MahaRERA collects a parking block on every project: how many two wheeler spaces, how many four wheeler, how many for visitors, and where they sit. Read across 43,761 published filings, it answers one question well and refuses another entirely.
Key takeaways
- 34,554 of 43,761 projects file the parking block with every single count at zero. That is 79 percent, and it is the first thing to know about this data.
- Among the 9,207 projects that do file a number, the totals are 689,610 car spaces and 721,084 two wheeler spaces.
- The median filing project provides 0.54 car spaces per flat, which is almost exactly the 0.5 that Table 8-B prescribes for the 40 to 80 sq m band.
- Provision per flat runs from 0.92 in Pune down to 0.31 in Palghar, an ordering that broadly follows the Table 8-C multiplying factors.
- Visitor parking is 3.3 percent of filed car spaces, and only 1,016 projects record any at all.
- You cannot audit parking compliance from a filing, because the code keys on carpet area and MahaRERA does not publish carpet areas.
The finding that has to come first
Of the 46,654 published projects outside Mumbai, 43,761 carry parking detail rows. That looks like excellent coverage, and it is not.
Source: ReraGenie analysis of the MahaRERA project registry, 43,761 of 46,654 published projects outside Mumbai City and Mumbai Suburban carrying parking detail rows, captured 11 August 2026
Seventy nine percent of projects file the block and leave it empty. The rows exist, the structure is there, and every number in it is zero.
This is worth stating carefully because it is easy to turn into a false headline. It does not mean four in five Maharashtra projects provide no parking. It means four in five do not record how much they provide.
The distinction matters for anyone using this register. A naive read of the raw data, counting a zero as a zero, gives a median of 0.19 car spaces per flat and produces the claim that 42 percent of projects offer no car parking at all. Both figures are artefacts of the blank filings, and both would be wrong. Every number in the rest of this article is computed on the 9,207 projects that filed something.
Where a number is filed, it tracks the code
Source: ReraGenie analysis of the MahaRERA project registry, 8,689 published projects outside Mumbai filing both a total unit count and a non-zero car parking figure, captured 11 August 2026
The median is 0.54 car spaces per flat, with a quarter of projects below 0.30 and a quarter above 0.99. The tenth percentile is 0.14 and the ninetieth is 1.47.
That median is the interesting number, because Table 8-B asks for one car space for every two tenements in the 40 to 80 sq m carpet area band, which is 0.5 per flat before any city factor. The middle of the market is filing almost exactly the code's figure for the band most Maharashtra flats fall into.
Read that as consistency, not as proof of compliance. Two things stop it being a compliance check.
The code's requirement depends on carpet area, and the filings do not carry one. MahaRERA has a carpet area field and it is zero on every record in the corpus, so the band a project falls into cannot be determined from its filing.
And the requirement is a minimum. A project filing 0.54 might be meeting a 0.5 requirement with a little spare, or comfortably exceeding a 0.2 requirement in a Regional Plan area, or falling short of a 1.0 requirement for larger flats. The filing does not say which.
The geography follows the factor table
Source: ReraGenie analysis of the MahaRERA project registry, districts with 500 or more published projects filing car parking, captured 11 August 2026
Pune files nearly three times the provision per flat that Palghar does. The ordering broadly matches Table 8-C, where Pune and Thane Municipal Corporations carry a factor of 1.00, Nashik 0.9, and the other MMR corporations and CIDCO 0.8.
The correspondence is not exact, and the reasons are worth naming rather than smoothing over. A district is not an authority: Pune district contains PMC and PCMC at 1.00 alongside Regional Plan land at 0.40, and Thane district spans Thane MC at 1.00, other MMR corporations at 0.8 and Regional Plan areas. Flat sizes differ between districts too, and Table 8-B keys on those. What the chart shows is that filed provision varies across the state in the same direction the code intends, by roughly the magnitude the factor table implies.
Two wheelers outnumber cars
Across the filing cohort the totals are 689,610 car spaces and 721,084 two wheeler spaces, so filed two wheeler provision slightly exceeds filed car provision.
That is what Table 8-B would produce. In the 40 to 80 sq m band it asks for one car and two scooters per two tenements, and below 30 sq m it asks for two scooters and no car at all. A register in which two wheeler spaces outnumber car spaces is a register describing a market of small and mid sized flats.
Bus parking is filed by very few projects, at 3,018 spaces in total, which is consistent with Regulation 8.1.1(vi) requiring a bus bay only for special buildings and for housing schemes above 500 flats.
Visitor parking is the weakest field
Table 8-B adds 5 percent visitor parking to every residential row. The register records 22,968 visitor spaces against 689,610 car spaces, about 3.3 percent, and only 1,016 projects file any visitor parking at all.
Those two bases are not strictly comparable, and the honest position is that this is a gap in the record rather than proven under-provision. The code's 5 percent is calculated on the required parking, the filed 3.3 percent is a ratio of two filed totals, and a project can provide visitor parking without recording it in this field.
But 1,016 projects out of 9,207 filers is a thin record for a requirement that attaches to every residential row in the table, and visitor parking is the provision a buyer notices first, because it is what a guest uses and what gets converted to something else after possession. If it matters to you, the answer is in the sanctioned plan, not here.
Where the parking sits, mostly unstated
The block also records a location for each row, and this is where the register is thinnest of all. About 88 percent of projects file an open space row and a closed or covered row, and then the specific structures are rare: 2.1 percent name a basement, 0.9 percent a podium, 4.6 percent a stilt or ground floor, and 69 projects a garage.
That gap has a direct regulatory consequence. Regulation 6.8(ii) excludes a stilt, podium or basement from FSI only while it is used exclusively for parking, so where the cars are is what decides whether the structure holding them is free. The filing usually does not say.
What this means for a buyer
- Do not read a zero in this field as an absence of parking. In four cases out of five it means the field was not filled in.
- Ask for the sanctioned parking plan, which Regulation 8.1 requires to be submitted as part of the building plan and which is the document that actually answers the question.
- Check what is allotted to your flat in writing, separately from the project total, since the two are different numbers and only one of them is yours.
- Ask about visitor parking specifically, because it is the least recorded field here and the first to disappear in practice.
- Establish the authority, since the factor table means a project on the far side of a boundary was lawfully required to provide less than half as much.
Where the filings come in
The parking block is a good example of what this register does and does not do. It records structure reliably and quantities poorly, so it tells you a project exists and what it declared, and leaves the checkable detail in the sanctioned plans.
What it does record well is history: ReraGenie's project analysis, Rs 2,999 for one project, reads a project's full MahaRERA filing, including the filed parking provision where it exists, the promoter's extension history with their stated reasons, the slip between original and current completion dates against the median for the same pincode, construction progress against the eleven activity checklist building by building, and complaints and litigation with case numbers. The area consolidated report covers a whole micro-market at Rs 2,999 for the first project and Rs 1,999 per additional one.
Every project's filing is free to read at reragenie.com/projects, and the requirements this data is measured against are in the parking rules.
Source: Unified Development Control and Promotion Regulations for Maharashtra, UDCPR as updated 30 January 2025. Sanctioned under the Maharashtra Regional and Town Planning Act, 1966.
Evaluating a micro-market or a land parcel?