ReraGenieLog inGet a buyer report

Home / Browse projects / Kutch, Gujarat / BAGESHREE TOWNSHIP - 9

Valid until 30 Jun 2021 Residential/Group Housing project

BAGESHREE TOWNSHIP - 9

By OM INFRA

RG-GJ-77172 · RERA PR/GJ/KUTCH/GANDHIDHAM/Others/RAA04716/220119 · Last updated on GujRERA portal: 7 May 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Jun 2021Possession promisedno revision filed
13 of 91Construction stages doneacross 13 buildings; furthest along: Internal walls, 90%
Jump to the 48 documents Report an error

BAGESHREE TOWNSHIP - 9 is a Residential/Group Housing project by OM INFRA in Kutch, Gujarat, registered with GujRERA as PR/GJ/KUTCH/GANDHIDHAM/Others/RAA04716/220119 on 22 Jan 2019. Possession is promised by 30 Jun 2021.

At a glance

Project

  • NameBAGESHREE TOWNSHIP - 9
  • TypeResidential/Group Housing
  • Location
    • BAGESHREE TOWNSHIP - 9
    • VILLAGE: GALPADAR
    • TA: GANDHIDHAM
    • Galpadar
    • Gandhidham
    • Kutch
    • 370240
  • Pincode370240
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/KUTCH/GANDHIDHAM/Others/RAA04716/220119
  • ReraGenie IDRG-GJ-77172

Builder

  • NameOM INFRA
  • Entity typePARTNERSHIP FIRM
  • Other registrations11 more →

Key dates

this monthRegisteredJan 2019PromisedJun 2021

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2021
  • Registered on22 Jan 2019
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings13 building records
  • Documents filed48 files

Current status

35.3%Of the estimated cost spent so far

Figures as on 7 May 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type VIII-----1
Type IX-----1
Type X-----1
Type XI-----1
Type XII-----1
Type XIII-----1
Type I-----21
Type II-----1
Type IIII-----324
Type IV-----1
Type V-----1
Type VI-----1
Type VII-----1

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building13

As on 7 May 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 91 construction stages are filed complete across 13 buildings. The stage furthest along is Internal walls, at 90%.

Type VIII70%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type IX0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type X0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type XI0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type XII51%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats50%
Sanitary fittings within the flats30%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing30%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type XIII29%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type I43%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats40%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing20%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type II0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type IIII35%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth70%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats30%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing15%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type IV0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type V70%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing60%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type VI0%
ActivityProgress
Excavation0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats0%
Sanitary fittings within the flats0%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing0%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%
Type VII71%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flats90%
Sanitary fittings within the flats50%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing70%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing0%

Progress on shared amenities19

As on 7 May 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes10%
Water supplyYes0%
Sewerage (chamber, lines, septic tank, STP)Yes0%
Storm water drainsYes0%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingNoNot applicable
Drinking water facilitiesYes0%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,086 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 20.83 cr
Cost incurredRs 7.36 cr
Spent of the estimate35.32%
BuildingWingEstimatedIncurred
Type INARs 1.60 crRs 56.59 lakh
Type IINARs 1.60 crRs 56.59 lakh
Type IIIINARs 1.60 crRs 56.59 lakh
Type IVNARs 1.60 crRs 56.59 lakh
Type VNARs 1.60 crRs 56.59 lakh
Type VINARs 1.60 crRs 56.59 lakh
Type VIINARs 1.60 crRs 56.59 lakh
Type VIIINARs 1.60 crRs 56.59 lakh
Type IXNARs 1.60 crRs 56.59 lakh
Type XNARs 1.60 crRs 56.59 lakh
Type XINARs 1.60 crRs 56.59 lakh
Type XIINARs 1.60 crRs 56.59 lakh

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/KUTCH/GANDHIDHAM/Others/RAA04716/220119 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 May 2019
Engineer's certificate (Form 2)7 May 2019
Site photograph, Type VIII7 May 2019
Site photograph, Type IX7 May 2019
Site photograph, Type X7 May 2019
Site photograph, Type XI7 May 2019
Site photograph, Type XII7 May 2019
Site photograph, Type XIII7 May 2019
Site photograph, Type I7 May 2019
Site photograph, Type II7 May 2019
Site photograph, Type IIII7 May 2019
Site photograph, Type IV7 May 2019
Site photograph, Type V7 May 2019
Site photograph, Type VI7 May 2019
Site photograph, Type VII7 May 2019
RERA registration certificate22 Jan 2019
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Kutch

6%of Kutch projects moved their completion datethis one has not

Computed across the 80 Kutch projects on ReraGenie, from their own filings.

Keep BAGESHREE TOWNSHIP - 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Galpadar80 in Kutch

2 kmBAGESHREE TOWNSHIP - 9Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: OM INFRA

OM INFRA has 12 registrations on GujRERA, including STONEGATE and OM RESIDENCY. Read the full track record. See more projects on the Kutch district page.

Frequently asked questions

What are my rights if BAGESHREE TOWNSHIP - 9 is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of BAGESHREE TOWNSHIP - 9?

The registered promoter entity is OM INFRA, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in BAGESHREE TOWNSHIP - 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in BAGESHREE TOWNSHIP - 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAGESHREE TOWNSHIP - 9. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAGESHREE TOWNSHIP - 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.