An electric car can be booked in an afternoon. EV charging in a housing society's parking can take longer than the car's delivery, and the wait rarely comes from the electrician. It comes from not knowing whose permission is needed, in what order, and what the society may ask for. A Mumbai resident whose society had refused him a charger in his own garage, because it had no policy for such requests, took the refusal to the Bombay High Court, which ruled on it in January 2025. The question is no longer rare: official registration data reported by Down To Earth in 2026 showed 37,556 electric cars registered in Maharashtra that year up to the time of the report. This is the sequence, with the rules as they stood when we checked on 11 October 2026.
Key takeaways
- A circular of 21 November 2022 from Maharashtra's Registrar of Co-operative Societies directs a housing society to issue a member's NOC for an EV charger within seven days of the application, where the installation follows the Chief Electrical Inspector's safety advisory.
- In Amit Dholakia v State of Maharashtra (January 2025), the Bombay High Court directed the Registrar to finalise conditions for EV charging in co-operative societies through directions under section 79A of the Maharashtra Co-operative Societies Act.
- On 11 October 2026 we found no final section 79A directions; the draft model bye-laws of 2026, which cover EV charging, closed for comments on 27 August 2026.
- The Maharashtra Electric Vehicle Policy 2025 asks new residential buildings to be EV charging ready with at least one community charging point; that requirement is written for new buildings, not existing societies.
- Ask in order: the electricity distributor about load and tariff, the society for the NOC, and, until the building is handed over, the builder for consent.
What you need before you start
A fixed parking slot, allotted to you in writing. Stilt and open bays are common areas, and once the society is formed it is the society that allots them, as the rules on parking in a flat purchase explain. A slot "to be allotted" is not a slot yet.
Your electricity account, with the consumer number and sanctioned load from the bill. If the connection is not yet in your name, getting electricity, water and gas into your name comes first.
An installer's survey: the charger's papers, the cable route from your meter to the slot, and how the work meets the Chief Electrical Inspector's safety advisory for EV charging, the condition the society's seven days depend on.
The name of whoever runs the building today. Before handover a new tower is still the builder's site. In a redevelopment the old society that signed the development agreement exists alongside the builder, as the extra checks in a redevelopment purchase describe.
| Who | What they decide | What to bring them |
|---|---|---|
| Electricity distributor | Whether your load carries the charger, a load increase or separate connection, and the tariff | Consumer number, the charger's rating, the installer's load note |
| Housing society | The NOC, the cable route through common areas, your slot | A dated application, the survey, an undertaking to bear the cost |
| Builder, until handover | Consent for work on a site it still controls | The survey, and the society's NOC once issued |
| Installer | How the work is done, tested and certified | Every permission, before anything is fitted |
The steps, from application to a working charger
- 1
1. Confirm the slot
A fixed slot, allotted in writing. A charger cannot follow a rotating slot or a stack-parking pallet.
- 2
2. Survey the load and the route
An electrician maps the cable from your meter to the slot and checks your sanctioned load.
- 3
3. Ask the distributor
Load increase or separate connection, and which tariff applies, in writing.
- 4
4. Apply to the society
A dated written application. The 2022 circular gives the society seven days to issue the NOC where the work follows the safety advisory.
- 5
5. Builder's consent before handover
Until handover, the builder's written consent for work on its site and wiring.
- 6
6. Install, test and file
A licensed electrical contractor installs and tests it; every paper goes into your flat file.
Source: Commissioner for Co-operation and Registrar of Co-operative Societies, Maharashtra, circular of 21 November 2022; sequence as ReraGenie recommends it
1. Make sure the slot is yours, and fixed
You should see an allotment letter naming the slot and its level, or a general body resolution. The red flag is anything that moves: annual rotation, a ballot, a "floating" slot, or a stack system where the car rides a pallet. A charger on a slot the society later reallocates sits in somebody else's space.
2. Get the installer's survey
You should see the charger's specification sheet, the cable length, and where the cable crosses common areas such as the electrical shaft. The red flag is a plan to tap a common light circuit or any supply the society pays for: the shortest cable run, and the surest route to a refusal.
3. Talk to the distributor before the society
The society will ask where the power comes from. The charger may fit within your sanctioned load or need a load increase, or the distributor may offer a separate connection; ask which tariff the charger's units fall under and keep the answer in writing. The red flag is drawing from the society's common meter without a sub-meter, which turns your charging into everyone's bill.
4. Apply to the society in writing
Name the slot, attach the survey and the charger's papers, state that the work follows the safety advisory, and undertake to bear the cost of the equipment, the installation and the electricity. Success is an NOC. The red flags are silence past seven days, or a refusal with no safety or technical reason, such as "we have no policy", which is the refusal the High Court case began with.
The seven days run from your application, so the application has to prove its own date. Have your copy signed and dated by the secretary or the society office, or send it by a method that leaves a dated record. An application nobody can date is a clock nobody can read.
5. Before handover, the builder too
A society's NOC covers what the society controls. A tower not yet handed over is still the builder's site, so get the builder's written consent as well; a verbal yes from a site office is not a record. A fitting you added is also the first thing a builder points to when a defect appears nearby, which is why renovation rules for a flat treat permissions as paperwork.
Whether handover is weeks or a year away is the question the filing answers best. The project's free page on reragenie.com shows whether the occupancy certificate slot holds a document and when it was uploaded (an upload, not proof the certificate was granted), and a project watch emails you when that project's filing changes.
6. Install, test and file
You should see a test report and an invoice. File them with the NOC and the consent, beside the papers in the first twelve months of owning your flat. The red flag is a charger with no paperwork: the society, the builder and a future buyer of your flat will all ask for it.
An analogy: the air conditioner on the outside wall
A split air conditioner in a society flat works the same way. The appliance is yours and you pay for it. The outdoor unit hangs on a wall that belongs to everyone, so the society has a say in where and how it is fixed. The power comes through your own meter, and if the load is too much, that is between you and the electricity company. An EV charger is the same arrangement with a longer cable.
The rules still being written
The 2022 circular. On 21 November 2022 the Commissioner for Co-operation and Registrar of Co-operative Societies in Pune directed housing societies to issue a no-objection certificate for a member's EV charger within seven days of the application, on condition that the installation follows the Safety Advisory for EV Charging Stations issued by the Chief Electrical Inspector. That condition is the society's legitimate ground: it can insist the work is safe.
The 2025 High Court direction. In Amit Dholakia v State of Maharashtra (2025:BHC-OS:1513-DB), a division bench of Justices G S Kulkarni and Advait Sethna heard the resident refused for want of a policy, whose approaches to the authorities, the Registrar included, had produced no action. The State told the court that draft conditions for permitting private EV charging in housing societies were being prepared. In January 2025 the court directed the Registrar of Co-operative Societies to finalise those conditions through directions under section 79A of the Act, and noted that housing societies' bye-laws would need amending to carry EV charging provisions.
Where it stood on 11 October 2026. The Co-operation Department published draft Model Bye-Laws 2026 for co-operative housing societies, covering EV charging among other subjects, with comments due by 27 August 2026; a public consultation in Pune on 13 August 2026 discussed the EV charging provisions with the rest. When we checked, we found no final section 79A directions on EV charging and no adopted version of the revised bye-laws; it is the same draft that the guide to maintenance charges follows. Until a final text arrives and your society adopts it, the 2022 circular and your society's existing bye-laws are what a member can point to.
What the 2025 EV policy does, and does not do, for a flat owner
The state cabinet approved the Maharashtra Electric Vehicle Policy 2025 on 29 April 2025. It runs from 1 April 2025 to 31 March 2030, carries an outlay of Rs 1,993 crore over five years, and aims for 30 percent of new vehicle registrations in the state to be electric by 2030. For buildings, its published provisions ask new residential buildings to be EV charging ready, with at least one community charging point.
Nothing we found in it orders an existing society to say yes; that is left to the circular and the bye-laws. Its most visible benefit to a private car owner is on the road rather than in the parking: from 22 August 2025 the state exempted electric four-wheelers from tolls on the Mumbai-Pune Expressway, the Samruddhi Mahamarg and Atal Setu.
Source: Down To Earth, India on e-wheels series, citing official registration data, 2026
Neha's application
Neha (illustrative, as our stories always are) is weeks from the keys to her 640 square foot 2BHK in a Mulund society redevelopment, bought for about Rs 1 crore with a Rs 60 lakh loan. She has booked an electric car due around the time she moves in, and assumed the charger meant calling an electrician. Names and numbers in this story are illustrative.
The snag was the calendar. The new tower has not been handed over: the builder still runs the site, the old society that signed the development agreement will run it once it is, and her parking allotment letter, for a slot on the second podium level, came from the builder. So her first letter went to the society secretary, not the electrician, asking the society to confirm the slot as hers once it takes over.
The installer's survey put about 40 metres of cable between her meter in the ground-floor meter room and the slot, through the common electrical shaft, and quoted about Rs 55,000 for the charger, the cable and the fitting. Her meter was still in the builder's name, so a load increase had to wait for the transfer; she added it to her possession list and asked the distributor's office, in writing, which tariff a home charger falls under.
Then she wrote two letters on the same day: an application to the society for its NOC, with the survey, the charger's papers and an undertaking to bear the cost and the electricity, and a request to the builder for consent to run the cable through the shaft before handover. The secretary signed and dated her copy. That date is where the seven days begin.
What ReraGenie shows for a building you are waiting on
Neha's timing turns on one question the filing speaks to: when the builder hands the tower over. The free project page shows the possession timeline, the first promised date against the current one, and the permission chain, including whether the occupancy certificate slot holds a document and its upload date.
The Rs 499 buyer report goes further for the same project: the possession story set out from the filing; sanctions, units and sales building by building, which in a redevelopment is where the sale tower and the rehab building separate when the filing itemises both; and a list of what to verify, each fact with its filing date. It includes a free 90-day project watch that emails you when that project's filing changes, so an occupancy certificate upload does not pass unnoticed.
The checklist
- A fixed slot, allotted to you in writing.
- The installer's survey: charger papers, cable route, load, and how the work meets the Chief Electrical Inspector's safety advisory.
- A written answer from the distributor on load, connection and tariff.
- A dated application to the society, with an undertaking to bear the cost.
- The builder's written consent if the building has not been handed over.
- Installation by a licensed electrical contractor, a test report, and every paper in your flat file.
If the society does not answer, a member's rights to meetings and records are set out in what a society member may ask for.
Methodology and sources
- The circular of 21 November 2022, as described in published legal commentary and press reports; we did not obtain its full text.
- Bombay High Court, Amit Dholakia v State of Maharashtra, 2025:BHC-OS:1513-DB, January 2025, as reported.
- Draft Model Bye-Laws 2026 for co-operative housing societies, and the Maharashtra Electric Vehicle Policy 2025, as reported.
- Down To Earth, India on e-wheels series, 2026, for the registration figures.
- The status of the section 79A directions and the bye-laws was checked on 11 October 2026.
This article is educational and not legal advice. For a dispute, consult a lawyer who practices before your state's RERA.