A69 | - | - | - | 1 | 0 | 1 |
| A70 | - | - | - | 1 | 0 | 1 |
| A71 | - | - | - | 1 | 0 | 1 |
| B72 | - | - | - | 1 | 0 | 1 |
| B73 | - | - | - | 1 | 0 | 1 |
| A74 | - | - | - | 1 | 0 | 1 |
| A75 | - | - | - | 1 | 0 | 1 |
| A76 | - | - | - | 1 | 0 | 1 |
| A77 | - | - | - | 1 | 0 | 1 |
| A78 | - | - | - | 1 | 0 | 1 |
| A79 | - | - | - | 1 | 0 | 1 |
| A80 | - | - | - | 1 | 0 | 1 |
| A81 | - | - | - | 1 | 0 | 1 |
| A82 | - | - | - | 1 | 0 | 1 |
| A83 | - | - | - | 1 | 0 | 1 |
| A84 | - | - | - | 1 | 0 | 1 |
| A85 | - | - | - | 1 | 0 | 1 |
| A86 | - | - | - | 1 | 0 | 1 |
| A87 | - | - | - | 1 | 0 | 1 |
| A88 | - | - | - | 1 | 0 | 1 |
| A89 | - | - | - | 1 | 0 | 1 |
| A90 | - | - | - | 1 | 0 | 1 |
| A91 | - | - | - | 1 | 0 | 1 |
| A92 | - | - | - | 1 | 0 | 1 |
| A93 | - | - | - | 1 | 0 | 1 |
| A94 | - | - | - | 1 | 0 | 1 |
| A95 | - | - | - | 1 | 0 | 1 |
| B96 | - | - | - | 1 | 0 | 1 |
The full filing
Everything below is from the project's own GujRERA filing, free to read.
Construction progress by building20
As on 11 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 96 buildings; the table lists the first 20.
864 of 864 construction stages are filed complete across 96 buildings.
B01100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A02100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A03100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A04100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A05100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A06100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A07100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A08100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A09100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A10100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A11100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A12100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A13100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A14100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A15100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A16100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A17100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A18100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A19100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
A20100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, internal plaster, floorings, doors and windows within flats | 100% |
| Sanitary fittings within the flats | 100% |
| Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing | 100% |
| Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing | 100% |
Progress on shared amenities19
As on 11 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal roads and footpaths | Yes | 100% |
| Water supply | Yes | 100% |
| Sewerage (chamber, lines, septic tank, STP) | Yes | 100% |
| Storm water drains | Yes | 100% |
| Landscaping and tree planting | Yes | 100% |
| Street lighting | Yes | 100% |
| Community buildings | No | Not applicable |
| Treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation, rain water harvesting | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Fire fighting | No | Not applicable |
| Drinking water facilities | No | Not applicable |
| Emergency evacuation | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Security | No | Not applicable |
| Letter box | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B01 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B24 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B25 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B48 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B49 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B72 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B73 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| B96 | NA | Rs 8.70 lakh | Rs 8.70 lakh |
| A02 | NA | Rs 8.30 lakh | Rs 8.30 lakh |
| A03 | NA | Rs 8.30 lakh | Rs 8.30 lakh |
| A04 | NA | Rs 8.30 lakh | Rs 8.30 lakh |
| A05 | NA | Rs 8.30 lakh | Rs 8.30 lakh |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RANA MAHAVIR |
| Engineer | BIPINCHANDRA S. JAYSWAL |
Documents filed139
As listed on the registration, under the names the promoter filed them with; the newest 80 of 139 are shown. The files themselves are available at source: search the registration number PR/GJ/VADODARA/CHHOTA UDAIPUR/Others/RAA06066/210919 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Accountant's certificate (Form 3) | 11 Feb 2024 |
| Architect's certificate (Form 1) | 8 Feb 2024 |
| Engineer's certificate (Form 2) | 8 Feb 2024 |
| Engineer's certificate annexure | 8 Feb 2024 |
| Site photograph, B01 | 8 Feb 2024 |
| Site photograph, A02 | 8 Feb 2024 |
| Site photograph, A03 | 8 Feb 2024 |
| Site photograph, A04 | 8 Feb 2024 |
| Site photograph, A05 | 8 Feb 2024 |
| Site photograph, A06 | 8 Feb 2024 |
| Site photograph, A07 | 8 Feb 2024 |
| Site photograph, A08 | 8 Feb 2024 |
| Site photograph, A09 | 8 Feb 2024 |
| Site photograph, A10 | 8 Feb 2024 |
| Site photograph, A11 | 8 Feb 2024 |
| Site photograph, A11 | 8 Feb 2024 |
| Site photograph, A12 | 8 Feb 2024 |
| Site photograph, A13 | 8 Feb 2024 |
| Site photograph, A13 | 8 Feb 2024 |
| Site photograph, A14 | 8 Feb 2024 |
| Site photograph, A15 | 8 Feb 2024 |
| Site photograph, A16 | 8 Feb 2024 |
| Site photograph, A17 | 8 Feb 2024 |
| Site photograph, A18 | 8 Feb 2024 |
| Site photograph, A19 | 8 Feb 2024 |
| Site photograph, A20 | 8 Feb 2024 |
| Site photograph, A21 | 8 Feb 2024 |
| Site photograph, A22 | 8 Feb 2024 |
| Site photograph, A23 | 8 Feb 2024 |
| Site photograph, B24 | 8 Feb 2024 |
| Site photograph, B25 | 8 Feb 2024 |
| Site photograph, A26 | 8 Feb 2024 |
| Site photograph, A27 | 8 Feb 2024 |
| Site photograph, A28 | 8 Feb 2024 |
| Site photograph, A29 | 8 Feb 2024 |
| Site photograph, A30 | 8 Feb 2024 |
| Site photograph, A31 | 8 Feb 2024 |
| Site photograph, A32 | 8 Feb 2024 |
| Site photograph, A33 | 8 Feb 2024 |
| Site photograph, A34 | 8 Feb 2024 |
| Site photograph, A35 | 8 Feb 2024 |
| Site photograph, A36 | 8 Feb 2024 |
| Site photograph, A37 | 8 Feb 2024 |
| Site photograph, A38 | 8 Feb 2024 |
| Site photograph, A39 | 8 Feb 2024 |
| Site photograph, A40 | 8 Feb 2024 |
| Site photograph, A41 | 8 Feb 2024 |
| Site photograph, A42 | 8 Feb 2024 |
| Site photograph, A43 | 8 Feb 2024 |
| Site photograph, A44 | 8 Feb 2024 |
| Site photograph, A45 | 8 Feb 2024 |
| Site photograph, A46 | 8 Feb 2024 |
| Site photograph, A47 | 8 Feb 2024 |
| Site photograph, B48 | 8 Feb 2024 |
| Site photograph, B49 | 8 Feb 2024 |
| Site photograph, A50 | 8 Feb 2024 |
| Site photograph, A51 | 8 Feb 2024 |
| Site photograph, A52 | 8 Feb 2024 |
| Site photograph, A53 | 8 Feb 2024 |
| Site photograph, A54 | 8 Feb 2024 |
| Site photograph, A55 | 8 Feb 2024 |
| Site photograph, A56 | 8 Feb 2024 |
| Site photograph, A57 | 8 Feb 2024 |
| Site photograph, A58 | 8 Feb 2024 |
| Site photograph, A59 | 8 Feb 2024 |
| Site photograph, A60 | 8 Feb 2024 |
| Site photograph, A61 | 8 Feb 2024 |
| Site photograph, A62 | 8 Feb 2024 |
| Site photograph, A63 | 8 Feb 2024 |
| Site photograph, A64 | 8 Feb 2024 |
| Site photograph, A65 | 8 Feb 2024 |
| Site photograph, A65 | 8 Feb 2024 |
| Site photograph, A66 | 8 Feb 2024 |
| Site photograph, A67 | 8 Feb 2024 |
| Site photograph, A68 | 8 Feb 2024 |
| Site photograph, A69 | 8 Feb 2024 |
| Site photograph, A70 | 8 Feb 2024 |
| Site photograph, A71 | 8 Feb 2024 |
| Site photograph, B72 | 8 Feb 2024 |
| Site photograph, B73 | 8 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Keep DWARKADHAM SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Chhota Udepur4 in Chhota Udaipur
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
SABARI PARK CO. OP. HOUSING SOCIETY
SABARI PARK CO OP HOUSING SOCIETY LIMITED
AYODHYA NAGARI
SHREE CHOGALA DEVELOPERS
SHREE GOKULDHAM TOWNSHIP
Mr Lalbhai Valsurbhai Charan
SHREE BALAJI HEIGHTS
SHREE CHOGALA DEVELOPERS
See every Chhota Udaipur project, with the district possession charts
Builder: KANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers )
KANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers ) has 1 registration on GujRERA, including DWARKADHAM SOCIETY. Read the full track record. See more projects on the Chhota Udaipur district page.
Frequently asked questions
What are my rights if DWARKADHAM SOCIETY is delayed beyond 30 Sep 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.
How do I verify and contact the developer of DWARKADHAM SOCIETY?
The registered promoter entity is KANTILAL CHANDMAL SHAH (Propriter of Bhagvati Developers ), an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.
Is my payment protected in DWARKADHAM SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DWARKADHAM SOCIETY?
The professionals named in the filing: Architect: RANA MAHAVIR; Engineer: BIPINCHANDRA S. JAYSWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DWARKADHAM SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.
Report an error Share feedback