Ananat Heights

By ANANAT BUILDSPACE LLP

RG-GJ-82984 · RERA PR/GJ/RAJKOT/RAJKOT/Others/MAA11961/160623 · Last updated on GujRERA portal: 4 Oct 2024

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Jul 2027Possession promisedno revision filed
12 of 20Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 98%
26 of 164Units unsoldnot recorded sold or booked
Jump to the 36 documents Report an error

Ananat Heights is a Mixed Development project by ANANAT BUILDSPACE LLP in Rajkot, Gujarat, registered with GujRERA as PR/GJ/RAJKOT/RAJKOT/Others/MAA11961/160623 on 16 Jun 2023. Possession is promised by 31 Jul 2027. 138 of the 164 units on this registration are recorded sold or booked, and 12 of 20 construction stages are filed complete.

At a glance

Project

  • NameAnanat Heights
  • TypeMixed Development
  • Location
    • ANANAT BUILDSPACE LLP
    • Office No-403
    • Anant The Work Space
    • Kalawad Main Road
    • Opp. HDFC Bank
    • Rajkot
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/RAJKOT/RAJKOT/Others/MAA11961/160623
  • ReraGenie IDRG-GJ-82984

Builder

  • NameANANAT BUILDSPACE LLP
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredJun 2023PromisedJul 2027

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2027
  • Registered on16 Jun 2023
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed36 files

Current status

84%138 of 164 units booked
91.7%Of the estimated cost spent so far

Figures as on 4 Oct 2024, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---56056
B+C---7830108

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building2

As on 4 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 98%.

A94%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor98%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats98%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing98%
B+C93%
ActivityProgress
Excavation100%
Podiums (if any)100%
Plinth100%
Stilt Floor93%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats93%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing50%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing93%

Progress on shared amenities23

As on 4 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes75%
Water supplyYes75%
Sewerage (chamber, lines, septic tank, STP)Yes75%
Storm water drainsYes75%
Landscaping and tree plantingYes75%
Street lightingYes75%
Community buildingsYes0%
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Fire fightingYes0%
Drinking water facilitiesYes0%
Emergency evacuationYes0%
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxYes0%
Compound wallYes75%
Plinth protectionYes75%
Water tankYes75%
Other requirementsYes75%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,208 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 21.80 cr
Cost incurredRs 19.99 cr
Spent of the estimate91.7%
BuildingWingEstimatedIncurred
B+CNARs 13.82 crRs 12.68 cr
ANARs 7.98 crRs 7.31 cr

Documents filed36

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/RAJKOT/RAJKOT/Others/MAA11961/160623 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)4 Oct 2024
Engineer's certificate annexure4 Oct 2024
RERA registration certificate16 Jun 2023
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Rajkot

84%of this project is bookeddistrict median 56%
13%of Rajkot projects moved their completion datethis one has not

Computed across the 1,800+ Rajkot projects on ReraGenie, from their own filings.

Keep Ananat Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Rajkot1,800+ in Rajkot

2 kmAnanat HeightsOther 323Dot size: filed unitsN

Filed coordinates, straight-line distance. 323 registered projects within 2 km.

Builder: ANANAT BUILDSPACE LLP

ANANAT BUILDSPACE LLP has 1 registration on GujRERA, including Ananat Heights. Read the full track record. See more projects on the Rajkot district page.

Frequently asked questions

What are my rights if Ananat Heights is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Ananat Heights?

The registered promoter entity is ANANAT BUILDSPACE LLP, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Ananat Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Ananat Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ananat Heights. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ananat Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.