ReraGenieLog inGet a buyer report

Home / Browse projects / Kutch, Gujarat / Aditya Villa

Valid until 31 Mar 2019 Plotted Development project

Aditya Villa

By NATWARLAL SHETH

RG-GJ-29905 · RERA PR/GJ/KUTCH/ANJAR/Others/PAA04337/121218 · Last updated on GujRERA portal: 28 May 2019

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Mar 2019Possession promisedno revision filed
78 of 78Units unsoldnot recorded sold or booked
Jump to the 114 documents Report an error

Aditya Villa is a Plotted Development project by NATWARLAL SHETH in Kutch, Gujarat, registered with GujRERA as PR/GJ/KUTCH/ANJAR/Others/PAA04337/121218 on 12 Dec 2018. Possession is promised by 31 Mar 2019. 0 of the 78 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAditya Villa
  • TypePlotted Development
  • Location
    • Anjar saher R.s.no. 5/3
    • vidi road
    • Anjar
    • Anjar (kutch) 370110
    • Anjar
    • Kutch
    • 370110
  • Pincode370110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/KUTCH/ANJAR/Others/PAA04337/121218
  • ReraGenie IDRG-GJ-29905

Builder

  • NameNATWARLAL SHETH
  • Entity typeIndividual/Propritorship

Key dates

this monthRegisteredDec 2018PromisedMar 2019

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2019
  • Registered on12 Dec 2018
  • Promised completion31 Mar 2019
  • Revised completionNone
  • Buildings78 building records
  • Documents filed114 files

Current status

0%0 of 78 units booked
91.4%Of the estimated cost spent so far

Figures as on 28 May 2019, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R25---101
R26---101
R27---101
R28---101
R29---101
R30---101
R31---101
R32---101
R33---101
R34---101
R35---101
R36---101
R37---101
R38---101
R39---101
R40---101
R41---101
R42---101
R43---101
R44---101
R45---101
R46---101
R47---101
R48---101
R49---101
R50---101
R51---101
R52---101
R53---101
R54---101
R55---101
R56---101
R57---101
R58---101
R59---101
R60---101
R61---101
R62---101
R63---101
R64---101
R65---101
R66---101
R67---101
R68---101
R69---101
R70---101
C1---101
C2---101
C3---101
C4---101
C5---101
C6---101
C7---101
C8---101
R1---101
R2---101
R3---101
R4---101
R5---101
R6---101
R7---101
R8---101
R9---101
R10---101
R11---101
R12---101
R13---101
R14---101
R15---101
R16---101
R17---101
R18---101
R19---101
R20---101
R21---101
R22---101
R23---101
R24---101

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building20

As on 28 May 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 78 buildings; the table lists the first 20.

R25Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R26Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R27Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R28Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R29Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R30Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R31Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R32Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R33Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R34Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R35Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R36Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R37Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R38Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R39Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R40Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R41Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R42Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R43Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable
R44Not stated
ActivityProgress
ExcavationNot applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, internal plaster, floorings, doors and windows within flatsNot applicable
Sanitary fittings within the flatsNot applicable
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofingNot applicable
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishingNot applicable

Progress on shared amenities19

As on 28 May 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes95%
Water supplyYes98%
Sewerage (chamber, lines, septic tank, STP)Yes99%
Storm water drainsNoNot applicable
Landscaping and tree plantingYes95%
Street lightingYes95%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterYes95%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes90%
Energy managementYes95%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes99%
Fire fightingNoNot applicable
Drinking water facilitiesYes99%
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes70%
Letter boxYes99%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,140 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 24.00 lakh
Cost incurredRs 21.93 lakh
Spent of the estimate91.37%
BuildingWingEstimatedIncurred
R1NARs 30,769Rs 28,114
R2NARs 30,769Rs 28,114
R3NARs 30,769Rs 28,114
R4NARs 30,769Rs 28,114
R5NARs 30,769Rs 28,114
R6NARs 30,769Rs 28,114
R7NARs 30,769Rs 28,114
R8NARs 30,769Rs 28,114
R9NARs 30,769Rs 28,114
R10NARs 30,769Rs 28,114
R11NARs 30,769Rs 28,114
R12NARs 30,769Rs 28,114

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSamved Chaudhary
EngineerMaulik M Kotak

Documents filed114

As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PR/GJ/KUTCH/ANJAR/Others/PAA04337/121218 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)28 May 2019
Engineer's certificate (Form 2)28 May 2019
Accountant's certificate (Form 3)28 May 2019
Site photograph, R2528 May 2019
Site photograph, R2628 May 2019
Site photograph, R2728 May 2019
Site photograph, R2828 May 2019
Site photograph, R2928 May 2019
Site photograph, R3028 May 2019
Site photograph, R3128 May 2019
Site photograph, R3228 May 2019
Site photograph, R3328 May 2019
Site photograph, R3428 May 2019
Site photograph, R3528 May 2019
Site photograph, R3628 May 2019
Site photograph, R3728 May 2019
Site photograph, R3828 May 2019
Site photograph, R3928 May 2019
Site photograph, R4028 May 2019
Site photograph, R4128 May 2019
Site photograph, R4228 May 2019
Site photograph, R4328 May 2019
Site photograph, R4428 May 2019
Site photograph, R4528 May 2019
Site photograph, R4628 May 2019
Site photograph, R4728 May 2019
Site photograph, R4828 May 2019
Site photograph, R4928 May 2019
Site photograph, R5028 May 2019
Site photograph, R5128 May 2019
Site photograph, R5228 May 2019
Site photograph, R5328 May 2019
Site photograph, R5428 May 2019
Site photograph, R5528 May 2019
Site photograph, R5628 May 2019
Site photograph, R5728 May 2019
Site photograph, R5828 May 2019
Site photograph, R5928 May 2019
Site photograph, R6028 May 2019
Site photograph, R6128 May 2019
Site photograph, R6228 May 2019
Site photograph, R6328 May 2019
Site photograph, R6428 May 2019
Site photograph, R6528 May 2019
Site photograph, R6628 May 2019
Site photograph, R6728 May 2019
Site photograph, R6828 May 2019
Site photograph, R6928 May 2019
Site photograph, R7028 May 2019
Site photograph, C128 May 2019
Site photograph, C228 May 2019
Site photograph, C328 May 2019
Site photograph, C428 May 2019
Site photograph, C528 May 2019
Site photograph, C628 May 2019
Site photograph, C728 May 2019
Site photograph, C828 May 2019
Site photograph, R128 May 2019
Site photograph, R228 May 2019
Site photograph, R328 May 2019
Site photograph, R428 May 2019
Site photograph, R528 May 2019
Site photograph, R628 May 2019
Site photograph, R728 May 2019
Site photograph, R828 May 2019
Site photograph, R928 May 2019
Site photograph, R1028 May 2019
Site photograph, R1128 May 2019
Site photograph, R1228 May 2019
Site photograph, R1328 May 2019
Site photograph, R1428 May 2019
Site photograph, R1528 May 2019
Site photograph, R1628 May 2019
Site photograph, R1728 May 2019
Site photograph, R1828 May 2019
Site photograph, R1928 May 2019
Site photograph, R2028 May 2019
Site photograph, R2128 May 2019
Site photograph, R2228 May 2019
Site photograph, R2328 May 2019

How this compares with Kutch

0%of this project is bookeddistrict median 42%
6%of Kutch projects moved their completion datethis one has not

Computed across the 80 Kutch projects on ReraGenie, from their own filings.

Keep Aditya Villa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Anjar80 in Kutch

2 kmAditya VillaOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: NATWARLAL SHETH

NATWARLAL SHETH has 1 registration on GujRERA, including Aditya Villa. Read the full track record. See more projects on the Kutch district page.

Frequently asked questions

What are my rights if Aditya Villa is delayed beyond 31 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Aditya Villa?

The registered promoter entity is NATWARLAL SHETH, an individual/propritorship as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Aditya Villa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Aditya Villa?

The professionals named in the filing: Architect: Samved Chaudhary; Engineer: Maulik M Kotak. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aditya Villa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aditya Villa. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aditya Villa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.