Home / Browse projects / Chennai, Tamil Nadu / ANMOL SURABHI
ANMOL SURABHI
By ANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED
RG-TN-86879 · RERA TNRERA/29/BLG/0384/2026
Source: official TNRERA filing
Red flags
- This page reads no complaints, court cases or extensions from this register, so it raises no flags
Clear
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out bookings building by building, the declared costs, the homes block by block, parking and the approvals as filed and places this filing against every project registered within 2 km.
See what the report covers Free either way: .Saved.
ANMOL SURABHI is a Non-High Rise Building (NHRB) project by ANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED in Chennai, Tamil Nadu, registered with TNRERA as TNRERA/29/BLG/0384/2026 on 29 Oct 2026. Possession is promised by 31 Oct 2028.
At a glance
Project
- NameANMOL SURABHI
- TypeNon-High Rise Building (NHRB)
- Location
- THIRUVANMIYUR
- VELACHERY
- Chennai
- 600041
- Pincode600041
- MapView location on Google Maps (as filed on RERA)
- RERA no.TNRERA/29/BLG/0384/2026
- ReraGenie IDRG-TN-86879
Builder
- NameANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED
- Entity typefirm
- Chairman / CEOALOK KUMAR GULECHHA
Key dates
Key facts
Registration and timeline
- StatusValid until 31 Oct 2028
- Registered on29 Oct 2026
- Promised completion31 Oct 2028
- Buildings1 building record
- Documents filed17 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 13 | - | 13 |
The full filing
Everything below is from the project's own TNRERA filing, free to read.
Land and ownership
TNRERA takes the encumbrance details as an uploaded document, listed under Documents filed below; this page does not read inside it. A search at the sub-registrar is what confirms clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | EUGIN SYRIN DHAS |
Documents filed17
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number TNRERA/29/BLG/0384/2026 on the TNRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| registration certificate | - |
| photo | - |
| photo | - |
| photo | - |
| planning permission approval / renewal letter | - |
| approved plan with local body seal(upload in readable format) | - |
| building permit letter | - |
| encumbrance certificate from the date of approval of planning permission to rera submission date | - |
| carpet area statement | - |
| carpet area statement (duly signed by registered architect / promoter with seal) | - |
| structural stability certificate along with structural design calculation (indicating site address & no. of fl | - |
| design & drawing for structural stability | - |
| patta / plr / tslr | - |
| construction agreement | - |
| declaration (form b) | - |
| stage of construction & site photographs with date | - |
| others | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's TNRERA filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Land, construction and total cost as declared, set against the other projects of the district
- The homes block by block in the register's two size bands, with the FSI area, and the commercial space by use
- The parking the promoter filed, covered, open and visitor
- The planning permission and building permit: who issued them, in whose name, the numbers and dates, and the clearances named
- Joined against every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep ANMOL SURABHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THIRUVANMIYUR500+ in Chennai
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
ISHA'S GEETHANJALI
Isha Homes (India) Private Limited
S&S CENTRIS
M/s. S & S Foundations Pvt Ltd
BLUEMOON SEA BREEZE
BLUEMOON PROPERTIES
Pushkar Serenity
MR P KRUTHIVAS GPA, PARTNER M/S. BRINDAVAN
ALDA AYAN
THULA VENTURES PRIVATE LIMITED
NAHAR EAST
Nahar Foundation's Private Limited
See every Chennai project, with the district possession charts
Builder: ANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED
ANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED has 1 registration on TNRERA, including ANMOL SURABHI. Read the full track record. See more projects on the Chennai district page.
Frequently asked questions
What are my rights if ANMOL SURABHI is delayed beyond 31 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with TNRERA.
How do I verify and contact the developer of ANMOL SURABHI?
The registered promoter entity is ANMOL SHRUSTI CONTRACTORS AND ENGINEERS PRIVATE LIMITED, a firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's TNRERA listing and in its filed documents.
Is my payment protected in ANMOL SURABHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at ANMOL SURABHI?
The professionals named in the filing: Engineer: EUGIN SYRIN DHAS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANMOL SURABHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on TNRERA, and we read every report.
Report an error Share feedback