ReraGenieLog inGet a buyer report

Home / Browse projects / Gir Somnath, Gujarat / CORAL 28

Valid until 1 Jan 2025 Residential/Group Housing project

CORAL 28

By STAVYA ESTATE

RG-GJ-42192 · RERA PR/GJ/GIR SOMNATH/VERAVAL/Others/RAA06181/151019 · Last updated on GujRERA portal: 7 Nov 2022

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jan 2025Possession promisedno revision filed
70 of 70Construction stages doneacross 10 buildings; every applicable stage filed complete
13 of 28Units unsoldnot recorded sold or booked
Jump to the 50 documents Report an error

CORAL 28 is a Residential/Group Housing project by STAVYA ESTATE in Gir Somnath, Gujarat, registered with GujRERA as PR/GJ/GIR SOMNATH/VERAVAL/Others/RAA06181/151019 on 15 Oct 2019. Possession is promised by 1 Jan 2025. 15 of the 28 units on this registration are recorded sold or booked, and 70 of 70 construction stages are filed complete.

At a glance

Project

  • NameCORAL 28
  • TypeResidential/Group Housing
  • Location
    • CORAL 28
    • NEAR PATEL TIMBERS
    • NR SAIBABA MANDIR
    • JUNAGADH ROAD
    • VERAVAL
    • Veraval
    • Gir Somnath
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GIR SOMNATH/VERAVAL/Others/RAA06181/151019
  • ReraGenie IDRG-GJ-42192

Builder

  • NameSTAVYA ESTATE
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2019PromisedJan 2025

Key facts

Registration and timeline

  • StatusValid until 1 Jan 2025
  • Registered on15 Oct 2019
  • Promised completion1 Jan 2025
  • Revised completionNone
  • Buildings10 building records
  • Documents filed50 files

Current status

54%15 of 28 units booked
99.2%Of the estimated cost spent so far

Figures as on 7 Nov 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type 1---101
Type 2---303
Type 3---101
Type 4---303
Type 5---101
Type 6---101
Type 7---10010
Type 8---101
Type 9---606
Type 10---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building10

As on 7 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

70 of 70 construction stages are filed complete across 10 buildings.

Type 1100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 2100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 3100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 4100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 5100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 6100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 7100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 8100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 9100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
Type 10100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,328 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.54 cr
Cost incurredRs 4.50 cr
Spent of the estimate99.22%
BuildingWingEstimatedIncurred
Type 1NARs 45.39 lakhRs 45.03 lakh
Type 2NARs 45.39 lakhRs 45.03 lakh
Type 3NARs 45.39 lakhRs 45.03 lakh
Type 4NARs 45.39 lakhRs 45.03 lakh
Type 5NARs 45.39 lakhRs 45.03 lakh
Type 6NARs 45.39 lakhRs 45.03 lakh
Type 7NARs 45.39 lakhRs 45.03 lakh
Type 8NARs 45.39 lakhRs 45.03 lakh
Type 9NARs 45.39 lakhRs 45.03 lakh
Type 10NARs 45.39 lakhRs 45.03 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAITANYA SINHAR
EngineerPRAKASHCHANDRA HARJIVAN CHAUHAN

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GIR SOMNATH/VERAVAL/Others/RAA06181/151019 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Nov 2022
Engineer's certificate (Form 2)7 Nov 2022
Engineer's certificate annexure7 Nov 2022
Accountant's certificate (Form 3)7 Nov 2022
Site photograph, Type 17 Nov 2022
Site photograph, Type 27 Nov 2022
Site photograph, Type 37 Nov 2022
Site photograph, Type 47 Nov 2022
Site photograph, Type 57 Nov 2022
Site photograph, Type 67 Nov 2022
Site photograph, Type 77 Nov 2022
Site photograph, Type 87 Nov 2022
Site photograph, Type 97 Nov 2022
Site photograph, Type 107 Nov 2022
RERA registration certificate15 Oct 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gir Somnath

54%of this project is bookeddistrict median 52%
0%of Gir Somnath projects moved their completion datethis one has not

Computed across the 20 Gir Somnath projects on ReraGenie, from their own filings.

Keep CORAL 28 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Veraval20 in Gir Somnath

2 kmCORAL 28Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: STAVYA ESTATE

STAVYA ESTATE has 1 registration on GujRERA, including CORAL 28. Read the full track record. See more projects on the Gir Somnath district page.

Frequently asked questions

What are my rights if CORAL 28 is delayed beyond 1 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of CORAL 28?

The registered promoter entity is STAVYA ESTATE, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in CORAL 28?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at CORAL 28?

The professionals named in the filing: Architect: CHAITANYA SINHAR; Engineer: PRAKASHCHANDRA HARJIVAN CHAUHAN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CORAL 28?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CORAL 28. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CORAL 28 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.