ReraGenieLog inGet a buyer report

Home / Browse projects / Chennai, Tamil Nadu / Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation

Valid until 28 Feb 2025 Non-High Rise Building (NHRB) project

Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation

By TNUHDB

RG-TN-12507 · RERA TN/29/Building/0455/2024

Source: official TNRERA filing

Red flags

  • This page reads no complaints, court cases or extensions from this register, so it raises no flags

Clear

  • Separate project account declared
Jump to the 15 documents Report an error

Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation is a Non-High Rise Building (NHRB) project by TNUHDB in Chennai, Tamil Nadu, registered with TNRERA as TN/29/Building/0455/2024 on 20 Aug 2024. Possession is promised by 28 Feb 2025.

At a glance

Project

  • NameConstruction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation
  • TypeNon-High Rise Building (NHRB)
  • Location
    • Mylapore
    • Chennai
    • 600014
  • Pincode600014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.TN/29/Building/0455/2024
  • ReraGenie IDRG-TN-12507

Builder

  • NameTNUHDB
  • Entity typefirm
  • Other registrations29 more →

Key dates

this monthRegisteredAug 2024PromisedFeb 2025

Key facts

Registration and timeline

  • StatusValid until 28 Feb 2025
  • Registered on20 Aug 2024
  • Promised completion28 Feb 2025
  • Buildings1 building record
  • Documents filed15 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---2-2

The full filing

Everything below is from the project's own TNRERA filing, free to read.

Land and ownership

TNRERA takes the encumbrance details as an uploaded document, listed under Documents filed below; this page does not read inside it. A search at the sub-registrar is what confirms clear land.

Land area565 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerG.KOPPERUNDEVI
ArchitectB SATHYA PRABA

Documents filed15

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number TN/29/Building/0455/2024 on the TNRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
registration certificate-
planning permission approval / renewal letter-
approved plan with local body seal(upload in readable format)-
building permit letter-
encumbrance certificate from the date of approval of planning permission to rera submission date-
carpet area statement-
solid waste disposal (internal arrangement document)-
soil test report (mentioning the site address)-
structural stability certificate along with structural design calculation (indicating site address & no. of fl-
design & drawing for structural stability-
patta / plr / tslr-
construction agreement-
declaration (form b)-
stage of construction & site photographs with date-
allotment letter-

Keep Construction of 32 EWS tenement at Periyapal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mylapore500+ in Chennai

2 kmConstruction of 32 EWS tOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: TNUHDB

TNUHDB has 30 registrations on TNRERA, including Pottalkalam Ph I (Twin Houses) and Kalaignar Nagar Scheme. Read the full track record. See more projects on the Chennai district page.

Frequently asked questions

What are my rights if Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation is delayed beyond 28 Feb 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with TNRERA.

How do I verify and contact the developer of Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation?

The registered promoter entity is TNUHDB, a firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's TNRERA listing and in its filed documents.

Is my payment protected in Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation?

The professionals named in the filing: Engineer: G.KOPPERUNDEVI; Architect: B SATHYA PRABA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on TNRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 32 EWS tenement at Periyapalaiyathamman scheme in within the limit of Greater chennai corporation. Everything on this page comes from what the promoter filed on TNRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 32 EWS tenement at Periyapal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.