On 8 July 2026, a release of 27,203 cusecs from Khadakwasla dam sent water into the parking areas of housing societies along Sinhagad Road, an official of the city's disaster management office told the Free Press Journal. On 31 July the release was raised from 35,574 to 43,571 cusecs, floodwater entered three housing societies in Ekta Nagar, and about 40 families were moved to safety. A flood line check on a Pune property takes a few letters and an afternoon on the ground, and no MahaRERA filing does it for you, because the filing has no field for flood lines.

Key takeaways

  • Maharashtra's Water Resources Department draws two flood lines along a river: the blue line at the level of a flood expected once in 25 years, and the red line at the level of one expected once in 100 years.
  • Under UDCPR Regulation 3.1.3, the land between the river bank and the blue line is a prohibited zone for construction except open uses such as parking, gardens and pipelines, and between the blue and red lines construction may be permitted at 0.45 m above the red flood line level.
  • Where no flood line has been marked, a tentative blue line is drawn from the highest floods on record, and 50 m on its landward side is a no construction zone.
  • Lines on a development plan stand modified whenever the Water Resources Department modifies them, so the current map comes from its irrigation division, not from an old plan sheet.
  • A MahaRERA filing records no flood line; the planning authority named in the filing and the irrigation division are the two offices that can answer the question.

What the two lines are

The Water Resources Department, which the building regulations still call the Irrigation Department, draws two lines along a river. The blue line is the level a flood is expected to reach once in 25 years; the red line, further from the bank, the level of one expected once in 100 years. That is not a century of safety. A 1-in-100 flood has a 1 percent chance in any year, about a 26 percent chance of at least one across 30 years; the 1-in-25 flood comes out at about 71 percent. That is arithmetic on the definitions, not a forecast for any river.

What may be built near them is set by Regulation 3.1.3 of the Unified Development Control and Promotion Regulations (UDCPR), which govern building permission in Pune, Pimpri-Chinchwad and the PMRDA area alike:

  • River bank to blue line: a prohibited zone for any construction except parking, an open vegetable market, gardens, lawns, open space, cremation and burial grounds, a sewage treatment plant, pipelines and public toilets. An existing authorised building there may be redeveloped at a plinth 0.45 m above the red flood line level.
  • Blue line to red line: a restrictive zone, where construction may be permitted at a height of 0.45 m above the red flood line level.
  • No line marked yet: a tentative blue line is drawn from the maximum observed flood records and from talking to residents, approved by the department's Chief Engineer, and 50 m on its landward side is a no construction zone.

Rivers are not the only water. Regulation 3.1.1(ii) makes a site ineligible if the whole of it lies within 6.0 m of a minor water course such as a nallah, or 15.0 m of a major one such as a river. Both rules sit among fourteen reasons a site may not be buildable, and the green belt along rivers has its own rule card. The September 2019 floods, which killed at least 17 people in Pune after 87.3 mm of rain fell in a day, Down To Earth reported, did most of their damage along a stream, the Ambil Odha, and a nallah.

What you need before you start

  • The project's MahaRERA registration number, and from its filing the survey or CTS numbers of the land and the planning authority the promoter named.
  • The survey number checked against the land record. The 7/12 extract and property card explains how to read it.
  • The sanctioned plan. UDCPR Regulation 2.6.4 asks the Authority to put it on its website, as sanctioned plans online explains.
  • A map, and an hour to find every river, stream and nallah within a kilometre of the gate.

The steps

Step 1. Read the location off the filing, not the brochure

A brochure's locality is a marketing choice. The filing names the land and, on many registrations, the sanctioning body, usually PMC, PCMC or PMRDA in Pune district; PMRDA vs PMC explains why it matters which.

What you will see: survey numbers and an authority's name. Red flag: a filing that names no authority, or survey numbers that do not match the 7/12 the promoter shows you.

Step 2. Find every water course near the plot

Look for the river, then for streams, nallahs and canals, including straightened or covered ones. A nallah along the boundary falls under Regulation 3.1.1(ii) whether or not any flood line has been drawn for it.

What you will see: the nearest water and its distance from the buildings. Red flag: a nallah along or through the plot, or a stretch of bank that has been filled and walled.

Step 3. Get the development plan extract for the survey number

Ask the town planning office of the authority the filing names, in writing, for an extract of the development plan for the survey number. It shows the zone, any reservation and any flood line marked on the plan.

What you will see: the zone colour, and blue and red lines if they are marked on that sheet. Red flag: a plot cut by the blue line, or a sheet with no lines at all near a river, which means the question has moved to the irrigation division.

Step 4. Ask the irrigation division for its current map, and the year of the study behind it

Regulation 3.1.3 says the lines on a development plan stand modified as and when the department modifies them, so the department's own map is the one that counts. For the Mutha that is the Khadakwasla Irrigation Division, and the lines in use there rest on a hydraulic study of 2011: a November 2022 reply from that division, filed in a National Green Tribunal case, said no new study had been done when the lines were marked on Google Maps in 2016.

They may change. After the 2024 floods, Chief Minister Eknath Shinde said on 5 August 2024 that Pune's blue flood line would be re-surveyed. In September 2026, Punekar News reported that the Central Water and Power Research Station would study afresh the flood-carrying capacity of the Mula and Mutha, over nearly 44 km from the dams to PMC's limits, after the Maharashtra Engineering Research Institute found that capacity below what major floods require.

What you will see: a map of that stretch with both lines and a study date. Red flag: the development plan sheet and the department's map disagree. Ask which one the building permission used.

Warning

A flood line on an old plan sheet is not necessarily the flood line. Marking is still incomplete in parts of the state: in a case about the state's rivers, the National Green Tribunal's western zone bench in September 2023 gave the department a four-month outer limit to finish marking the lines in Dhule, Nandurbar and Jalgaon districts. Ask for the current map and its date every time, even for a plot you checked last year.

Step 5. Read the plan the building was sanctioned on

The particulars of development that go with every permission application under the UDCPR (Appendix A-1) ask whether the land is subject to restrictions of a blue or red flood line, with details and any no-objection certificate. So the promoter's architect has answered this once already, to the planning authority. Ask for that answer. On the site plan, a building in the restrictive band should show its plinth 0.45 m above the red flood line level; how to read a sanctioned plan explains the drawing.

What you will see: the lines across the site plan, and the levels of the plinth and any basement. Red flag: a promoter who cannot say what the application answered, or flats or electrical rooms set below the red-line level.

Before you write to the promoter, look the project up on ReraGenie's free project pages. The filing names the sanctioning authority wherever the promoter filed one, which is the office holding that answer, and the permission chain shows whether the building plan approval slot holds a document and when it was uploaded, a record of an upload rather than proof of a permission.

Step 6. Walk the ground and ask the neighbours

The regulation tells the department to draw a tentative line from the floods on record and by talking to residents, so do the same. See whether the plot sits above or below the road and the bank, ask the oldest shopkeeper nearby how high the water came in 2019, 2024 and 2026, and look for tide marks on compound walls.

What you will see: the lie of the land and the local memory of floods. Red flag: fresh earth filling that has raised the plot, or a single approach road that runs lower than the buildings.

Step 7. Put the question to the promoter in writing

Ask where the lines run against each building, which map the permission relied on and its date, what lies below the red-line level, and how the site is reached when the lane floods. Keep the reply.

What you will see: an answer you can hold the promoter to. Red flag: "the area has never flooded", in place of a map.

From the address to the flood-line answer
  1. 1

    1. The address

    Read the survey numbers and the sanctioning authority off the MahaRERA filing.

  2. 2

    2. The water

    Find the river and every stream, nallah or canal within a kilometre.

  3. 3

    3. The development plan extract

    From the planning authority: zone, reservations and any flood line on the sheet.

  4. 4

    4. The irrigation division's map

    The current blue and red lines for that stretch, and the year of the study behind them.

  5. 5

    5. The sanctioned plan

    What the application said about flood lines, and the plinth level against the red line.

  6. 6

    6. The ground

    The lie of the land, the approach road and what the neighbours remember.

  7. 7

    7. The written answer

    The promoter's reply on the lines, the map date and the way out in a flood.

Source: UDCPR (consolidation of 30 January 2025), Regulations 3.1.1 and 3.1.3 and Appendix A-1

Where the lines have been tested

Public works have met the same lines. In January 2017 the National Green Tribunal's western zone bench put an interim stay on metro construction in the Mula-Mutha riverbed and told the PMC not to build in a 1.7 km stretch inside the blue line until its next hearing. A PMC committee later blamed the July 2024 flooding on Sinhagad Road partly on encroachments within the Mutha's blue line and on dumped debris, Pune Pulse reported. Neither tells you where a particular building stands; the steps above do.

An analogy: the tide marks on a beach

A beach shows two marks: where an ordinary high tide reaches, and the debris line of the worst storm anyone remembers. Nobody puts a bedroom below the first; above the second, careful people build on a raised plinth. The blue and red lines are those two marks drawn for a river, and the 0.45 m rule is the raised floor.

Suresh and Kavita's riverside option

Suresh and Kavita (illustrative, as our stories always are) had three Pune projects on their list before they booked. One stood on a bend of the river, its brochure leading with a riverside walking track. Kavita, a retired bank officer, asked the promoter for the development plan extract and the sanctioned site plan, and wrote to the irrigation division for its map of that stretch. Names and numbers in this story are illustrative.

The answers agreed, which was the first thing she checked. The tower stood outside the red line, and the walking track and a lawn lay inside the blue line, uses the regulation allows there. The snag was the band between: the club house sat in it, its plinth drawn 0.45 m above the red-line level, and the only lane to the main road ran lower than the plot, along the bank. The department's map rested on the 2011 study.

Nothing on the file broke a rule. What Kavita could not get was an answer to her own question: on a night the river reached the red line, how would two people in their late fifties get out? They chose a project on higher ground with no water course within a kilometre, and paid Rs 95 lakh for the flat from the Ahmedabad proceeds, with no loan. A kilometre from a nallah is no guarantee, but it was a question with an answer.

What the buyer report adds around this check

No MahaRERA filing records a flood line, so no report built from the filings can place one. What the Rs 499 ReraGenie buyer report reads around this check:

  • Land and title as five questions: who owns the land as filed, the promoter's right to build and sell, whether the land is mortgaged, what the legal title report concludes and the exceptions it attaches, and any disputes.
  • Projects within 2 km, which shows what else is registered around the same site.
  • What the filings do not contain, in a section of its own, so you know which checks stay with you; the flood line is one of them.

It includes the project's filed documents as a ZIP and a free 90-day project watch. See what the buyer report covers.

The checklist

  • Survey numbers and sanctioning authority, from the MahaRERA filing.
  • Every river, stream, nallah and canal within a kilometre.
  • The development plan extract for the survey number.
  • The irrigation division's current lines, and the study year.
  • The application's flood-line answer, and the plinth level on the site plan.
  • The approach road, and the neighbours' memory of the water.
  • The promoter's answer in writing, map date included.

Methodology and sources

  • UDCPR, consolidation of 30 January 2025: Regulations 2.6.4, 3.1.1 and 3.1.3 and Appendix A-1.
  • Flood-line definitions: Water Resources Department practice as described in National Green Tribunal proceedings.
  • Floods: Down To Earth (September 2019), The Week (August 2024), Free Press Journal (July and August 2026), Punekar News (September 2026), Pune Pulse.
  • Tribunal: western zone bench orders of January 2017 and September 2023 as reported; the Khadakwasla Irrigation Division's reply of November 2022, annexed to a tribunal filing.

This article is educational and not legal advice. For a dispute, consult a lawyer who practices before your state's RERA.