New projects and RERA data in Jaipur district, Rajasthan

2424 projects are registered in Jaipur district, 339 registered in the last 12 months.

2,424Projects covered
339Registered, last 12 months
458Completion dates revised

Of the 2424 covered registrations, 458 have revised their promised completion date. Every figure comes from the projects' own RERA Rajasthan filings.

When Jaipur projects promise possession

Promised possession year as filed by the builder with RERA Rajasthan, split by what the registration says today. Of 2,402 projects with a promised date, 1,173 are recorded delivered, 759 are still on the register and 470 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0125250375500today2017: 3 projects, delivered2017: 4 projects, registration lapsed or cancelled’172018: 28 projects, delivered2018: 17 projects, registration lapsed or cancelled’182019: 48 projects, delivered2019: 15 projects, registration lapsed or cancelled’192020: 32 projects, delivered2020: 30 projects, registration lapsed or cancelled’202021: 55 projects, delivered2021: 43 projects, registration lapsed or cancelled’212022: 92 projects, delivered2022: 53 projects, registration lapsed or cancelled’222023: 128 projects, delivered2023: 84 projects, registration lapsed or cancelled’232024: 184 projects, delivered2024: 79 projects, registration lapsed or cancelled’242025: 224 projects, delivered2025: 90 projects, registration lapsed or cancelled’252026: 156 projects, delivered2026: 14 projects, on the register2026: 47 projects, registration lapsed or cancelled’262027: 162 projects, delivered2027: 307 projects, on the register2027: 2 projects, registration lapsed or cancelled’272028: 51 projects, delivered2028: 166 projects, on the register2028: 3 projects, registration lapsed or cancelled’282029: 8 projects, delivered2029: 109 projects, on the register2029: 1 projects, registration lapsed or cancelled’292030: 1 projects, delivered2030: 97 projects, on the register2030: 1 projects, registration lapsed or cancelled’302031: 1 projects, delivered2031: 38 projects, on the register’312032: 16 projects, on the register’322033: 10 projects, on the register’332034: 2 projects, on the register2034: 1 projects, registration lapsed or cancelled’34

1,193 projects promise possession in 2026 or later. Facts as per filings on RERA website.

How far Jaipur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 458 of 460 projects (100%) have moved at least once; the median move is 16 months and the longest is 121 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 2 projects moved by under 2 years, 50% of the yearOriginally due 2017: 2 projects moved by 2 years or more, 50% of the year’17Originally due 2018: 20 projects moved by under 2 years, 67% of the yearOriginally due 2018: 10 projects moved by 2 years or more, 33% of the year’18Originally due 2019: 20 projects moved by under 2 years, 38% of the yearOriginally due 2019: 32 projects moved by 2 years or more, 62% of the year’19Originally due 2020: 32 projects moved by under 2 years, 49% of the yearOriginally due 2020: 33 projects moved by 2 years or more, 51% of the year’20Originally due 2021: 36 projects moved by under 2 years, 54% of the yearOriginally due 2021: 31 projects moved by 2 years or more, 46% of the year’21Originally due 2022: 34 projects moved by under 2 years, 64% of the yearOriginally due 2022: 19 projects moved by 2 years or more, 36% of the year’22Originally due 2023: 29 projects moved by under 2 years, 78% of the yearOriginally due 2023: 8 projects moved by 2 years or more, 22% of the year’23Originally due 2024: 34 projects moved by under 2 years, 77% of the yearOriginally due 2024: 10 projects moved by 2 years or more, 23% of the year’24Originally due 2025: 1 projects kept the original date, 2% of the yearOriginally due 2025: 56 projects moved by under 2 years, 93% of the yearOriginally due 2025: 3 projects moved by 2 years or more, 5% of the year’25Originally due 2026: 1 projects kept the original date, 2% of the yearOriginally due 2026: 44 projects moved by under 2 years, 98% of the year’26Originally due 2027: 2 projects moved by under 2 years, 100% of the year’27Originally due 2029: 1 projects moved by under 2 years, 100% of the year’29

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Projects in Jaipur

See these projects another way: newest registrations firstmost booked firstsearch and filter by builder

Showing 1 to 60 of 2,424 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
"GOVERDHAN VATIKA"Khasra No./ Plot No.1488/193, 1490/172, 1492/173, 1502/187, 182, 188, 1555/155, 1547/1489, 1549/1491, 1501/187, 253, 1553/255, 1544/154, 150, 1551/171 , Village- Mahasinghpura Urf Kapurawala , , Jaipur - 302029 (Rajasthan)Bordiya Balaji Builders And Developers Private Limited--21 Nov 2024Completed
"LANDMARK"Khasra No./ Plot No.Khasra No. 263,266,1064/264,1066/265,1068/267,1069/258,1071/259 and 1073/262 at Revenue Village Bagru Khurd Teh. Sanganer, Jaipur , Village- Bagaru Khurd , Near Ajmer Road in front of kala goura Bahru mandir , Jaipur - 303007 (Rajasthan)Badrinath Infraprojects Pvt Ltd--23 May 2025Completed
"ROYAL AANGAN BLOCK-A EXT."Khasra No./ Plot No.97 , Village- Harbanshpura , Jaisinghpura Ajmer Road , Jaipur - 302026 (Rajasthan)Gokul Kripa Colonizers And Developers Pvt. Ltd.--6 Nov 2018Completed
"THE ELEGANCE"Khasra No./ Plot No.386, 387, 388, 389, 390, 396, 397, 710/458, 712/459, 462 , Village- SITARAMPURA , , Jaipur - 302029 (Rajasthan)New Path Developers LLP--10 Oct 2024Completed
''PLATINUM GREENS''Khasra No./ Plot No.66 to 70, 251, 2349/261, 2348/249, 268, 96, 100, 102 to 104, 86, 87, 88, 90, 91, 92, 93, 94, 95, 222, 223, 224, 225, 227, 228, 229, 230, 231, 232, 234, 262, 263, 325, 327, 328, 329, 331, 332, 336 to 352, 451, 453, 454, 455, 467, 468, 469, 471, 472, 475, 476, 442, 447, 449, 450, 461, 462, 463, 448, 452, 456, 459, 460 , Village- MAHALA , , Jaipur - 303009 (Rajasthan)Riyasat Infra Developers Private Limited--29 Nov 2024Completed
14 WOODLAND PARKKhasra No./ Plot No.14-R-1, Shipra Path, Mansarovar , Village- Jaipur , Shipra Path, Mansarovar , Jaipur - 302020 (Rajasthan)Woodland Park Buildcon LLP--28 Apr 2021Completed, occupancy certificate issued
24 CARATKhasra No./ Plot No.Plot No. 06 and 07 , Village- Jaipur , Xaviers Arcade-1 , Jaipur - 302017 (Rajasthan)Sankalp Infra Homes--8 Jan 2023Registration lapsed
4th AVENUEKhasra No./ Plot No.4-R-B(CORNER), SECTOR-4, VIDHYADHAR NAGAR, JAIPUR , Village- JAIPUR , VIDHYADHAR NAGAR , Jaipur - 302039 (Rajasthan)Earth India Finlease Limited--15 Feb 2022Registration lapsed
551 ROHINI NAGAR-IKhasra No./ Plot No.551 , ROHINI NAGAR-I , Jaipur - 302022 (Rajasthan)Janak Nandini Realtors Private Limited--17 Nov 2017Registration lapsed
5th AvenueKhasra No./ Plot No.D-23-A , Prithviraj Road, C-Scheme , Jaipur - 302001 (Rajasthan)Upasana Colonisers and Resorts Private Limited--11 Sep 2017Registration lapsed
75°E HOMESKhasra No./ Plot No.536, 537, 538, 550, 551 , Village- Jaipur , Nirman Nagar A&B , Jaipur - 302019 (Rajasthan)Bagai Buildcon LLP--9 Sep 2024Registered, in progress
AADI RESIDENCYKhasra No./ Plot No.Khasra No. 355/325, 356/276, 357/276, 363/348, 361/314, 359/275 , Village- Jaichand Ka Bas , Jaichand Ka Bas , Jaipur - 303006 (Rajasthan)Vardaan Buildestate LLP--24 Jun 2026Registered, in progress
Aadrash ViharKhasra No./ Plot No.449 , Village- Hathoj , Kalwar , Jaipur - 302004 (Rajasthan)Laxmi Narayan Yadav--17 Feb 2025Registration suspended
AAGMANKhasra No./ Plot No.PLOT NO. H-2, CHITRANJAN MARG, C-SCHEME, YOJNA JAIPUR HERITAGE , Village- JAIPUR , C-SCHEME , Jaipur - 302001 (Rajasthan)Ganeshgarh Reality Private Limited--5 Feb 2026Registered, in progress
Aahvan Phase - IKhasra No./ Plot No.G-8 (Group Housing) and Niji Khatedari Khasra No. 938 to 940 & 946 , Village- Sirsi , Sirsi Road Jaipur , Jaipur - 302012 (Rajasthan)Espiring Buildtech Developers LLP--17 Feb 2025Registered, in progress
AAKARKhasra No./ Plot No.502, 502/1, 503, 503/1, 504, 505/1, 516/1, 517, 518, 518/1, 519, 520, 521/2, 522/2 , Village- Shree Kishanpura, Sector- 30 , , Jaipur - 303905 (Rajasthan)Blue Print Developers LLP--2 Jul 2025Registered, in progress
AAMODKhasra No./ Plot No.KHASRA NO.157 , Village- DABLA BUJURG , DIGGI ROAD , Jaipur - 302001 (Rajasthan)Goldendunes Builders And Developers Pvt Ltd--24 Oct 2017Registration lapsed
AAMOD-IIKhasra No./ Plot No.KHASRA NO. 158/3 , Village- DABLA BUJURG , THEH:PHAGI , Jaipur - 302001 (Rajasthan)Goldendunes Heights LLP--10 May 2019Registration lapsed
AAMORKhasra No./ Plot No.Khasra No. 210,211 , Village- Ramsinghpura , Ramsinghpura Urf Rampura , Jaipur - 302029 (Rajasthan)Aashish Infraprojects LLP--9 Apr 2018Completed
AANANDAMKhasra No./ Plot No.178/1 , Village- GANPATPURA , , Jaipur - 302020 (Rajasthan)Vanshdeep Builders Proprietorpradeepkumartolani--14 Aug 2021Completed
AANANT AVENUEKhasra No./ Plot No.240, 241, 242, 232 , Village- HARMADA , SHAKTI SADAN, VILLAGE - HARMADA, TEHSIL AMER , Jaipur - 302013 (Rajasthan)Shreeram Greenheights Private Limited--16 Nov 2026Registered, in progress
AANCHAL RESIDENCYKhasra No./ Plot No.274/1221 , Gram Sinwar Sirsi Bindayaka Road , Jaipur - 302012 (Rajasthan)Siddhi Vinayak Affordable Dreamhome Pvt Ltd--10 Jun 2021Registration revoked
Aangan ArcadeKhasra No./ Plot No.D-3324 / 05.11.2015 , Village- Thikariya & Bagru Khurd , Bagru Khurd Link Road, Ajmer Road , Jaipur - 302026 (Rajasthan)Siddha Infra Projects Private Limited--15 Sep 2017Registration lapsed
Aaradhya GovindKhasra No./ Plot No.265-266 , Village- Jaipur , Kanak Vihar, Scheme No. 2 , Jaipur - 302021 (Rajasthan)S N Builders and Developers--6 Feb 2024Registration lapsed
AARAMBHKhasra No./ Plot No.PLOT NO. B-65 , Village- JAIPUR , SCHEME BAPU NAGAR , Jaipur - 302015 (Rajasthan)Ganpati Bharat Private Limited--10 Oct 2023Completed
AAROHANKhasra No./ Plot No.Plot No. 04 , Village- C-Scheme , Sardar Patel Marg , Jaipur - 302001 (Rajasthan)Urban View Developers LLP--21 Nov 2023Registered, in progress
Aarohi DreamsKhasra No./ Plot No.Plot No. 14, 15, 16, 68, 69 , Village- Manipur Deori urf Goliyawas , Mahaveer Nagar , Jaipur - 302018 (Rajasthan)Aarohi Dreams--19 May 2022Completed
AAROHI HOMESKhasra No./ Plot No.Plot No. 177, 178 , Village- Kalyanpura , PATEL NAGAR , Jaipur - 302033 (Rajasthan)Aarohi Homes--27 Jul 2022Registration lapsed
aaRVI HEIGHTSKhasra No./ Plot No.SB-163, GANDHI NAGAR SCHEME, BAPU NAGAR, JAIPUR , Village- JAIPUR , BAPU NAGAR , Jaipur - 302015 (Rajasthan)Renaissance Buildhome Pvt Ltd.--9 Dec 2021Completed
AASHIYANAKhasra No./ Plot No.PLOT NO. G.H.8 , Village- JAIPUR , GOKUL NAGAR SCHEME, GOKULPURA, JHOTWARA , Jaipur - 302012 (Rajasthan)Shivvilas Realhome Private Limited--22 Oct 2022Completed
AASRAKhasra No./ Plot No.7/448, 9, 10, 11, 25, 28 , AJMER ROAD, NEAR MAHINDRA SEZ , Jaipur - 302026 (Rajasthan)Samanvay Buildhome--19 Sep 2017Registration lapsed
Aastha ClassiqueKhasra No./ Plot No.234/388,235/387 , Tonk Road , Jaipur - 303903 (Rajasthan)Aastha Buildhome Developers Pvt Ltd--24 Oct 2017Registration lapsed
AASTHA HOMESKhasra No./ Plot No.Khasra No. 2295/2251 , Village- Sirsi , , Jaipur - 302012 (Rajasthan)Seema Yadav--15 Oct 2022Completed
AASTHA RESIDENCYKhasra No./ Plot No.264 , Village- NANAKPURA , SANGANER , Jaipur - 303903 (Rajasthan)Aastha Buildhome Developers Pvt Ltd--24 Oct 2017Registration lapsed
AASTHA UMMEDRAJ LUXESKhasra No./ Plot No.B-79 , MOTI DUNGARI SCHEME, TILAK NAGAR , Jaipur - 302004 (Rajasthan)Sumit Bohra--9 Jan 2019Registration lapsed
AavranKhasra No./ Plot No.402,403/1,404 , Village- Vimalpura , , Jaipur - 302017 (Rajasthan)Elidomes Developers LLP--1 Mar 2025Completed
Aavya HomesKhasra No./ Plot No.533 , Village Bindayaka , Jaipur - 302012 (Rajasthan)Navriti Project LLP--6 Oct 2017Registration lapsed
AAYAMKhasra No./ Plot No.281,282,305,308 & 309 , Village- Bilwa Kalan , Sanganer , Jaipur - 302022 (Rajasthan)Sheer Developers LLP--22 Aug 2019Completed
AAYAM Phase-IIKhasra No./ Plot No.281,282,305,308 & 309 , Village- Bilwa Kalan , , Jaipur - 302022 (Rajasthan)Sheer Developers LLP--8 Aug 2025Registered, in progress
AB ICONICKhasra No./ Plot No.PLOT NO 209,210,219 AND 220 , Village- NARSINGHPURA URF RIKSHA , , Jaipur - 302025 (Rajasthan)Agarwal Buildcon--28 Jan 2023Registration lapsed
AB PRIME HEIGHTKhasra No./ Plot No.Plot No 12, 13 & 14 , Village- Jaipur , Bajrang Deep-1 (Niji Khatedar), , Jaipur - 302025 (Rajasthan)Sunil Kumar Agarwal HUF--25 May 2021Registration lapsed
ABC ICONICKhasra No./ Plot No.Plot No. 51, 52, 53 , Village- Jaipur , GYAN VIHAR, AJMER ROAD , Jaipur - 302019 (Rajasthan)Nalanda Builtcon Pvt Ltd--18 Jun 2021Completed
ABHIMANYU RESIDENCYKhasra No./ Plot No.642/623 , Village- MANDAU , SANGANER , Jaipur - 302029 (Rajasthan)Gokulkripa Buildtech Private Limited--26 Nov 2020Completed
ABHIMANYU RESIDENCY BLOCK-AKhasra No./ Plot No.640/622 , Village- MANDAU , TEHSIL SANGANER , Jaipur - 302029 (Rajasthan)Kisaan Prime Estate Private Limited--26 Nov 2020Completed
ABHIMANYU RESIDENCY BLOCK-BKhasra No./ Plot No.641/622, 624/1 , Village- VILLAGE MANDAU , TEHSIL SANGANER, JAIPUR , Jaipur - 302029 (Rajasthan)Happy Realearth LLP--13 Jan 2021Completed
ABHINANDAN INDUSTRIAL PARKKhasra No./ Plot No.Khasra No. 531, 532, 535 to 538 & 831/539 and Khasra No. 2587/2071, 2072, 2620/2589, 2074, 2622/2591, 2616/2076, 2077 to 2079, 2618/2080, 2083, 2086, 2087 & 2593/2088 , Village- Village- Bagru Rawan, Tehsil-Sanganer and Village- Mahla , . , Jaipur - 303009 (Rajasthan)Abhinandan Infra Developers--2 Jun 2026Registered, in progress
ABHINANDAN INDUSTRIAL PARK - A PHASE-IKhasra No./ Plot No.Khasra No. 994, 1933, 1939, 1941 ΤΟ 1956, 2059 ΤΟ 2070, 2588/2071, 2590/2073, 2592/2075 and 2594/2088 , Village- Mahla , . , Jaipur - 303009 (Rajasthan)Govind Infra Developers--10 Feb 2026Registered, in progress
ABHINANDAN INDUSTRIAL PARK - A PHASE-IIKhasra No./ Plot No.Part of Khasra No. 994, 1933, 1939, 1941 ΤΟ 1956, 2059 ΤΟ 2070, 2588/2071, 2590/2073, 2592/2075 and 2594/2088 , Village- Mahla , . , Jaipur - 303009 (Rajasthan)Roshan Colonisers Private Limited--4 Feb 2026Registered, in progress
ABM RESIDENCYKhasra No./ Plot No.A-94, A-101, NARAYANPURI-A, BISHNAWALA, JAIPUR - 303301 , Village- BSIHANWALA , NARAYANPURI-A , Jaipur - 303301 (Rajasthan)Abm Infra--17 Aug 2021Registration lapsed
ACHYUTAMKhasra No./ Plot No.Plot No. 18, 18A, 19, 19A, 20, 20A, 26, 26A, 27, 27A, 28, 29 , Village- Jaipur , Scheme-Aanand Regency-A , Jaipur - 302029 (Rajasthan)Shriratnam Builders--12 Oct 2022Registration lapsed
ACROPOLISKhasra No./ Plot No.Khasra No. 36/5 , Village- Mandau , , Jaipur - 302029 (Rajasthan)Mgb Prime Estates LLP--25 Nov 2024Registered, in progress
AD Industrial AreaKhasra No./ Plot No.Khasra No. 269/252 , Village- Revenue Village-Khejdavas , Revenue Village-Khejdavas , Jaipur - 303904 (Rajasthan)Ad Infrastructures--25 May 2026Registered, in progress
Adapt OneKhasra No./ Plot No.Plot no. 78/13B (7 R-1) , Village- Jaipur , Shipra Path, Mansarovar , Jaipur - 302020 (Rajasthan)Adapt Buildtech LLP--6 Sep 2026Registered, in progress
ADARSH NAGARKhasra No./ Plot No.Khasra No. 360/2, 369/2, 375/2, 611/359 & 595/360 , Village- Nimeda , , Jaipur - 302012 (Rajasthan)Org Projects LLP--9 Nov 2022Completed
Adarsh Nagar OneKhasra No./ Plot No.Khasra No. 671/293, 674/290 , Village- Nimeda , Village - Nimeda, Tehsil Kalwar , Jaipur - 302012 (Rajasthan)Org Projects LLP--25 Jul 2025Registered, in progress
Adarsh Nagar PrimeKhasra No./ Plot No.Khasra No 648/357, 650/360, 654/651,655/651, 656/651, 661/652 , Village- Nimeda , , Jaipur - 302012 (Rajasthan)Org Projects LLP--7 Mar 2024Completed
Adhiraj ResidencyKhasra No./ Plot No.199 and 200 , Village- Manpur Teelawala , Sanganer , Jaipur - 303904 (Rajasthan)Mahendra Kumar Sharma--23 Dec 2025Registered, in progress
Adinath EnclaveKhasra No./ Plot No.480, 481, 482, 483, 484/1 , Village- Budhsinghpura , Budhsinghpura , Jaipur - 303902 (Rajasthan)Shree Ram Greenvalley Developers Limited Liability Partnership--10 Feb 2020Completed
ADITI VILLAKhasra No./ Plot No.166,167,168,169,398/163 , Village- RAMNAGARIYA , , Jaipur - 302017 (Rajasthan)Nandkishore Sharma--28 Aug 2021Registration lapsed
ADITYA CITYKhasra No./ Plot No.927, 928, 893/1, 894, 895 , Village- BILWA , , Jaipur - 302022 (Rajasthan)Art Age Private Limited--26 Nov 2022Completed

Developers active in Jaipur

RAJASTHAN HOUSING BOARD (57), JAIPUR DEVELOPMENT AUTHORITY (54), RIYASAT INFRA DEVELOPERS PRIVATE LIMITED (30), GOKUL KRIPA COLONIZERS AND DEVELOPERS PVT. LTD. (24), Ashiana Housing Limited (24), VRB DREAM HOMES PRIVATE LIMITED (21). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Jaipur projects listed above?

Compare each project against its neighbours, not against the brochure. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Jaipur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What if a Jaipur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own RERA Rajasthan filings, and we read every report.

Report an errorShare feedback

Data from official RERA Rajasthan filings.

Report an error or share feedback

About Jaipur district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.