A rooftop plant on a 64-flat tower can be sized to the subsidy headline or to the building's own electricity bill, and the two answers are far apart. Solar for a housing society comes with generous central assistance: Rs 18,000 per kW under PM Surya Ghar, up to 500 kW. But the plant a society can net meter is usually set by its common meter, and the subsidy it can claim by how many flats it has. The scheme is not small: the Ministry of New and Renewable Energy told the Lok Sabha that 40,07,355 rooftop systems had been installed by 24 July 2026, benefiting 48,21,986 households.

Key takeaways

  • PM Surya Ghar gives a group housing society or residents' welfare association Rs 18,000 per kW for a rooftop plant serving common facilities, including EV charging, up to 500 kW, counted at 3 kW per house.
  • The cap includes members' own rooftop plants, so a 64-flat society can claim on at most 192 kW, less any plants its members have installed.
  • The application is made on the national portal, pmsuryaghar.gov.in, against the consumer number of the connection the plant will serve.
  • MERC's rooftop regulations treat a housing society's common-load connection as an eligible consumer, and a net-metered plant is limited by that connection's sanctioned load or contract demand.
  • The terrace is a common area under section 2(n) of RERA, so the plant, its cost and its upkeep are a decision for the society's general body.

What you need before you start

  • Twelve months of bills for the common connection, the one that runs the lifts, pumps and common lighting. Units used each month matter more than the rupee total.
  • The consumer number, the sanctioned load and the name on the bill. If the connection is still in the promoter's name, that has to change first, as moving a connection into your name explains for a flat.
  • A terrace plan showing the water tanks, the lift machine room, the staircase head and any area that must stay clear.
  • The bye-laws and the last general body minutes, because the decision will be a resolution.
  • A list of members with their own rooftop plants, rare in a tower but possible on a top floor, because they count against the society's cap.

How the subsidy works

PM Surya Ghar: Muft Bijli Yojana was approved by the Union Cabinet on 29 February 2024 with an outlay of Rs 75,021 crore, to put rooftop solar on one crore households. A single household gets Rs 30,000 for 1 kW, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW or more. For a group housing society or a residents' welfare association, the assistance is Rs 18,000 per kW for common facilities, including EV charging, up to 500 kW, at 3 kW per house, and that upper limit includes the rooftop plants individual residents have installed.

So the cap is two caps. The 500 kW ceiling, worth Rs 90 lakh, binds only a society of 167 houses or more. A 64-flat tower is limited to 192 kW by the 3 kW rule. Maharashtra has used the scheme heavily: by March 2026 it had 4.90 lakh installations benefiting 7.79 lakh households, behind Gujarat, according to the ministry's reply in the Lok Sabha.

Net metering, and who supplies you

A rooftop plant on a common meter does not store power. It runs the lifts and pumps while the sun is up, sends what the building is not using into the grid, and draws from the grid at night. A net meter records both directions, and the bill charges for the difference.

The rules are the Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, which name a consumer catering to a common load, such as a housing society, as eligible. They were amended in 2023 and 2024. A net-metered plant is limited by the connection's sanctioned load or contract demand, within an overall cap the Commission has revised, and how a surplus left at the year's end is treated is also set by those rules. For a tower's common meter, the sanctioned load is usually the limit that binds, long before 192 kW.

Outside Mumbai the distributor is almost always MSEDCL. In Mumbai it is BEST, Adani Electricity Mumbai or Tata Power, depending on where the building stands, and each runs its own net metering process under the same regulations.

The terrace and the vote

The terrace is not the committee's to give away. Section 2(n) of the Real Estate (Regulation and Development) Act, 2016 lists terraces among a project's common areas, and once a co-operative society runs the building those areas are the society's to manage. A plant that occupies the terrace for twenty years, spends the members' money and changes the maintenance budget belongs before the general body, under the society's bye-laws. How a general body meeting is called and what members may inspect is set out in housing society member rights.

A good resolution records the plant's size, its cost and how the vendor was chosen; who maintains it and from which fund; how the saving will show in the maintenance bill; and which parts of the terrace stay clear, including access to the tanks and the staircase head that the fire audit will ask about.

The steps

1. Read the common-meter bills. Add up a year's units. You should see a steady base load from the lifts and pumps. The red flag is a proposal sized before anyone has read the bills.

2. Size the plant to the load, not the cap. A plant that makes roughly what the common meter uses in a year leaves little surplus to argue about. The red flag is a vendor proposing 192 kW because the subsidy allows it.

3. Check the cap. Multiply the flats by 3 kW, subtract members' own plants, and compare with 500 kW. You should end up with a number above the plant you need. The red flag is a member's plant nobody counted.

4. Get the connection into the society's name. The application, the net meter and the subsidy follow the consumer number. The red flag is a connection still billed to the promoter years after handover.

5. Get quotations and a structural opinion. Ask vendors who work through the national portal for a written generation estimate, and ask a structural engineer whether the terrace slab carries the frames. The red flag is a quotation with no generation figure.

6. Pass the resolution. Put the costed proposal to a general body meeting and minute the decision.

7. Apply, install and commission. The application goes through pmsuryaghar.gov.in against the consumer number. The distributor inspects the installation and fits the net meter, and the assistance follows commissioning. Ask the portal and the vendor in writing how, and into which account, the society's assistance is paid.

8. Budget for upkeep. Panels need cleaning and an inverter will need replacing within the plant's life. The red flag is a plan that ends at installation.

Tip

Size the plant from your own bills before you read any vendor's brochure. The subsidy pays per kW installed, but the saving comes only from units the building actually uses, so every kW beyond the common load buys a surplus the society cannot spend on its own lifts and pumps.

The arithmetic, on illustrative numbers

Every figure in this section is an assumption for illustration, not a quotation, a tariff or a forecast. Take the cost from your quotations, the generation from the vendor's written estimate for your roof, and the rate from your own bills.

Assume a 40 kW plant at Rs 55,000 per kW, Rs 22 lakh in all. The assistance at Rs 18,000 per kW is Rs 7.2 lakh, leaving the society Rs 14.8 lakh. Assume each kW makes 1,300 units a year, so 52,000 units, and that each unit avoided on the common meter saves Rs 8, since fixed charges stay whatever the plant makes. That is Rs 4.16 lakh a year, or Rs 3.76 lakh after an assumed Rs 40,000 of yearly upkeep.

One illustrative 40 kW plant on a 64-flat tower(rupees, all figures assumed)
Plant cost at an assumed Rs 55,000 per kWRs 22 lakh
PM Surya Ghar assistance at Rs 18,000 per kWRs 7.2 lakh
Society's net costRs 14.8 lakh
Assumed yearly saving after upkeepRs 3.76 lakh

Source: PM Surya Ghar assistance rate for housing societies (Rs 18,000 per kW); every other figure is a ReraGenie assumption for illustration

On those assumptions the plant pays for itself in about four years, and each flat's share of the net cost is about Rs 23,000 against a yearly saving of about Rs 5,900. Change the rate per unit or the generation and the answer moves, which is why the vote should rest on the society's bills and not on this page.

An analogy: buying rice in bulk at harvest

A household that buys a year's rice at harvest pays once and saves meal by meal, and the purchase makes sense only if the family actually eats that much rice. Buy twice what the family eats and the extra sits in sacks. A society's plant is the same: the money goes out once, the saving comes back unit by unit, and only the units the building uses are worth the full price.

Suresh and Kavita's tower decides

Suresh and Kavita (illustrative, as our stories always are) live in their Pune retirement flat in a tower of 64 flats with its own co-operative housing society. At the society's first general body meeting in September, a member proposed rooftop solar, and the committee was asked to come back with a costed plan. Suresh, true to habit, asked the society in writing for twelve months of common-meter bills. They showed about 4,500 units a month, a little over 54,000 a year, on a connection still in the promoter's name. Names and numbers in this story are illustrative.

The snag was the first vendor's quotation, for 120 kW, sized to the subsidy rather than the bills. A second vendor, given the bills, proposed 40 kW, close to the year's use. The committee moved the connection into the society's name first, had a structural engineer check the terrace slab, and kept the area around the tanks and the staircase head clear. At a special general body meeting, 38 members attended and 31 voted for the 40 kW plant, with the saving to be credited against service charges in the next budget. Kavita, secretary of the separate buyers' association for the registration's unfinished towers and not of this society, sat through it beside Suresh, in whose name the flat and the membership stand, and asked the one question nobody else did: who cleans the panels.

Where EV charging fits

The assistance covers common facilities including EV charging, so a society planning shared chargers can count them in the load the plant serves. A member's own charger in an allotted slot is a different matter, with its own permissions, set out in EV charging in a housing society.

What the register tells a buyer about the tower

A rooftop plant is a society decision, and none of it sits on MahaRERA. What the filing does show is the tower you would be joining. For a Maharashtra project, the Rs 499 ReraGenie buyer report sets out the sanctions, units and sales building by building, which tells you how many flats share the roof, the common meter and the capacity cap; and the permission chain, including whether the occupancy certificate slot holds a document and its upload date, which is an upload and not proof the certificate was granted.

On a new project, also ask whether a plant is already required. The state's unified building rules, which govern most of Maharashtra outside Mumbai, make solar water heating or rooftop photovoltaic compulsory on plots above 4,000 square metres, as green features that are conditions, not amenities explains, so the terrace may already be spoken for. If you are still choosing a tower, start with the project's free page on ReraGenie, which shows every filed document and building by building progress, so you know what you are joining before the society asks for your vote.

The checklist, in one place

  • Read a year of common-meter bills and add up the units.
  • Size the plant to that use, not to the subsidy cap.
  • Work out the cap: 3 kW per flat, up to 500 kW, less members' own plants.
  • Move the common connection into the society's name.
  • Get written generation estimates and a structural opinion on the terrace.
  • Pass a general body resolution recording size, cost, upkeep and the clear areas.
  • Apply on pmsuryaghar.gov.in and get the net meter from your distributor.
  • Put cleaning and the inverter into the maintenance budget.

Methodology and sources

  • PM Surya Ghar: Muft Bijli Yojana, approved by the Union Cabinet on 29 February 2024 (Prime Minister's Office release); assistance for group housing societies and residents' welfare associations as published on the Pune district administration's scheme page and the Delhi government's solar portal.
  • Installations: Ministry of New and Renewable Energy, replies in the Lok Sabha, March 2026 (Maharashtra) and July 2026 (national, as on 24 July 2026).
  • Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, as amended in 2023 and 2024.
  • Real Estate (Regulation and Development) Act, 2016, section 2(n)(iii).
  • The payback figures are ReraGenie's illustrative assumptions, not quotations or tariffs.

This article is educational and not legal advice. For a dispute, consult a lawyer who practices before your state's RERA.

Evaluating a project right now?

The ReraGenie buyer report reads every filing for one project and sets out the red flags, the checks that came back clear and what to verify before you book, each fact with its filing date. Rs 499, one time.

See the buyer report