ReraGenieLog inGet a buyer report

Home / Browse projects / Banaskantha, Gujarat / ADVAIT BY AKSHATAM

Valid until 30 Apr 2028 Residential/Group Housing project

ADVAIT BY AKSHATAM

By AMI INFRABUILD LLP

RG-GJ-09689 · RERA PR/GJ/BANASKANTHA/PALANPUR/Others/RAA11301/020323 · Last updated on GujRERA portal: 16 Sep 2026

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Apr 2028Possession promisedno revision filed
64 of 72Construction stages doneacross 8 buildings; furthest along: Stilt Floor, 0%
8 of 24Units unsoldnot recorded sold or booked
Jump to the 48 documents Report an error

ADVAIT BY AKSHATAM is a Residential/Group Housing project by AMI INFRABUILD LLP in Banaskantha, Gujarat, registered with GujRERA as PR/GJ/BANASKANTHA/PALANPUR/Others/RAA11301/020323 on 2 Mar 2023. Possession is promised by 30 Apr 2028. 16 of the 24 units on this registration are recorded sold or booked, and 64 of 72 construction stages are filed complete.

At a glance

Project

  • NameADVAIT BY AKSHATAM
  • TypeResidential/Group Housing
  • Location
    • Agola Road
    • Palanpur
    • Palanpur
    • Banaskantha
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/BANASKANTHA/PALANPUR/Others/RAA11301/020323
  • ReraGenie IDRG-GJ-09689

Builder

  • NameAMI INFRABUILD LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM
  • Other registrations3 more →

Key dates

this monthRegisteredMar 2023PromisedApr 2028

Key facts

Registration and timeline

  • StatusValid until 30 Apr 2028
  • Registered on2 Mar 2023
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings8 building records
  • Documents filed48 files

Current status

67%16 of 24 units booked
100.0%Of the estimated cost spent so far

Figures as on 16 Sep 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D---101
E---101
F---909
G---404
H---101
A---606
B---101
C---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building8

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

64 of 72 construction stages are filed complete across 8 buildings. The stage furthest along is Stilt Floor, at 0%.

D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
E89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
F89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
G89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
H89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
A89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
B89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)NoNot applicable
Storm water drainsNoNot applicable
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Fire fightingNoNot applicable
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes100%
Letter boxYes100%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,540 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 16.12 cr
Cost incurredRs 16.12 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
FNARs 5.60 crRs 5.60 cr
ANARs 3.93 crRs 3.93 cr
GNARs 2.23 crRs 2.23 cr
ENARs 1.45 crRs 1.45 cr
CNARs 83.55 lakhRs 83.55 lakh
BNARs 72.55 lakhRs 72.55 lakh
HNARs 70.15 lakhRs 70.15 lakh
DNARs 63.50 lakhRs 63.50 lakh

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManish Doshi
EngineerNiket P Tank

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/BANASKANTHA/PALANPUR/Others/RAA11301/020323 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)16 Sep 2026
Engineer's certificate (Form 2)12 Sep 2026
Engineer's certificate annexure12 Sep 2026
Architect's certificate (Form 1)11 Sep 2026
Site photograph, D11 Sep 2026
Site photograph, E11 Sep 2026
Site photograph, F11 Sep 2026
Site photograph, G11 Sep 2026
Site photograph, H11 Sep 2026
Site photograph, A11 Sep 2026
Site photograph, B11 Sep 2026
Site photograph, C11 Sep 2026
RERA registration certificate2 Mar 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Banaskantha

67%of this project is bookeddistrict median 40%
13%of Banaskantha projects moved their completion datethis one has not

Computed across the 93 Banaskantha projects on ReraGenie, from their own filings.

Keep ADVAIT BY AKSHATAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Banaskantha93 in Banaskantha

2 kmADVAIT BY AKSHATAMOther 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: AMI INFRABUILD LLP

AMI INFRABUILD LLP has 4 registrations on GujRERA, including Akshatam - 6 and ADVAIT BY AKSHATAM. Read the full track record. See more projects on the Banaskantha district page.

Frequently asked questions

What are my rights if ADVAIT BY AKSHATAM is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of ADVAIT BY AKSHATAM?

The registered promoter entity is AMI INFRABUILD LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in ADVAIT BY AKSHATAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ADVAIT BY AKSHATAM?

The professionals named in the filing: Architect: Manish Doshi; Engineer: Niket P Tank. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADVAIT BY AKSHATAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADVAIT BY AKSHATAM. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADVAIT BY AKSHATAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.